Wall Panel Cost Calculator Malaysia (2026)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🧱 Free Calculator

Wall Panel & Feature Wall
Cost Calculator

Estimate a wall panel or feature wall budget — pick the panel or finish, enter the wall area, and add framing or lighting if the design needs it. Indicative 2026 market ranges from our wall panel and feature wall guides, shown as a range.

📍 We serve KL, Selangor & Putrajaya.

Installer fixing fluted wall panels onto timber battens in a living room

Wall panel cost estimator

WPC, PS, PVC/SPC, UV marble sheet and acoustic panels have no published rate on our guides — we quote those after you tell us the room, wall size and budget.

Width × height in feet. A 10 ft by 10 ft living room wall is 100 sq ft.

How this estimate works

Wall panels are sold in two ways: some finishes are published per 100 sq ft of finished wall, others per sq ft installed. The calculator keeps each figure in the unit our guides publish it in. Factory-made fluted MDF is RM2,000–RM3,500 per 100 sq ft wall, a site-built rubberwood or meranti slat wall is RM3,000–RM5,000, and solid teak or premium timber slat is RM4,500–RM6,000+. Per sq ft installed, laminate or HPL on plywood is RM30–RM60, PU 3D panels are RM20–RM50, timber veneer is RM50–RM120, porcelain tile cladding is RM40–RM100 and marble or natural stone is RM80–RM200+. Wallpaper at RM5–RM15 is listed only so you can compare.

Two extras are added when the design needs them. A plywood false wall that builds the surface out to hide conduit or create a recess adds RM1,000–RM4,000. Lighting — cove strips, recessed downlights — and concealed power points add RM500–RM3,000 depending on how much is involved. For WPC, PS, PVC or SPC panels, UV marble sheet and acoustic panels our guides publish no rate, so the calculator does not invent one: it hands you straight to WhatsApp.

These are market ranges collected in our guides, not ClickBina’s own panel price list. We supply and install wall panels and recommend one by budget and use case — a rental needs something different from a bedroom headboard or a humid corridor. WhatsApp us the room, the wall size and your budget for a recommendation and a flat price with no hidden charges; a site visit is free.

The formula

Fluted MDF and timber slat: estimate = (wall area ÷ 100) × the range per 100 sq ft wall. Laminate, PU 3D, veneer, porcelain, marble and wallpaper: estimate = wall area × the range per sq ft installed. Then + RM1,000–RM4,000 for a plywood build-out and + RM500–RM3,000 for lighting and concealed power points. Low and high ends are added separately.

What moves the price

FactorHow it changes your quote
Panel materialThe core decides the behaviour: MDF must stay dry, timber needs finishing, WPC and PVC tolerate humidity better.
Wall conditionPanels need a flat, dry, sound wall. A damp or hollow wall must be fixed first, or the panel hides the problem.
Fixing methodAdhesive straight to a flat wall is fastest; battens and clips suit uneven walls and let services run behind.
Trims and cut-outsEnd trims, corners and cut-outs for switches and sockets are where cheap jobs look cheap.
FramingA false wall for a flush TV or hidden cables adds carpentry before any panel goes up.
RoomBathrooms, wet kitchens and exterior walls need a different panel family from a dry, air-conditioned bedroom.

Indicative estimate only, not a quotation — final pricing after we see photos or the site.

Get a quote for your job

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesSSM-registeredExperienced KL & Selangor contractor

Common Questions

How much do wall panels cost in Malaysia?
Indicative market ranges from our guides are RM2,000–RM3,500 per 100 sq ft wall for fluted MDF, RM3,000–RM5,000 for a site-built timber slat wall, RM30–RM60 per sq ft for laminate or HPL on plywood, RM20–RM50 per sq ft for PU 3D panels and RM80–RM200+ per sq ft for marble or natural stone.
Why are some panels priced per 100 sq ft and others per sq ft?
Our fluted panel guide publishes finished-wall figures per 100 sq ft; the TV feature wall guide publishes installed rates per sq ft. The calculator keeps each in its own unit so nothing is converted by guesswork.
How much is a WPC or PVC wall panel?
Our guides do not publish a rate for WPC, PS, PVC or SPC panels, UV marble sheet or acoustic panels, because the price depends on the core, thickness, trims and the state of the wall. Tell us the room, wall size and budget on WhatsApp for a quote.
Do I need a false wall behind the panels?
Only if you want to hide conduit, recess a TV or level a very uneven wall. A plywood build-out adds about RM1,000–RM4,000.
Does ClickBina supply and install wall panels?
Yes. We supply and install wall panels and recommend the type by budget and use case. WhatsApp us the room, wall size and budget — we reply within the hour. A site visit is free.
Is the result a quotation?
No. It is a planning range from market figures published on our guides, not a quotation and not ClickBina’s own price list.

Want a proper quote?

WhatsApp us your job details and rough measurements — we reply within the hour. A site visit is free.

WhatsApp ClickBina← All Tools
💬 WhatsApp for a quote