The wet-kitchen classic that takes a hot kuali and a lesung batu. Here is how a concrete top is built and finished, what it costs, and which parts are not DIY.
📍 We serve KL, Selangor & Putrajaya.

A concrete kitchen top, the Malaysian table top konkrit, is a counter cast or built in place on a brick or reinforced-concrete base, then finished with tiles, stone or a smooth sealed screed. It is the traditional wet-kitchen choice because nothing under it can swell, it shrugs off a hot kuali and a lesung batu, and it can follow any shape of kitchen. The trade-offs are that it is permanent, needs wet works and curing time, and tiled versions leave grout lines to keep clean. Indicative Klang Valley price on our guides: RM80 – RM180 per foot run, the cheapest durable top. Laying tiles on it is within reach of a careful DIYer; the base, the slab, the plumbing, gas and power, and any condo approval are not.
A concrete top is not a product you buy; it is a small piece of construction. A base of brick walls or a reinforced-concrete frame is built along the kitchen wall, a slab is cast or formed on top of it, and the surface is finished with tiles, a stone slab or a smooth rendered screed. Doors, often aluminium or PVC, are hung on the front to close off the storage underneath.
Our stainless steel vs aluminium cabinet guide describes the traditional Malaysian wet kitchen as not a cabinet at all, and our concrete plinth guide explains why: nothing under the counter can swell, termites have nothing to eat in the structure, and a lesung batu can be used on the counter without anyone flinching.
The honest downsides are permanence (changing it means demolition), a rougher look than stone, grout lines that collect stains if not sealed, and a programme that has to wait for concrete and mortar to cure.
| Finish | Strengths | Watch out for |
|---|---|---|
| Homogeneous or porcelain tiles | Hard-wearing, easy to replace one tile, wide choice | Grout lines collect stains; choose a large tile to reduce joints |
| Mosaic tiles | Follows curves and odd shapes | Many grout lines; hardest to keep clean |
| Granite or stone slab on the concrete | One piece, fewer joints, heat-tolerant | Needs sealing; joints where slabs meet |
| Smooth rendered or polished screed | Seamless, minimalist look | Must be well sealed or it absorbs oil; hairline cracks show |
| Quartz or sintered slab on a concrete base | Stone look on a base that cannot swell | Resin-based quartz dislikes very hot pans |
For tiled tops, epoxy grout is worth its extra cost in a kitchen, because cement grout is porous and stains. Our grout comparison guide explains the difference.
Most of the everyday annoyance with concrete tops comes from details, not from the concrete. Four matter.
The space under a concrete top is a set of deep bays between the base walls. Drawers are difficult, so storage tends to be deep cavities behind doors. Aluminium or PVC doors suit a wet kitchen because they do not swell; timber-based doors defeat part of the purpose. Our concrete plinth guide suggests a sensible compromise many homes use: a concrete base in the wet kitchen and conventional cabinetry in the dry one.
A concrete top looks like a weekend project, and parts of it are. Others are not, either because they are regulated trades or because a mistake is expensive to undo.
| Task | DIY? | Why |
|---|---|---|
| Retiling an existing sound top | Possible for a careful DIYer | Surface work; the structure is already there |
| Regrouting or sealing grout | Yes | Low risk, big improvement in hygiene |
| Building the base and casting the slab | Not advised | Load, reinforcement, level and curing all have to be right |
| Moving the sink, waste or water pipes | No | Plumbing; leaks end up in the slab or the unit below |
| Moving or extending the gas pipe to the hob | No | Gas work is for a competent gas installer |
| New sockets near the top | No | Electrical work for a competent wireman |
| Any wet works in a condo | Only with approval | Management rules, working hours and waterproofing |
In a condo a concrete top is wet work on a suspended slab, above someone else’s ceiling. Check the house rules and get management approval first, make sure the wet-kitchen floor is waterproofed before the base goes on it, and remember that a masonry base and top are heavy compared with cabinets. Our kitchen waterproofing guide covers the floor under the counter.
These are indicative Klang Valley ranges for 2026 from the ClickBina guides named in the sources section, per foot run of worktop unless stated. They are for the top itself; the base, doors, plumbing and hacking out an old kitchen are priced on top.
| Worktop | Indicative price | Notes |
|---|---|---|
| Concrete / rendered top (table top konkrit) | RM80 – RM180 per ft run | Tiled or rendered on site |
| Laminate on board (postformed) | RM60 – RM150 per ft run | Core swells if water gets in |
| Solid surface | RM150 – RM350 per ft run | Seamless, repairable |
| Granite | RM200 – RM500 per ft run | Needs periodic sealing |
| Quartz (engineered stone) | RM250 – RM600 per ft run | Non-porous; use a trivet |
| Epoxy grout instead of cement grout | +RM1 – RM3 per sq ft | On tiled tops and splashbacks |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteA concrete base with a quartz or granite slab on top combines the two: the base is priced as masonry and the slab at its own rate. Our compact laminate guide compares the other worktop materials in more depth.
A concrete top touches masonry, tiling, plumbing, gas and electrical work, and in a condo the management as well. ClickBina handles whole-house refurbishment and coordinates the trades, so the services are planned before the base goes up and the top is finished to suit the way you cook. WhatsApp us your job details for a quote: the length of counter, where the sink and hob go, the finish you want and whether it is a landed house or a condo. We reply within the hour, a site visit is free, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are typical Klang Valley market ranges for 2026, not fixed rates.