Free, instant calculators for Malaysian property — stamp duty, RPGT and tenancy. No sign-up, always current.

All renovation, tenancy & JMB contract tools in one place.
Bathroom, roof & leak-repair estimates — incl. from-RM850 PU injection.
Per-foot-run estimate by material, hardware tier & countertop.
Free awning cost calculator for Malaysia: price per metre run for polycarbonate, canvas, zinc, aluminium louvre and glass awnings, plus gutter, posts and upper-floor access.
Free autogate price calculator for Malaysia: swing, sliding, folding and underground autogate packages supply + install, plus backup battery, GSM, keypad, intercom and loop detector.
Free grille and fence cost calculator for Malaysia: window, sliding, door and railing grilles in mild steel, aluminium or stainless steel, and fencing per metre from BRC to glass.
Free home window tint price calculator for Malaysia: price per sq ft for economy solar, nano-ceramic, premium ceramic, safety and frosted film, plus removal of old film.
Free plaster ceiling price calculator for Malaysia: price per sq ft for flat gypsum, cement board, cove, coffered and multi-tier ceilings, plus cornice, LED strip, openings and old-ceiling removal.
Free built-in wardrobe price calculator for Malaysia: price per foot run for melamine, MR plywood, HMR, premium laminate and solid timber, plus sliding doors, soft-close hinges and spray finish.
Free epoxy flooring price calculator for Malaysia: price per sq ft for basic coating, self-levelling, metallic, flake and anti-slip epoxy, plus a UV-stable topcoat for outdoor areas.
Free hacking cost calculator for Malaysia: wall hacking per sq ft for brick and drywall partitions with making good, or floor tile hacking with re-tiling and levelling.
Free house cleaning cost calculator for Malaysia: deep cleaning, move-in / move-out cleaning and post-renovation cleaning prices by home size, plus extra bathrooms, aircon filters and oven.
Free sofa, mattress and carpet cleaning price calculator for Malaysia: fabric and leather sofa per seat, sectionals, armchairs, dining chairs, mattresses by size, carpet per sq ft and area rugs.
Free wallpaper installation cost calculator for Malaysia: installed price per sq ft for PVC, non-woven, embossed, fabric and designer wallpaper, plus removal of old wallpaper, skim coat and ceiling wallpaper.
Free kitchen cabinet door replacement cost calculator for Malaysia: respray / reface band for a compact kitchen, hinge, drawer runner and lift-up hardware, and a per-foot comparison with a full rebuild.
Free water tank price calculator for Malaysia: installed price for poly, fibreglass (GRP), stainless steel and underground tanks by capacity, old tank removal, frame and crane, plus water tank cleaning.
Free mould and damp wall treatment cost calculator for Malaysia: damp wall treatment and repaint per wall, professional mould remediation by scope, dehumidifier hire and leak detection.
Estimate your budget by area, property type & finish level.
Floor area, tiles to buy with wastage, and cost.
How many downlights, how far apart and how far from the wall — ERCO and Kichler rules.
ST’s recommended lux by room turned into lumens and a number of fittings.
Bathroom renovation cost calculator for Malaysia: basic, mid-range and premium ranges per bathroom, plus moving the toilet or floor trap, large-format tiles and a water heater.
Kitchen renovation cost calculator for Malaysia: basic refresh, mid-range by kitchen size and premium ranges, plus a wet & dry split, new hood and hob, and moving the sink or hob.
Wall panel cost calculator for Malaysia: market ranges for fluted MDF, timber slat, laminate, PU 3D, veneer, porcelain and marble feature walls by wall area, plus framing and lighting.
TV feature wall cost calculator for Malaysia: paint panel, wallpaper, laminate, built-in cabinet wall, stone cladding and PU 3D designs, plus shelves, cabinets, framing, lighting and a TV lift.
Roof repair cost calculator for Malaysia: sealant patching, cracked tiles, ridge capping, metal ridge, flashing, fascia and soffit, and partial structural repairs, added up as a range.
Plumbing cost calculator for Malaysia: call-out, tap replacement, toilet and cistern repair, blocked drains, sewer jetting, burst pipes, concealed and slab leaks and booster pumps, added up as a range.
Water heater installation cost calculator for Malaysia: instant, instant with pump, 15 L and 30–50 L storage and solar heaters, all-in, plus a new circuit, old-unit removal and relocation.
How many litres of paint you need, and the cost.
Right aircon size for your room and sun exposure.
Free aircon cost calculator for Malaysia: regular service, chemical wash, chemical overhaul and gas top-up per unit, plus common repairs — diagnostic visit, capacitor, fan motor, leak repair and control board.
Free electrical cost calculator for Malaysia: add power points, USB and outdoor sockets, dedicated circuits, downlights and lighting points, DB box upgrades and full-house rewiring by home size.
Free property legal fee calculator for Malaysia: SPA and loan agreement lawyer fees on the Solicitors' Remuneration Order 2023 scale, plus 8% SST and the usual disbursements range.
Free home loan eligibility calculator for Malaysia: work out your Debt Service Ratio, the largest new monthly instalment a bank may allow, and the loan and property price that instalment supports.
Free rental and Airbnb renovation payback calculator for Malaysia: months to earn back the spend, break-even rent and an over-investment warning.
Free rental yield calculator for Malaysia: gross and net rental yield from the purchase price, monthly rent, vacancy, agent fee, maintenance, quit rent and assessment, insurance and strata fees.
Free home loan instalment calculator for Malaysia: monthly repayment, total interest and total repaid from the price, margin of finance, your bank's interest rate and the tenure.
MOT + loan + tenancy stamp duty, by 2026 tiers.
Real Property Gains Tax by holding period & seller type.
Clause checklist + safe payment-schedule estimator.
Fill in, e-sign on screen & download a full contract.
Common-property works & maintenance agreement, e-sign.
Record & sign a change to an ongoing renovation.
Issue a quote and award the works, with e-sign.
Recurring servicing / cleaning / upkeep contract.
Free checklist + stamp duty & deposit estimator.
Renovation budget planner for Malaysia: tick the kitchen, bathrooms, built-in carpentry, flooring, painting and rewiring you plan and get a budget range by room and trade.
Vinyl and SPC flooring cost calculator for Malaysia: budget, mid-range LVT/SPC and premium thick SPC installed per sq ft, plus hacking out the old tiles first.
Parquet and timber flooring cost calculator for Malaysia: bamboo, engineered wood and solid timber installed per sq ft, plus tile removal and subfloor levelling.
Staircase renovation cost calculator for Malaysia: cosmetic refresh, moderate renovation, full replacement or a bespoke floating staircase, plus a glass balustrade upgrade.
Whole-house re-piping cost calculator for Malaysia: condo, terrace, semi-D or bungalow with exposed PPR, concealed PPR or concealed copper pipes.
Attic conversion cost calculator for Malaysia: storage attic, home office or hobby room, or a full habitable bedroom, priced as a range from our attic conversion guide.
Skylight cost calculator for Malaysia: fixed polycarbonate or glass, vented manual or motorised, and tubular skylights per unit installed, plus access for high roofs.
Balcony renovation cost calculator for Malaysia: retile and waterproof, composite or timber decking, a glass balustrade or a full enclosure, added up as a range.
Gazebo cost calculator for Malaysia: aluminium and polycarbonate, Meranti timber, chengal or balau hardwood, or brick pillars with a clay tile roof, plus site preparation and fixtures.
Commercial fit-out cost calculator for Malaysia: office, retail shop, cafe and restaurant fit-out per sq ft at three spec levels, multiplied by your floor area.
Office reinstatement cost calculator for Malaysia: light make-good, standard reinstatement or a heavy strip-out to bare shell, per sq ft multiplied by your office area.
Home maintenance budget calculator for Malaysia: a yearly budget by property type, by the 1% of property value rule, or from aircon units and a water tank clean.
WhatsApp us your property details — free quote within the hour.
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free Quote