Estimate a staircase renovation by scope — from cladding the old treads to a new floating stair — and add a glass balustrade where it is not already part of the job. Indicative 2026 Klang Valley ranges from our staircase renovation cost guide.
📍 We serve KL, Selangor & Putrajaya.

Offered for the cosmetic and moderate scopes. A full replacement includes a new balustrade and the bespoke stair includes glass already.
Staircase work is priced by scope, so the calculator starts from the range for the one you pick. A cosmetic refresh — cladding the treads with tiles, vinyl or a timber overlay, repainting the railings and replacing balustrade spindles — is RM5,000–RM12,000. A moderate renovation with new treads and risers, a new handrail and new balusters is RM12,000–RM22,000. A full replacement that demolishes and rebuilds the stair is RM20,000–RM40,000, and a bespoke open-riser or floating staircase is RM35,000–RM70,000+.
A structural glass balustrade is the one upgrade that changes the budget most. On an existing stair it adds RM8,000–RM18,000, which can be more than the rest of a cosmetic job. The calculator offers it only with the cosmetic and moderate scopes, because a full replacement already includes a new balustrade and the bespoke stair already has glass, so it is never counted twice.
The ranges come from our staircase renovation cost guide. Anything that changes the structure — a new stair, an open riser or a cantilever — needs an engineer’s design and, in a strata home, management approval. When the range suits you, WhatsApp ClickBina the scope and the number of steps for a flat price with no hidden charges — we'll reply as soon as we can. A site visit is free.
Estimate = range for the scope + RM8,000–RM18,000 for a glass balustrade upgrade (cosmetic and moderate scopes only). Low and high ends are added separately; a “+” means the top end is open.
| Factor | How it changes your quote |
|---|---|
| Scope | Cladding the existing treads is far cheaper than rebuilding the stair. |
| Tread material | Tile and vinyl overlays are the budget end; solid timber treads cost more and need care. |
| Balustrade | Glass costs much more per metre than powder-coated steel. |
| Stair shape | Straight flights are the simplest; L-shaped, U-shaped and spiral stairs take more work. |
| Structure | Floating and cantilevered stairs need a structural design and specialist fabrication. |
| Number of steps | A longer flight means more treads, risers and balustrade to supply and fix. |
Indicative estimate only, not a quotation — final pricing after we see the job details or the site.
WhatsApp us the job and rough measurements — we'll reply as soon as we can. Our prices are flat, with no hidden charges. A site visit is free.
💬 WhatsApp for a quoteWhatsApp us what you are planning and rough measurements — we'll reply as soon as we can. A site visit is free.