Wall & Floor Tile Hacking Cost Calculator (Free)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🔨 Free Calculator

Hacking Cost
Calculator

Estimate the cost of hacking a wall or breaking out old floor tiles — choose the job, enter the area, and add making good, re-tiling or levelling. Indicative 2026 Klang Valley ranges, with a warning where a wall may be structural.

📍 We serve KL, Selangor & Putrajaya.

Worker hacking a brick partition wall with a demolition hammer

Hacking cost estimator

Structural walls are never priced per sq ft — they need an engineer and a beam.

Wall: length × height of the part removed. Floor: length × width of the room.

How this estimate works

Wall hacking is priced per square foot of wall face removed, with debris disposal included: a non-structural brick partition at RM10–RM25 per sq ft and a drywall partition at RM5–RM12. Each opening then needs making good — patching, plastering, skim and paint where the old wall met the floor, ceiling and side walls — at RM800–RM2,500 per opening. The calculator adds both.

Floor tile hacking is a separate job: breaking out the old tiles and disposing of the debris costs RM1.50–RM3 per sq ft. Tick re-tiling to add supply-and-lay of new tiles at RM12–RM30 per sq ft, and levelling to add RM2–RM6 per sq ft for levelling compound — the calculator applies levelling to the whole area, so treat it as the upper bound; in practice it is only needed where the slab is uneven.

A load-bearing or structural wall is never priced per sq ft. An opening in one needs PE-stamped drawings and a beam, which moves the job into the RM15,000–RM40,000 bracket, and it must not be hacked until the building plans or a Professional Engineer confirm it. Rates come from our wall-hacking and floor-tile replacement guides. ClickBina’s crew does wall hacking and floor hack-and-re-tile in KL and Selangor: WhatsApp your job details and your floor plan for a free quote, and if we need to see it first a site visit is free.

What moves the price

FactorHow it changes your quote
Wall typeDrywall is quicker and cheaper to remove than brick; a structural wall is a different job altogether.
Making goodEvery opening leaves raw edges on the floor, ceiling and side walls that need patching, plaster and paint.
Debris disposalHacking produces a lot of rubble; the rates here include disposal, but check that any quote does too.
Floor conditionAfter tiles come up the slab is rarely flat; levelling is a contingency that should be quoted with a unit rate.
ApprovalsCondos need management approval; structural changes need a Professional Engineer and council approval.
Hidden servicesPipes and wiring inside a wall must be rerouted before it comes down — ask for that as its own line.

Indicative estimate only — final pricing after a photo assessment or site visit.

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How much does wall hacking cost per sq ft in Malaysia?
Indicative 2026 Klang Valley rates are RM10–RM25 per sq ft for a non-structural brick partition and RM5–RM12 for a drywall partition, both including debris disposal, plus RM800–RM2,500 per opening to make good.
How much does it cost to hack floor tiles?
Hacking out an old tiled floor, including disposal, runs RM1.50–RM3 per sq ft. New tiles cost RM12–RM30 per sq ft to supply and lay on top of that.
Can I hack any wall in my house?
No. Non-structural partitions can be removed, but never structural columns, beams or load-bearing walls without a Professional Engineer. Condo units also need management approval before any hacking.
What does it cost to open up a load-bearing wall?
An opening in a load-bearing wall needs PE-stamped drawings and a beam, which moves the job into the RM15,000–RM40,000 bracket instead of a per-sq-ft price. It must not start until the building plans or a PE confirm it.
Why is making good charged separately?
Because the patching, plastering, skim coat and paint around each opening is a job of its own. It costs RM800–RM2,500 per opening depending on size and finish.
How accurate is this hacking calculator?
It gives a planning range from published 2026 Klang Valley rates. WhatsApp ClickBina a photo and floor plan for a free quote; if a site visit is needed it is free.