Skylight Cost Calculator Malaysia
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
☀️ Free Calculator

Skylight
Cost Calculator

Estimate the installed cost of one or more skylights — pick the type and size, enter the quantity and add access work for a high or internal roof. Indicative 2026 Klang Valley ranges from our skylight cost guide.

📍 We serve KL, Selangor & Putrajaya.

Roofer sealing the flashing around a new glass skylight on a tiled roof

Skylight cost estimator

Small is under 1.0 m²; medium is 1.0–2.5 m².

Single-storey roofs on landed homes are the easiest to reach.

How this estimate works

Skylights are priced per unit installed, so the calculator multiplies the range for your type by the number of skylights. A small fixed polycarbonate skylight is RM1,500–RM3,500; in tempered or laminated glass it is RM3,500–RM7,000. A medium fixed skylight is RM3,000–RM6,500 in polycarbonate and RM6,000–RM12,000 in glass. A vented glass skylight with a manual crank is RM6,000–RM12,000, and a motorised one with a rain sensor is RM10,000–RM18,000+. A tubular skylight, for rooms with no direct roof above them, is RM1,800–RM4,000.

Access is the extra most people forget. A single-storey roof is quick to reach, but a multi-storey roof or an internal lightwell needs scaffolding or ladders, which our guide prices at RM500–RM2,000 for the job. The calculator adds it once, not per skylight. Waterproofing is already part of a proper install and should never be the line that gets cut, because a poor flashing detail is the usual cause of a leaking skylight.

The ranges come from our skylight cost guide. The roof type matters: tile, metal deck and flat concrete roofs each need a different flashing detail. When the range suits you, WhatsApp ClickBina the roof type, the room and the size you have in mind for a flat price with no hidden charges — we'll reply as soon as we can. A site visit is free.

The formula

Estimate = number of skylights × installed range for the type + RM500–RM2,000 for access on a multi-storey or internal roof. Low and high ends are added separately; a “+” means the top end is open.

What moves the price

FactorHow it changes your quote
GlazingPolycarbonate is the budget choice; tempered or laminated glass costs more and lasts longer.
SizeMedium skylights need larger openings and more framing than small ones.
Opening typeVented skylights add a crank or a motor; motorised units need wiring and a rain sensor.
Roof typeTile, metal deck and concrete roofs each need their own flashing and sealing detail.
AccessHigh roofs and internal lightwells need scaffolding or ladders.
HeatLarge glass areas let in heat; a solar-control coating helps in our climate.

Indicative estimate only, not a quotation — final pricing after we see the job details or the site.

Get a quote for your job

WhatsApp us the job and rough measurements — we'll reply as soon as we can. Our prices are flat, with no hidden charges. A site visit is free.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesSSM-registered

Common Questions

How much does a skylight cost in Malaysia?
Indicative Klang Valley installed ranges are RM1,500–RM3,500 for a small fixed polycarbonate skylight, RM3,500–RM7,000 for small fixed glass, RM10,000–RM18,000+ for a vented motorised glass skylight and RM1,800–RM4,000 for a tubular skylight.
What is the cheapest type of skylight?
A small fixed polycarbonate skylight at RM1,500–RM3,500. A tubular skylight at RM1,800–RM4,000 suits rooms with no roof directly above.
How much does a motorised skylight cost?
A vented glass skylight with a motor and rain sensor is RM10,000–RM18,000+; with a manual crank it is RM6,000–RM12,000.
Why do skylights leak?
Most leaks come from poor flashing and sealing at the roof opening, not from the skylight itself. Ask for the waterproofing detail to be written into the quote.
Does ClickBina install skylights?
Yes. WhatsApp us the roof type, the room and the size for a flat price with no hidden charges — we'll reply as soon as we can. A site visit is free.
Is this skylight calculator a quotation?
No. It is a planning range from published Klang Valley figures, not a quotation. The final price depends on the roof, the glazing and the access.

Want a proper quote?

WhatsApp us what you are planning and rough measurements — we'll reply as soon as we can. A site visit is free.

WhatsApp ClickBina← All Tools
💬 WhatsApp for a quote