Kitchen Renovation Cost Calculator Malaysia (2026)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🍳 Free Calculator

Kitchen Renovation
Cost Calculator

Estimate a whole-kitchen renovation budget — pick the scope and size, then tick the extras that change the number most. Indicative 2026 Klang Valley ranges from our kitchen renovation cost guide, shown as a range.

📍 We serve KL, Selangor & Putrajaya.

Half-renovated wet kitchen with new base cabinets and capped plumbing points

Kitchen renovation estimator

Mid-range already includes new cabinets, worktop, full tiling, a wet & dry split and lighting.

Only offered on the basic refresh — the mid-range and premium scopes already allow for it.

The premium scope already includes built-in appliances.

How this estimate works

A kitchen is priced as a whole job, so the calculator starts from the range for the scope you choose. A basic refresh — repainting, a new splashback, refurbished cabinets and a new sink and tap — is RM8,000–RM15,000. A mid-range kitchen with new cabinets, worktop, full tiling, a wet & dry split and lighting depends mostly on size: RM12,000–RM20,000 for a small apartment kitchen, RM20,000–RM35,000 for a medium terrace or standard condo kitchen, and RM35,000–RM70,000+ for a large semi-D or bungalow kitchen with an island. A premium kitchen with custom cabinetry, quartz or solid-surface tops, an island and built-in appliances is RM45,000–RM80,000+.

Three extras are added only when you tick them. A wet & dry split adds RM5,000–RM12,000 to a basic refresh; the other scopes already allow for it. A new hood and hob is RM1,500–RM3,000 — if yours still work, keep them. Moving the sink or hob to a new position is the line most often left out of a first budget: the plumbing and wiring alone can add RM3,000–RM8,000.

The ranges come from our kitchen renovation cost guide. Cabinets are usually the biggest single line, so if you want a closer number for them, use the kitchen cabinet calculator linked below. When the range fits your plans, WhatsApp ClickBina photos of the kitchen and its rough size. When the kitchen is part of a whole-house refurbishment, we coordinate the trades — carpentry, tiling, plumbing and wiring — under one flat price with no hidden charges; for a kitchen-only job, WhatsApp us your job details for a quote. A site visit is free.

The formula

Estimate = scope range + RM5,000–RM12,000 (wet & dry split, basic refresh only) + RM1,500–RM3,000 (new hood and hob, not premium) + RM3,000–RM8,000 (moving the sink or hob). Low ends and high ends are added separately.

What moves the price

FactorHow it changes your quote
Cabinet materialMelamine is the budget choice for a dry kitchen; moisture-resistant plywood or aluminium lasts far longer near water.
WorktopQuartz and solid surface cost more than tile or laminate tops, but take heat and stains better.
Kitchen sizeMore running feet of cabinets and more wall and floor to tile push a kitchen up its range.
Wet & dry layoutA second cooking zone with its own sink and ventilation suits heavy wok cooking but adds cost.
Moving pointsReusing the existing sink, hob and gas positions avoids new plumbing and wiring runs.
AppliancesBuilt-in ovens, hoods and hobs add up quickly; reuse what still works.

Indicative estimate only, not a quotation — final pricing after we see photos or the site.

Get a quote for your job

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesSSM-registeredExperienced KL & Selangor contractor

Common Questions

How much does a kitchen renovation cost in Malaysia?
Indicative 2026 Klang Valley ranges are RM8,000–RM15,000 for a basic refresh, RM12,000–RM20,000 to RM35,000–RM70,000+ for a mid-range kitchen depending on size, and RM45,000–RM80,000+ for a premium kitchen with custom cabinetry and built-in appliances.
How much does a wet and dry kitchen add?
In the Klang Valley a wet & dry split typically adds RM5,000–RM12,000 to the project compared with a single open kitchen, because it needs a partition plus a second set of plumbing and ventilation.
How much does it cost to move the sink or hob?
Relocating the sink or hob can add RM3,000–RM8,000 once the plumbing and wiring are included. Keeping them where they are is one of the easiest ways to protect the budget.
What is the biggest cost in a kitchen renovation?
Usually the cabinets, followed by the worktop. Choosing moisture-resistant material for the wet kitchen matters more than the finish on the doors.
Does ClickBina do kitchen renovation?
As part of a whole-house refurbishment we coordinate every trade, kitchens included. For a kitchen-only job, WhatsApp us your job details for a quote — we reply within the hour. A site visit is free.
Is this kitchen calculator a quotation?
No. It gives a planning range from published Klang Valley figures. The final price depends on the cabinet material, worktop, appliances and what the existing kitchen needs.

Want a proper quote?

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

WhatsApp ClickBina← All Tools
💬 WhatsApp for a quote