Kitchen Cabinet Door Replacement Cost Calculator Malaysia
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🗄 Free Calculator

Cabinet Door Replacement
Cost Calculator

See what refreshing your kitchen doors costs against rebuilding it — the reface band, the hardware you may want to change, and a per-foot rebuild figure to compare. Indicative 2026 Klang Valley ranges.

📍 We serve KL, Selangor & Putrajaya.

Carpenter removing a worn kitchen cabinet door with new door panels ready

Cabinet door replacement estimator

Reface = new or resprayed doors on your existing boxes. Rebuild = new boxes and doors, priced per foot run for comparison.

Used only when you pick a per-hinge option above.

Measure along the wall; count base and wall units on the same run once.

How this estimate works

Door-only work is quoted by scope after measuring, not from a per-door rate card, because door counts, sizes and finishes vary too much. So this calculator does not multiply by doors. It shows the published band for a respray or reface of the cabinet doors on a typical rental-unit refit — RM800–RM2,500, usually a compact condo kitchen — and tells you where a bigger or smaller kitchen sits against it.

Hardware is the part you can count. Hinge replacement across a set of doors runs RM100–RM300 fitted. If you would rather price the parts, standard hinges are RM3–RM8 each, generic soft-close RM8–RM20 and Blum, Hettich or Hafele soft-close RM18–RM40 — hardware only. Ball-bearing drawer runners are RM25–RM60 per pair and a lift-up flap mechanism RM250–RM600 per door. New doors normally go on with new hinges, so the reface option does not add hinges on top.

The rebuild option is there for comparison: a full kitchen is priced per foot run — RM180–RM300 in melamine, RM280–RM420 in laminate, RM350–RM600 with an MR plywood carcass and RM400–RM700 in full aluminium. If the wet-side boxes are being rebuilt anyway, upgrading them to MR plywood adds RM30–RM60 per ft run. The figures come from our cabinet door replacement cost guide. ClickBina replaces and refaces kitchen cabinet doors: WhatsApp us your job details for the kitchen, the sink base and the hinges for a free quote. A site visit is free.

What moves the price

FactorHow it changes your quote
Carcass conditionNew doors only make sense on dry, square boxes. A soft sink base or swollen edges mean a rebuild of that run, not new fronts.
Kitchen sizeThe reface band describes a compact condo kitchen; more doors, drawer fronts and a tall unit move you above it.
FinishMelamine is the value choice, laminate is tougher on base units, and a sprayed finish can be resprayed later but chips at the edges.
HingesNew doors on tired hinges sag within months. Branded European soft-close costs more per hinge than generic.
Colour matchingAn exact match for an old laminate is often gone. Replace whole runs, or go deliberately two-tone, rather than single doors.
End panels and plinthIf the fronts change colour, the exposed end panels and plinth usually need to change too, or the old colour shows at every end.

Indicative estimate only — final pricing after a photo assessment or site visit.

Get your exact price

WhatsApp us your job details for a free quote.

💬 Get a Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How much does kitchen cabinet door replacement cost in Malaysia?
A respray or reface of the cabinet doors on a typical rental-unit refit is priced at RM800–RM2,500 (indicative 2026, Klang Valley). A larger kitchen with more doors and drawer fronts sits higher; a small galley lower.
Is there a price per cabinet door?
No published one. Sizes, finishes and edge details vary too much, so single doors are priced on inspection. That is why this calculator shows a band instead of multiplying by doors.
Is refacing cheaper than a new kitchen?
Usually, when the boxes are sound. A rebuild runs RM180–RM300 per ft run in melamine and RM280–RM420 in laminate, and normally brings a new worktop too; new doors keep your boxes, shelves and worktop.
How much do soft-close hinges cost?
As hardware, RM3–RM8 each without soft-close, RM8–RM20 for generic soft-close and RM18–RM40 for Blum, Hettich or Hafele. Hinge replacement across a set of doors is RM100–RM300 fitted.
Can I replace doors on a water-damaged cabinet?
Not on the damaged run. A swollen sink base or bloated edges will make new doors hang crooked and swell the same way. Rebuild that run, ideally with an MR plywood carcass, and reface the dry side.
How accurate is this calculator?
It gives planning ranges from published 2026 Klang Valley figures, not a quotation. WhatsApp ClickBina photos of your kitchen for a free quote; a site visit is free.

Need a Real Quote?

WhatsApp us your job details and measurements — the quote is free.

WhatsApp ClickBina← All Tools
💬 Get a Free Quote