Defect List & House Defect Checklist Malaysia (VP, Subsale)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchWhatsApp Us
✅ Checklist tool

Defect List & House Defect Checklist
room by room, for VP, DLP, subsale or renovation

Build your defect list as you walk the unit: this house defect inspection checklist runs on your phone. Pick the property type and stage, tick each defect you find, mark how serious it is and add a note. You get a numbered defect list to copy or print — and a short summary you can WhatsApp to us to book an inspection. Everything stays in your browser.

📍 We serve KL, Selangor & Putrajaya.

Homeowner ticking a defect checklist on a phone in an empty new condo

Your defect checklist

New home: defects are reported to the developer in writing, within the DLP of 24 months from VP.

Entrance & living / dining

Kitchen

Bathroom 1

Bathroom 2

Bedroom 1

Bedroom 2

Bedroom 3

Balcony & yard

Windows & doors (whole unit)

Electrical

Plumbing & water pressure

Ceiling, walls & paint

Floor & tiles (hollow tiles)

Defect list

No defects ticked yet. Tick an item when you find a defect.

Not a professional inspection, a quotation or legal advice — a checklist to record what you can see and test.


How to use the checklist

Choose the property type and stage first. Landed homes add an external and roof section; the number of bathrooms and bedrooms sets how many room cards appear. Work through the rooms in order, then the whole-unit sections: windows and doors, electrical, plumbing, walls and floors.

Tick an item only when you find a defect, and pick a severity: urgent for anything active or unsafe, such as a leak or a dead RCCB; report / fix for defects the developer, seller or contractor should put right; cosmetic for finish issues. Add a short note with the location — “left of the window, floor level” — and take a photo on your phone.

The tests in the list come from our guides: the pour, flow and meter tests from checking for water damage at handover, the tap test from popped and hollow tiles, and the RCCB test button from electrical safety inspection.

What goes on a defect list

A defect list — also called a defect checklist or defect check list — is the numbered, written record of every defect you found, one line each: the room and exact location, what is wrong, how serious it is and a photo reference. That is what the Copy and Print buttons produce. A list in that form is easy for a developer, seller or contractor to work through, and easy for you to re-check item by item once repairs are done.

  • New home: send the list to the developer in writing within the DLP of 24 months from VP, and keep proof that you sent it.
  • Within the DLP: re-check each repair against the same numbered list before you sign it off.
  • Electrical items: every power point, switch and the RCCB test button are tested, not just looked at, and a dead RCCB goes on the list as urgent.
  • After renovation: the same list becomes the snag list you walk with your contractor before the final payment.

Using it as a subsale house inspection checklist

For a subsale house inspection, choose the subsale stage before you start. The HDA’s DLP does not cover a subsale purchase, so the list is your evidence for asking the seller to repair, reduce the price or disclose before you commit. Spend the viewing on the items that are expensive to put right: water stains and leaks on ceilings and walls, the pour test in wet areas and on every floor trap, the tap test for hollow tiles, the RCCB test button and the water-meter test with everything off. A landed house adds the external and roof section.

A viewing is short and the seller’s furniture hides walls and floors, so a clean list from a viewing is not proof the house has no defects. Hidden leaks and some electrical faults need tools and experience to find.

After you finish

Copy puts the full numbered list on your clipboard to paste into an email or letter; Print gives a clean page you can save as a PDF. For a new home, send the list to the developer in writing and keep proof that you sent it. The WhatsApp button sends us a short summary — property type, stage, how many defects per area and the top items — so we can quote an inspection.

This checklist is not a professional inspection. It helps you record what you can see and test yourself; some defects, such as hidden leaks, need tools and experience to find. Book a defect inspection with ClickBina and we can also quote to fix what we find.

Not a professional inspection, a quotation or legal advice — a checklist to record what you can see and test.

Want a professional to check it?

Book a ClickBina defect inspection — we reply within the hour, and we can fix what we find.

💬 WhatsApp us to book an inspection

Defect inspection service (KL & Selangor) →

We reply within the hourSSM-registeredFlat price, no hidden charges

Common Questions

What should I check at key collection?
Work room by room: doors and windows, walls and ceilings, floor tiles, wet areas with a pour test, every floor trap, every tap and power point, the RCCB test button and a water-meter test with everything off. The checklist lists each item in that order.
How do I send the defect list to the developer?
In writing, within the DLP, which runs 24 months from vacant possession. Use Copy or Print to get the full numbered list, attach your photos and keep proof that you sent it.
Can I use this as a subsale house inspection checklist?
Yes. Choose the subsale stage. The HDA’s DLP does not cover a subsale purchase, so use the list to ask the seller to repair, reduce the price or disclose before you commit.
Is my checklist saved?
It is saved only in this browser on this device, so you can close the page and come back. Nothing is sent anywhere unless you press the WhatsApp button.
Is this a professional inspection?
No. It records what you can see and test yourself. Hidden leaks and some electrical faults need tools and experience; ClickBina can inspect the unit and quote to fix the defects.
What goes into the WhatsApp summary?
The property type, the stage, your VP date if you entered it, how many defects you ticked per area and the top items, starting with the urgent ones. The full list stays with you to copy or print.
What is a defect list?
A numbered, written record of every defect found in a home, one line each: location, what is wrong, how serious it is and a photo reference. For a new home it goes to the developer in writing within the DLP of 24 months from VP.
What should a house defect inspection checklist cover?
Every room in order, then the whole unit: doors and windows, walls and ceilings, floor tiles with a tap test, wet areas with a pour test, every floor trap, every tap and power point, the RCCB test button and a water-meter test with everything off. Landed homes add the external walls and roof.

Book a defect inspection

WhatsApp us your unit type, size and VP date — we reply within the hour.

WhatsApp ClickBina← All Tools
💬 WhatsApp us to book an inspection