Sofa, Mattress & Carpet Cleaning Price Calculator Malaysia
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🛋 Free Calculator

Sofa, Mattress & Carpet Cleaning
Price Calculator

Count your seats, beds and rugs and get an instant planning range for fabric care — sofa, mattress and carpet cleaning in one estimate. Indicative 2026 Klang Valley market ranges.

📍 We serve KL, Selangor & Putrajaya.

Technician extracting dirt from a fabric sofa with an upholstery cleaning wand

Fabric care cleaning estimator

A 3-seater counts as 3 seats. Count an L-shaped sofa under sectionals instead.

Length × width in feet. Leave at 0 if you only have loose rugs.

How this estimate works

Fabric care is priced by the piece, so the calculator simply counts what you have. Upholstery goes by the seat: RM30–RM60 per seat for a fabric sofa and RM40–RM80 per seat for leather, which is cleaned and then conditioned. An L-shaped or large sectional is RM200–RM400, a single armchair or recliner RM40–RM90 and fabric dining chairs RM15–RM30 each — a typical 3–5 seater set lands around RM150–RM300.

Mattresses are priced by size: RM60–RM100 for a single or super single, RM90–RM150 for a queen, RM120–RM190 for a king and RM40–RM70 for a baby cot mattress. Carpet is priced by the area cleaned: RM1.50–RM3 per sq ft for wall-to-wall carpet by hot-water extraction, RM60–RM120 for a small area rug and RM120–RM280 for a large one. Doing several items in one visit usually brings the per-item price down, which the low end of each range reflects.

The rates come from our sofa, mattress and carpet cleaning guides. The calculator does not add enzyme treatment for urine or heavy stains, deep pet-odour work or hand cleaning of wool and handmade rugs — those are quoted after a photo. ClickBina cleans sofas, mattresses and carpets across KL and Selangor: WhatsApp us your job details and a quick count for a free quote at a flat price, no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.

What moves the price

FactorHow it changes your quote
MaterialLeather costs a little more per seat than fabric because it is cleaned and then conditioned.
SoilingHeavy soiling, food and drink stains or urine need an enzyme treatment on top of the base clean.
Pet odourDeep pet-odour work reaches into the foam and padding, so it is quoted separately after a photo.
Size and pileLarger rugs and deeper pile take longer to extract and dry, which moves a rug up its range.
QuantitySeveral items in one visit share the travel and setup, so the per-piece price drops.
DryingIn Klang Valley humidity, good airflow after extraction matters. Plan the clean for a day when windows or a fan can run.

Indicative estimate only — final pricing after a photo assessment or site visit.

Get your exact price

WhatsApp us your job details for a free quote.

💬 Get a Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How much does sofa cleaning cost in Malaysia?
Upholstery is priced per seat: about RM30–RM60 per seat for fabric and RM40–RM80 for leather, so a 3–5 seater set lands around RM150–RM300. An L-shaped sectional is RM200–RM400.
How much is mattress cleaning?
By size: RM60–RM100 for a single or super single, RM90–RM150 for a queen and RM120–RM190 for a king. A baby cot mattress is RM40–RM70.
What is the carpet cleaning price per sq ft?
Wall-to-wall carpet is usually RM1.50–RM3 per sq ft by hot-water extraction. Loose rugs are priced per piece: RM60–RM120 for a small rug and RM120–RM280 for a large one.
Can I combine sofa, mattress and carpet cleaning in one visit?
Yes, and it usually lowers the per-item price because travel and setup are shared. Enter everything you want cleaned and the calculator adds it up.
Are stain and odour treatments included?
No. Heavy urine or stain treatment and deep pet-odour work are quoted as add-ons after a photo, so they are not in this estimate.
How accurate is this calculator?
It gives a planning range from published 2026 Klang Valley market rates, not a quotation. WhatsApp ClickBina a photo and a count of your items for a free quote.

Need a Real Quote?

WhatsApp us your job details and measurements — the quote is free.

WhatsApp ClickBina← All Tools
💬 Get a Free Quote