Electrical Works Cost Calculator Malaysia (Free, 2026)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
⚡ Free Calculator

Electrical Works
Cost Calculator

Estimate the cost of home electrical work in seconds — count the sockets and lighting points you need, pick a DB box upgrade if you want one, or switch to full rewiring by home size. Indicative 2026 Klang Valley ranges, shown as a range.

📍 We serve KL, Selangor & Putrajaya.

Electrician fitting a new power socket into a chased wall groove

Electrical works estimator

Enter the number of points for each type; leave 0 for any you do not need.

High-load appliances need their own cable and breaker from the board, not a spur off an existing socket.

Full-rewire ranges are by home size; the number of points and circuits decides where you land.

How this estimate works

Small electrical jobs are priced per point, so the calculator multiplies the number of each item by its 2026 Klang Valley range: a socket on surface trunking near the DB RM120–RM250, a concealed (chased-in) socket RM200–RM400, a socket on a long run far from the board RM350–RM600, a USB or USB-C combo socket RM150–RM350 and a weatherproof outdoor point RM250–RM500. A dedicated appliance circuit — a new breaker and its own cable for an aircon, heater or oven — starts from RM400, so the estimate keeps a plus sign rather than inventing a ceiling.

Lighting is counted the same way: a recessed LED downlight is RM60–RM150 per point supplied and installed, and a new wiring point or lighting circuit RM120–RM250 per point. DB box work is a single line: adding or replacing one RCCB, MCB or RCBO is RM250–RM600, a standard single-phase consumer unit upgrade RM1,500–RM3,500, a split-load dual-RCCB board RM2,000–RM4,000 and a three-phase board RM3,500–RM8,000+. Tick fault-finding (RM150–RM400) if a circuit keeps tripping and nobody has found out why yet.

Switch to full rewiring and the calculator uses the whole-house ranges instead: RM4,000–RM8,000 for a studio or small apartment, RM6,000–RM12,000 for a 2–3 bedroom condo, RM8,000–RM15,000 for a single-storey terrace, RM12,000–RM20,000 for a double-storey terrace and RM15,000–RM30,000+ for a semi-D or bungalow. The rates come from our sockets, DB box, rewiring, lighting and electrician guides. For a firm number, WhatsApp ClickBina your job details for the board and the walls — the quote on WhatsApp is free, and a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.

What moves the price

FactorHow it changes your quote
Surface or concealedTrunking on the wall surface is fastest and needs no patching; chasing the cable into the wall looks neater but adds cutting and making good.
Distance from the boardEvery extra metre of cable and chasing adds cost, which is why a point far from the DB sits in a higher band.
Doing several points at onceMost electricians have a minimum call-out charge, so several points on one visit are far better value than one socket at a time.
High-load appliancesAircon, water heaters and ovens need a dedicated circuit with their own breaker — a spur off an existing socket is how circuits overheat.
Board conditionAn old board without an RCCB for earth-leakage protection is often upgraded at the same time as new circuits are added.
Full rewire vs partialFrequent tripping, old cabling or a major renovation can make a full rewire better value than patching one circuit at a time.

Indicative estimate only — final pricing after a photo assessment or site visit.

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How much does it cost to add a power point in Malaysia?
Indicative 2026 Klang Valley ranges are RM120–RM250 for a socket on surface trunking near the board, RM200–RM400 for a concealed chased-in socket and RM350–RM600 for a long run far from the board. USB combo sockets are RM150–RM350 and weatherproof outdoor points RM250–RM500.
How much is a DB box upgrade?
A standard single-phase consumer unit upgrade is RM1,500–RM3,500; a split-load dual-RCCB board is RM2,000–RM4,000 and a three-phase board RM3,500–RM8,000+. If the board itself is sound, adding or replacing a single RCCB, MCB or RCBO is RM250–RM600.
How much does it cost to rewire a house?
By home size: RM4,000–RM8,000 for a studio or small apartment, RM6,000–RM12,000 for a 2–3 bedroom condo, RM8,000–RM15,000 for a single-storey terrace, RM12,000–RM20,000 for a double-storey terrace and RM15,000–RM30,000+ for a semi-D or bungalow.
Why does an aircon or water heater need a dedicated circuit?
High-load appliances draw too much current to share a socket circuit safely. A dedicated circuit gives them their own cable and breaker from the board, and starts from RM400 depending on the appliance and the distance.
How much do downlights cost to install?
A recessed LED downlight is about RM60–RM150 per point supplied and installed. If the ceiling is not pre-wired, a new wiring point or lighting circuit adds RM120–RM250 per point.
How accurate is this electrical cost calculator?
It gives a planning range from published 2026 Klang Valley market rates, not a quotation. WhatsApp ClickBina photos for a free quote; a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.