Home Maintenance Budget Calculator Malaysia
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🔧 Free Calculator

Home Maintenance
Budget Calculator

Work out how much to set aside each year to keep a home in good order. Pick one method — by property type, by the 1% rule or from your aircon units and water tank — using the figures in our annual home maintenance budget guide.

📍 We serve KL, Selangor & Putrajaya.

Technician servicing a wall-mounted aircon unit as part of routine home maintenance

Home maintenance budget calculator

Each method is a separate way to plan; they are not added together, because the property-type bands already cover aircon and routine jobs.

The per-unit figure covers two services and one chemical wash a year.

How this estimate works

There is no single right figure for home maintenance, so the calculator offers three ways to plan, one at a time. By property type, our guide suggests about RM1,500–RM4,000 a year for a condo or apartment and RM2,500–RM6,000 for a landed terrace house; a semi-D or bungalow is RM4,000–RM12,000. Those bands already cover aircon, minor plumbing and other routine jobs.

The second method is the rule of thumb in the guide: set aside 1% of the property value each year. Enter the value and the calculator works it out. The third method builds the routine items you know you have: aircon at RM200–RM400 per unit a year for two services and one chemical wash, plus RM150–RM400 to clean a rooftop water tank on a landed home. The methods are never added together, because the property-type bands already include these items.

The figures come from our annual home maintenance budget guide. Longer-cycle jobs such as an exterior repaint are better saved for separately, the way a condo keeps a sinking fund. When something needs doing, WhatsApp us your job details for a quote — we'll reply as soon as we can.

The formula

By property type: the yearly band for the type. By the 1% rule: property value × 1%. From items: number of aircon units × RM200–RM400 + RM150–RM400 for a rooftop tank clean. One method at a time; they are never added together.

What moves the price

FactorHow it changes your quote
Property typeLanded homes have roofs, gutters and external walls that a condo’s management looks after.
Age of the homeOlder homes need more repairs to pipes, wiring and roofs.
Aircon unitsAircon is charged per unit, so it is often the biggest routine line.
Water tankLanded homes with a rooftop tank need it cleaned every so often.
Garden and outdoor areasLandscaping, gutters and drains add to a landed home’s yearly costs.
Long-cycle jobsRepainting and roof work come round every few years; save for them separately.

Indicative estimate only, not a quotation — final pricing after we see the job details or the site.

Get a quote for your job

WhatsApp us your job details for a quote — we'll reply as soon as we can.

💬 WhatsApp for a quote
Reply on WhatsApp

Common Questions

How much should I set aside for home maintenance each year?
Our guide suggests about RM1,500–RM4,000 a year for a Klang Valley condo or apartment, RM2,500–RM6,000 for a landed terrace house and RM4,000–RM12,000 for a semi-D or bungalow. A simple rule of thumb is 1% of the property value per year.
How much does aircon maintenance cost a year?
A whole-year planning figure is RM200–RM400 per unit, covering two services and one chemical wash.
How much is a water tank clean?
Cleaning a rooftop water tank on a landed home is RM150–RM400.
Is the 1% rule accurate?
It is a quick planning rule, not a forecast. A new condo may spend less; an older landed home with a garden may spend more.
How do I get a quote for maintenance work?
WhatsApp us your job details for a quote: what needs doing, the property type and the area. We'll reply as soon as we can.
Is this maintenance budget a quotation?
No. It is a planning figure from our published guide, not a quotation. Actual costs depend on the home, the appliances and what needs fixing.

Want a proper quote?

WhatsApp us your job details for a quote — what needs doing and where. We'll reply as soon as we can.

WhatsApp ClickBina← All Tools
💬 WhatsApp for a quote