Estimate a deep cleaning or post-renovation cleaning price in Malaysia in seconds — choose deep cleaning, move-in / move-out or post-renovation cleaning, pick your home size and add extras. Indicative 2026 Klang Valley ranges, shown as a range.
📍 We serve KL, Selangor & Putrajaya.

Post-renovation cleaning removes cement dust, paint splatter and protective film; it uses different equipment and costs more.
Leave at 0 for a normal layout; each additional bathroom is priced on its own.
House cleaning in the Klang Valley is quoted per job, by home size, and the type of clean sets the band. A deep clean of a lived-in home runs RM250–RM400 for a studio or 1-bedroom, RM350–RM550 for a 2-bedroom condo, RM400–RM650 for a 3-bedroom condo, RM600–RM900 for a terrace house and RM900–RM900+ for a semi-D or bungalow. A move-in or move-out clean of an empty unit uses almost the same bands — RM250–RM400 for a studio up to RM600–RM900+ for a terrace house — because the work is the same deep clean without furniture in the way.
Post-renovation cleaning is a different product. Construction dust, cement haze, paint splatter and protective film need industrial fine-dust vacuums, scrapers and repeated top-down passes, so it is priced higher: RM500–RM800 for a studio, RM650–RM1,000 for a 2-bedroom condo, RM800–RM1,300 for a 3-bedroom condo, RM1,000–RM1,800 for a terrace house and RM1,800–RM3,000+ for a semi-D or bungalow, where a site visit is usually needed first.
On top of the base band, each additional bathroom adds RM50–RM100, an aircon cover-and-filter clean adds RM40–RM80 per unit and an oven deep clean adds RM80–RM150. The figures come from our move-in / move-out, deep cleaning and post-renovation cleaning cost guides. ClickBina does all three kinds of clean across KL and Selangor: WhatsApp us your unit details for a free quote at a flat price, no hidden charges. If the photos do not show enough, a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
The two numbers people most often want side by side: what a regular deep clean costs, and what the post-renovation cleaning price is for the same home. Indicative 2026 Klang Valley ranges, per job:
| Home | Deep cleaning price | Post-renovation cleaning price |
|---|---|---|
| Studio or 1-bedroom | RM250–RM400 | RM500–RM800 |
| 2-bedroom condo | RM350–RM550 | RM650–RM1,000 |
| 3-bedroom condo | RM400–RM650 | RM800–RM1,300 |
| Terrace house | RM600–RM900 | RM1,000–RM1,800 |
| Semi-D or bungalow | From RM900 | RM1,800–RM3,000+ (site visit usually needed) |
A full house deep clean is priced per job by home size rather than by the hour, and each additional bathroom adds RM50–RM100. The post-renovation clean costs more because construction dust keeps settling, so the crew works top-down in repeated passes with fine-dust vacuums and scrapers. WhatsApp us your job details for a quote.
| Factor | How it changes your quote |
|---|---|
| Type of clean | A post-renovation clean costs roughly one and a half to two times a regular deep clean because of the dust load, the equipment and the repeated passes. |
| Home size | Floor area and room count set the crew size and the hours, which is why each band steps up with the size of the home. |
| Bathrooms | Bathrooms take the longest per square foot — descaling, grout mould and fittings — so each extra one is priced on its own. |
| Condition | Heavy grease, mould, pet hair or a furnished unit move a job to the top of its band; a lightly lived-in home lands near the bottom. |
| Access | High ceilings, a double-storey void or a unit with no lift add time. Mention them when you send your job details. |
| Add-ons | Aircon filters, oven and fridge interiors are the items most often left out of a first quote — tick the ones you want so they are counted. |
Indicative estimate only — final pricing after a photo assessment or site visit.
WhatsApp us your job details for a free quote.
💬 Get a Free QuoteWhatsApp us your job details and measurements — the quote is free.