Grille & Fence Cost
Calculator

Estimate the cost of window grilles, door security grilles, railings or boundary fencing — choose the job, the material and the size. Indicative 2026 Klang Valley ranges. Invisible grille has no published rate, so it goes straight to a quote.

📍 We serve KL, Selangor & Putrajaya.

Welder fitting a new mild steel window grille to a terrace house

Grille & fence cost estimator

A 3 ft × 4 ft bedroom window is 12 sq ft; a full-height door grille is about 21 sq ft.

Rooms without a second exit should have an openable panel for fire escape.

Measure each boundary you want fenced and add them up.

How this estimate works

Metal grilles are priced per square foot (railings per linear foot), and the rate depends on where the grille goes and what it is made of. A standard window grille runs RM80–RM130 per sq ft in powder-coated mild steel, RM130–RM200 in aluminium and RM180–RM280 in stainless steel; sliding grilles, main-door security gates and balcony or staircase railings each have their own row in the calculator. Openable panels with a lock add RM200–RM600 per unit for the mechanism.

Fencing is priced per linear metre: galvanised BRC wire mesh at RM80–RM150, mild steel grille at RM150–RM350, aluminium pressed-panel at RM200–RM400, timber slats at RM200–RM450, composite (WPC) at RM300–RM600, brick or RC pillar with grille infill at RM350–RM700 and glass panels at RM500–RM1,200. If an old fence has to come down first, demolition and debris removal adds RM15–RM40 per metre.

Grille rates come from our metal grille cost guide and fence rates from our fencing cost guide. Invisible grille is different: it is quoted per opening after checking what each cable can be anchored into, so the calculator does not show a number for it. ClickBina’s crew installs grilles, invisible grilles and fencing: WhatsApp your job details for the windows or boundary for a free quote, and if a site visit is needed it is free.

What moves the price

FactorHow it changes your quote
MaterialMild steel is the cheapest but needs a good powder coat to resist rust; aluminium and stainless steel cost more and do not rust.
LocationDoor security gates carry higher rates than window grilles because they are heavier and need locks and hinges.
Openable panelsEach openable panel with a lock adds a mechanism charge; rooms without a second exit should have one.
Fence height and typeTaller fences and brick-pillar combinations cost more per metre; some heights need council approval.
Old fence removalDemolishing and carting away an old fence is charged per metre on top of the new fence.
Invisible grillePriced per opening after checking the fixing surface, not per sq ft.

Indicative estimate only — final pricing after a photo assessment or site visit.

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How much does a window grille cost per sq ft in Malaysia?
Indicative 2026 Klang Valley rates for a standard window grille are RM80–RM130 per sq ft in mild steel, RM130–RM200 in aluminium and RM180–RM280 in stainless steel.
How much is a main door security grille?
A main door or security gate grille runs RM120–RM180 per sq ft in mild steel, RM180–RM280 in aluminium and RM250–RM380 in stainless steel. A full-height door is roughly 21 sq ft.
How much does fencing cost per metre?
Per linear metre, supply and install: RM80–RM150 for BRC wire mesh, RM150–RM350 for mild steel grille, RM200–RM400 for aluminium pressed-panel and RM350–RM700 for brick pillar with grille infill.
Why does the calculator not price invisible grille?
Because there is no published per-sq-ft rate we can stand behind: invisible grille is quoted per opening after checking what the cables can be fixed into. WhatsApp your job details for the openings for a free quote.
Do I need an openable grille?
For rooms without a second way out, an openable panel with a lock is the safe choice for fire escape. Each one adds RM200–RM600 for the mechanism.
How accurate is this grille and fence calculator?
It gives a planning range from published 2026 Klang Valley rates. WhatsApp ClickBina photos and sizes for a free quote; a site visit is free.