Plaster Ceiling Price Calculator Malaysia 2026: Per Sq Ft
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏠 Free Calculator

Plaster Ceiling Price
Calculator (per sq ft)

Plaster ceiling price in Malaysia runs from RM8–RM12 per sq ft for a flat gypsum ceiling up to RM35–RM50 per sq ft for a multi-tier feature ceiling (indicative 2026, Klang Valley). Choose the ceiling design, enter the room area in sq ft, then add cornice, a cove light trough, downlight openings or removal of an old ceiling.

📍 We serve KL, Selangor & Putrajaya.

Installer fixing gypsum board to a metal ceiling grid, seen from below

Plaster ceiling price estimator

Room length × width in feet. A 15 ft × 12 ft living room is 180 sq ft.

Perimeter of the room: 2 × (length + width).

A full-perimeter cove uses roughly the room perimeter in LED strip.

Plaster ceiling price per sq ft (2026)

Ceiling designPrice per sq ft15 ft × 12 ft hall (180 sq ft)
Flat gypsum board (single tier)RM8–RM12RM1,440–RM2,160
Flat cement / calcium silicate board (wet areas)RM8–RM12RM1,440–RM2,160
Simple drop / cove (light trough)RM15–RM22RM2,700–RM3,960
Coffered or two-tier designRM22–RM35RM3,960–RM6,300
Multi-tier / feature cofferRM35–RM50RM6,300–RM9,000

The hall column is the ceiling only — area × rate. Cornice, LED strip, downlight cuts, painting and wiring are extra; add them in the calculator above.

Light trough ceiling price for a hall

A light trough is the L-box or cove that hides an LED strip along the edge of the ceiling. It is priced as a simple drop / cove ceiling at RM15–RM22 per sq ft, and the LED strip is a separate line at RM8–RM20 per linear ft (supply and install).

Worked example for a 15 ft × 12 ft hall with a light trough all round: the ceiling is 180 sq ft × RM15–RM22 = RM2,700–RM3,960, and the LED strip is 54 linear ft (2 × (15 + 12)) × RM8–RM20 = RM432–RM1,080. That is about RM3,132–RM5,040 before downlight cuts, LED drivers, the electrician’s wiring and painting. Select “Simple drop / cove” in the calculator, enter 180 sq ft and 54 ft of LED strip to see the same range.

How this estimate works

A plaster ceiling is priced per square foot of ceiling area, and the design sets the rate: flat gypsum board at RM8–RM12 per sq ft, flat cement or calcium silicate board (for bathrooms, wet kitchens and ceilings under a bathroom) at RM8–RM12, a simple drop or cove at RM15–RM22, a coffered or two-tier design at RM22–RM35 and a multi-tier feature coffer at RM35–RM50. The calculator multiplies the rate by your area.

Extras are added only if you enter them: cornice or coving strip at RM12–RM25 per linear ft, downlight and fan openings at RM15–RM30 per cut, cove LED strip at RM8–RM20 per linear ft (supply and install), and hacking and disposal of an old ceiling at RM2–RM5 per sq ft. Painting, LED drivers and the electrician’s wiring are not included — they are usually separate lines.

The rates come from the 2026 price tables in our plaster ceiling price guide. The biggest swing between quotes is usually how the L-box and cove are priced (inside the ceiling rate or as a separate line), so ask for it in writing to avoid paying twice. For a firm price, WhatsApp ClickBina your job details and room measurements — the quote on WhatsApp is free, and a site visit is free.

What moves the price

FactorHow it changes your quote
DesignFlat ceilings are the cheapest; every extra tier adds framing and skim-coat labour.
Board typeCement or calcium silicate board resists moisture and belongs in wet areas, at a higher rate than gypsum.
Existing ceilingAn old plaster or asbestos ceiling has to be hacked and disposed of first, charged per sq ft.
OpeningsEvery downlight or fan cut-out is extra labour, so a ceiling full of downlights costs more than a plain one.
LightingCove LED strip is priced per linear ft; drivers and the electrician’s circuits come on top.
PaintingMost ceiling rates exclude the final paint coat — check before you compare quotes.

Indicative estimate only — final pricing after a photo assessment or site visit. Page updated 8 Oct 2026.

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What is the plaster ceiling price per sq ft in Malaysia?
Indicative 2026 Klang Valley rates are RM8–RM12 per sq ft for a flat gypsum ceiling, RM8–RM12 for cement or calcium silicate board, RM15–RM22 for a simple drop or cove, RM22–RM35 for coffered or two-tier designs and RM35–RM50 for multi-tier feature ceilings.
How much is a plaster ceiling for a hall?
For a 15 ft × 12 ft hall (180 sq ft), the ceiling alone is about RM1,440–RM2,160 flat in gypsum, RM2,700–RM3,960 with a simple drop or cove, and RM3,960–RM6,300 for a coffered or two-tier design. Cornice, LED strip, downlight cuts, painting and wiring are extra.
How much does a light trough cost?
A light trough (cove or L-box) is priced at the simple drop / cove rate of RM15–RM22 per sq ft, plus the LED strip at RM8–RM20 per linear ft. For a 180 sq ft hall with a light trough all round, that is about RM3,132–RM5,040 before drivers, wiring and painting.
How much does cornice cost?
Cornice or coving strip runs RM12–RM25 per linear ft. Measure the room perimeter — two times length plus width — to get the linear feet.
Is LED cove lighting included in the ceiling price?
No. The L-box and board are in the cove rate, but the LED strip is extra at RM8–RM20 per linear ft, plus a driver per zone and the electrician’s wiring.
Which board should I use in a bathroom or kitchen?
Use cement or calcium silicate board, not gypsum, for bathrooms, wet kitchens and any ceiling directly under a bathroom. It resists moisture and will not sag; it costs RM8–RM12 per sq ft for a flat ceiling.
Does it cost more to replace an old ceiling?
Yes. Hacking and disposing of an old plaster or asbestos ceiling adds RM2–RM5 per sq ft before the new ceiling goes up. Tick the removal option to include it.
How accurate is this ceiling calculator?
It gives a planning range from published 2026 Klang Valley rates, excluding painting and wiring. WhatsApp ClickBina photos and room sizes for a free quote; a site visit is free.

Need a Real Quote?

WhatsApp us your job details and measurements — free quote, we reply within the hour.

WhatsApp ClickBina← All Tools
💬 Get Your Free Quote