Estimate your window tinting for home price in Malaysia — choose the film type, enter the total glass area in sq ft, and add removal of old film if needed. Indicative 2026 Klang Valley ranges, supply and install.
📍 We serve KL, Selangor & Putrajaya.

Add up every panel: width × height in feet. A bedroom sliding window is often 10–16 sq ft; a living-room sliding door 18–30 sq ft.
Home window film is priced per square foot of glass, and the film category sets the rate: economy solar film at RM3–RM6 per sq ft, mid-range solar or nano-ceramic at RM6–RM12, premium ceramic or carbon film at RM10–RM18, safety or security film at RM8–RM20 and decorative or frosted film at RM4–RM10. The calculator multiplies your total glass area by that range.
If the windows already have old, bubbling or faded film, it has to come off before new film goes on. Tick removal to add RM1.50–RM3 per sq ft for stripping and residue cleaning across the same area.
The figures come from the price table in our window tint cost guide. Heat rejection, clarity and privacy differ a lot between films in the same category, so ask for the brand and the product name in writing. ClickBina’s crew does home window tinting in the Klang Valley: WhatsApp your job details with rough window sizes for a free quote, and if a site visit is needed it is free.
House window tint prices are quoted per square foot of glass, whether it is a bedroom window, a sliding door or a whole house. Indicative 2026 Klang Valley rates, supply and install:
| Film | Price per sq ft | Best for |
|---|---|---|
| Economy solar film | RM3–RM6 | Lowest cost; darker look |
| Mid-range solar or nano-ceramic | RM6–RM12 | Heat control while staying clearer |
| Premium ceramic or carbon | RM10–RM18 | Heat rejection with high clarity |
| Safety or security film | RM8–RM20 | Holding shattered glass together |
| Decorative or frosted film | RM4–RM10 | Privacy on bathroom and street-facing glass |
| Removal of old film | +RM1.50–RM3 | Bubbled or faded film stripped first |
Sliding door tint prices follow the same per sq ft rates; a big sliding door or floor-to-ceiling glass simply has far more area than a window, so it usually dominates the total. Measure every panel (width times height in feet), add them up and enter the total above. For a quote, WhatsApp us your job details with rough window sizes and the film you are considering.
| Factor | How it changes your quote |
|---|---|
| Film category | Economy solar film is the cheapest; ceramic, carbon and safety films cost more per sq ft. |
| Glass area | Add every panel — big sliding doors and floor-to-ceiling glass dominate the total. |
| Old film | Stripping bubbled or faded film and cleaning the adhesive is charged per sq ft on top. |
| Access | High or hard-to-reach panels, such as double-volume windows, take longer to fit. |
| Purpose | Heat control, privacy and security need different films — say which matters most before you get quotes. |
| Film brand | Films in the same category differ in heat rejection, clarity and privacy; ask for the brand and product name in writing. |
Indicative estimate only — final pricing after a photo assessment or site visit.
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteWhatsApp us your job details and measurements — free quote, we reply within the hour.