TV Feature Wall Cost Calculator Malaysia (2026)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📺 Free Calculator

TV Feature Wall
Cost Calculator

Estimate a TV feature wall budget — choose the design, then add storage, framing, lighting or a motorised lift. Indicative 2026 Klang Valley ranges from our TV feature wall cost guide, shown as a range.

📍 We serve KL, Selangor & Putrajaya.

Carpenter building a laminated TV feature wall with base cabinets in a condo living room

TV feature wall estimator

The built-in cabinet wall already includes shelves, lower cabinets, the TV recess and its framing.

A full-height unit is a floor-to-ceiling carpentry job about 3–4 m wide.

How this estimate works

A TV feature wall is priced as a design, so the calculator starts from the range for the one you pick: a plywood panel with a painted accent is RM2,500–RM5,000, a wallpaper feature wall RM600–RM2,500 for the wallpaper alone, a laminate or HPL panel wall RM4,000–RM9,000, a PU 3D panel wall RM3,500–RM8,000, a false wall with built-in cabinets RM8,000–RM16,000, and a stone or porcelain cladding wall RM10,000–RM25,000+.

Storage is the biggest swing. Open display shelves add RM1,500–RM4,000, base cabinets under the TV add RM2,000–RM6,000 for a 2–3 m run, and a full-height built-in unit is RM8,000–RM18,000. A plywood false wall to recess the TV and hide the cables adds RM1,000–RM4,000; lighting and concealed power points add RM500–RM3,000; a motorised lift that hides the TV adds RM3,000–RM8,000. The built-in cabinet design already includes its own storage and framing, so those lines are not added twice.

The ranges come from our TV feature wall cost guide. Most walls combine a panel finish with some storage and lighting, and that combination is where quotes differ. We supply and install wall panels and recommend a finish by budget and use case; WhatsApp ClickBina a photo of the wall and its width for a flat price with no hidden charges. A site visit is free.

The formula

Estimate = design range + storage range (not for the built-in cabinet design) + RM1,000–RM4,000 (framing, not for the built-in cabinet design) + RM500–RM3,000 (lighting and power points) + RM3,000–RM8,000 (motorised lift). Low and high ends are added separately.

What moves the price

FactorHow it changes your quote
CladdingPaint and laminate are the budget end; porcelain, stone and timber veneer can double or triple the panel cost.
StorageCabinets are usually the biggest single line once the wall includes closed storage.
FramingA false wall is needed for a flush TV and hidden cables; it adds carpentry before any finish goes on.
Lighting and powerCove strips, downlights and concealed TV points add wiring work.
Wall widthA wider wall needs more panel, longer cabinets and more lighting.
Concealed extrasMotorised lifts and full AV conduit are premium items; decide early so the framing allows for them.

Indicative estimate only, not a quotation — final pricing after we see photos or the site.

Get a quote for your job

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesSSM-registeredExperienced KL & Selangor contractor

Common Questions

How much does a TV feature wall cost in Malaysia?
Indicative Klang Valley ranges are RM2,500–RM5,000 for a painted plywood panel, RM4,000–RM9,000 for a laminate or HPL wall, RM3,500–RM8,000 for a PU 3D panel wall, RM8,000–RM16,000 for a false wall with built-in cabinets and RM10,000–RM25,000+ for stone or porcelain cladding.
How much do cabinets add to a TV wall?
Open shelves add RM1,500–RM4,000, base cabinets under the TV add RM2,000–RM6,000 for a 2–3 m run, and a full-height built-in unit is RM8,000–RM18,000.
Do I need a false wall for a TV feature wall?
Only for a flush-mounted TV, a recess or fully hidden cables. The plywood framing adds RM1,000–RM4,000.
Is a wallpaper TV wall cheaper?
Yes — a wallpaper feature wall is RM600–RM2,500, but that covers the wallpaper only, with no storage, framing or lighting.
Does ClickBina build TV feature walls?
We supply and install wall panels and recommend a finish by budget and use case. WhatsApp us your job details, including the wall width; we reply within the hour. A site visit is free.
Is this TV wall calculator a quotation?
No. It is a planning range from published Klang Valley figures, not a quotation. The final price depends on the wall width, materials and how much is concealed.

Want a proper quote?

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

WhatsApp ClickBina← All Tools
💬 WhatsApp for a quote