The rate quoted over WhatsApp is a shell price, not your kitchen. Here is every item that gets added afterwards, what a real quotation must list, and the deposit red flags worth walking away from.
📍 We serve KL, Selangor & Putrajaya.

Ask five cabinet contractors for a price and you will get five numbers per foot run, and the lowest one is very often the most expensive kitchen. This is not usually fraud. It is a quoting convention that has drifted into a marketing device: the per-foot-run figure quoted over WhatsApp is a shell price covering a plain carcass and a plain door, and everything that turns a shell into a working kitchen is added afterwards. When a buyer treats that number as the price of the kitchen and multiplies it by their wall length, the eventual invoice feels like a betrayal — even when every added item was legitimate.
The fix is not to hunt for a lower rate. It is to refuse to compare rates at all until both quotations list the same things. This page sets out what those things are, in the order they usually appear on the final bill. If you want the honest market ranges first, they are on the kitchen cabinet cost hub; if you want to know when in the process each cost should surface, the custom cabinet process guide walks through the stages.
A foot run is one linear foot of cabinetry measured along the wall, regardless of height. The convention in Malaysia is that base cabinets and wall cabinets are counted separately — ten feet of base run plus ten feet of wall cabinets is twenty feet, not ten. That alone catches people who assumed a quoted rate covered both.
Beyond that, the definition varies by company, which is the root of the whole problem. Some rates include a basic hinge and a plinth; others include the carcass and door only. Some count a tall unit as one foot of run; others apply a multiplier. Some measure the wall; others measure the cabinets, which differ once fillers are involved. None of these is dishonest in itself. All of them make two quotations incomparable until you ask the question directly: what exactly is inside your per-foot rate, and what is outside it? Get the answer in writing.
These are the items that most commonly sit outside a headline per-foot-run figure and inside the final invoice:
| Item | Why it is charged separately | How it is usually priced |
|---|---|---|
| Soft-close hinges | Base rate often assumes a plain hinge | Per hinge, and doors need two to four each |
| Drawer runners and drawer boxes | A drawer costs far more than a door and shelf | Per pair or per drawer |
| Tall / larder units | Much more cabinet in the same linear foot | A multiplier on the base foot rate |
| End panels | Finishes an exposed carcass side | Per panel |
| Plinth / skirting | Not part of the carcass; PVC or aluminium costs more than board | Per foot or per run |
| Fillers and scribes | Needed wherever a run meets a wall or an appliance | Per piece |
| Sink and hob cut-outs | An operation on the countertop, not the cabinet | Per cut-out |
| Countertop | Separate material, templated after installation | Per foot run of top |
| Carcass upgrade to MR plywood | Better board in the wet zone | Added per foot run |
| Accessories (bins, carousels, pull-outs) | Mechanisms, not cabinetry | Per item |
| Transport, hoisting and disposal | Delivery, lift access, removing the old kitchen | Per job |
| Site works | Hacking, tiling, plumbing and electrical moves | Separate trades entirely |
WhatsApp us your job details — we'll reply as soon as we can with a free quote.
💬 Get Your Free QuoteEvery one of those can be a fair charge. The problem is only ever disclosure — whether it appeared on the quotation you compared, or on the invoice you received.
The arithmetic is worth walking through because it explains why the gap is so consistently large. A buyer measures a 12 ft wall, is quoted a rate over WhatsApp, multiplies, and has a number in their head. Then the real kitchen arrives: the wall cabinets are counted as their own run, so the footage roughly doubles. A tall larder unit and a fridge surround are added at a multiplier rather than the base rate. Every door gets soft-close hinges. Two banks of drawers appear where there were shelves. The exposed end of the island needs a finished panel, and the run beside the fridge needs a filler so the door opens. The countertop, the sink cut-out and the hob cut-out are separate. Transport and disposal of the old kitchen appear at the end.
None of those additions is an overcharge. Together they are why the final invoice commonly lands well above the buyer’s original per-foot estimate. The number was never wrong; it was answering a different question from the one the buyer thought they had asked.
These three deserve singling out because they are the biggest and most frequent surprises. A tall unit is quoted across the market at a multiplier of roughly 1.6 – 2.2x a base-cabinet foot (market estimate 2026, indicative Klang Valley), which is legitimate — it is two to three times the board, doors and hinges of a base cabinet in the same linear foot — but a quotation that shows a single rate and a total footage has buried it.
End panels finish any carcass side that is visible: the end of a run, the side of an island, the exposed flank beside a fridge. Without them you are looking at raw board edge, so they are not optional, and they are charged per panel. Fillers are the narrow strips that let a run meet a wall that is not square, or set a cabinet back so a fridge or corner door can open fully. Almost every kitchen needs several. Ask for tall units, end panels and fillers to be shown as their own lines with quantities — if a contractor resists, that is the answer.
Cut-outs are operations on the countertop rather than on the cabinet, priced with the top — a sink cut-out, a hob cut-out, and sometimes a drainer groove or a tap hole. They are made at templating, against the physical sink and hob, which is why they cannot be finalised earlier. The countertop itself is supplied and installed with your cabinets and priced per foot run on the kitchen countertop guide.
Site conditions are the other under-quoted line. A high-floor condo with a single service lift, restricted loading hours and a strata works permit is slower to install than a ground-floor terrace you can unload straight into — the building rules are covered in the strata renovation rules guide. Removing and disposing of an old kitchen is real labour and a lorry load. Walls that are out of square need scribing. Floors that are not level need packing. A quotation prepared without a site visit has priced none of it, which is the first reason to be wary of a firm price given over WhatsApp from photographs alone.
The quietest way to win a price comparison is to keep the visible specification and change the invisible one. Hinges, runners and edge banding are all inside the cabinet and all decide how long it lasts. A quotation that names a hardware tier for the kitchen without saying which items get it leaves room to fit premium hardware on the show run and generic elsewhere — sometimes disclosed, sometimes not. Edge banding is even less visible: the adhesive used to bond the tape is what determines whether the kitchen starts peeling at the sink in two years, as the water damage and swelling guide explains.
Two questions close this gap. Which hinge and runner tier, on which cabinets, and how many hinges per door? And which edge banding adhesive on the wet-kitchen run? Prices for the hardware tiers themselves are on the soft close hinge guide, so you can sanity-check whether a quotation’s hardware allowance is plausible.
A quotation you can actually compare and enforce shows, run by run: the carcass board type and thickness; the door finish by name; the edge banding method; the hinge and runner tier with quantities; the number of doors and drawers; tall or larder units shown separately with their pricing basis; end panels, plinths, fillers and cornices with quantities; accessories itemised; the countertop material with its per-foot rate and every cut-out; transport, installation, hoisting and disposal; and the total with any exclusions written out explicitly.
It should also carry the commercial terms in writing: the drawing revision number the price relates to, the payment stages and what triggers each, the expected delivery window, and what happens if a site dimension changes after the measure. A single line reading “kitchen cabinet as per drawing — RM x” is not a quotation. It is a number, and a number cannot be compared, checked or held to. If your cabinets sit inside a bigger job, the renovation contract guide covers the wider agreement.
Around a 50% deposit on order is the market norm in Malaysia, and being asked for one is not a warning sign — boards are cut to your sizes and cannot be resold. What matters is what surrounds it. Be cautious when the deposit is requested to a personal bank account rather than a registered company account; when there is no itemised quotation and no signed drawing revision to tie the money to; when the payment stages are not written down; when a discount expires today on a kitchen that takes a month to build; when the deposit is asked for before any site measure has happened; or when the amount requested creeps upward after you agree.
Whatever figure and stages you settle on, confirm them in writing before paying, and keep the receipt attached to the signed drawing. The pattern in nearly every deposit-loss story is the same — money moved before anything was documented.
Basic checks take under an hour and rule out most of the risk. Confirm the business is registered and that the registered name matches the name on the quotation and on the bank account you are asked to pay. Confirm a real address you could visit — a showroom, an office, a workshop — rather than a phone number and a social media page. Ask where the boards are actually cut: a genuine operation will tell you whether they run their own factory or use a named fabricator, and neither answer is wrong, but evasion is informative.
Then look for evidence of continuity: how long the business has traded under that name, reviews that mention specific projects rather than generic praise, and whether they can put you in touch with a recent customer. For larger works you may also want a contractor with the appropriate registration, which the CIDB contractor guide explains. None of this is rude to ask. A company with nothing to hide answers it without friction.
A recurring pattern in the cabinet trade is a portfolio and a set of 3D renders that do not belong to the person showing them. The tells are learnable. The renders look more polished than the company’s own photographs. The styling — the plants, the artwork, the light — is consistent across projects that are supposedly different homes and different clients. The kitchens shown do not match the local context: European window proportions, no wet kitchen, appliances not sold here. And crucially, the render never changes to reflect what you asked for — you request a taller larder or a different door colour and receive the same image again.
The counter-test is simple: ask for a render of your kitchen with your dimensions, your window and your beam drop, and ask for unstyled site photographs of finished work — the real ones, taken on a phone on handover day, with a plug socket in shot. Anyone who has actually built kitchens has hundreds of those. A reverse image search on a suspiciously polished render takes thirty seconds.
Warranty language is where a lot of vagueness accumulates, and the useful discipline is to ignore the headline number and read the scope. A claim of “lifetime” or a long period means little without three specifics: what is covered (carcass, doors, finish, hardware — usually different terms for each), what is excluded, and who honours it, since hardware is generally covered by its manufacturer rather than the installer. Watch for broad exclusion clauses such as damage from “improper maintenance” or “excessive moisture” without any definition — in a Malaysian wet kitchen, an undefined moisture exclusion can be read to cover almost any failure.
What you want is boring and specific: which components, for how long each, what voids cover, and how a claim is made. And it should be on the quotation or the order form, not described verbally. ClickBina states cover in writing on the paperwork for your job rather than as a headline number, because a warranty you cannot read is not a warranty.
Do not compare the totals until the scopes match. The method that works is to write out one specification — carcass board, door finish, edge banding, hinge and runner tier with counts, exact cabinet list including tall units, end panels, plinth material, fillers, accessories, countertop material, cut-outs, transport, disposal and installation — and send that identical brief to everyone. Then any difference in price is a difference in price, not a difference in what you are buying.
| Question to ask both quoters | What a good answer looks like |
|---|---|
| What is inside your per-foot rate, and what is outside it? | A written list, not a reassurance |
| Are wall cabinets counted as a separate run? | Yes, with the footage shown separately |
| How are tall units priced? | A stated multiplier or a separate line item |
| Which hinge and runner tier, on which cabinets, how many per door? | Named tier, quantities, counts per door |
| Which edge banding adhesive on the wet run? | A specific method, not “standard” |
| Are end panels, plinths and fillers included and how many? | Quantities on the quotation |
| Is the countertop and every cut-out included? | Material, per-foot rate, cut-outs listed |
| Transport, hoisting, old-kitchen disposal? | Priced or explicitly excluded |
| Payment stages and what triggers each? | In writing, tied to a drawing revision |
| What exactly does the warranty cover and exclude? | Component by component, in writing |
ClickBina quotes kitchen cabinets across Kuala Lumpur and Selangor line by line — board, finish, edge banding, hardware tier and counts, tall units, panels, plinths, fillers, cut-outs, transport and installation — so the number you compare is the number you pay. The same guidance in Bahasa Malaysia is at sebut harga kabinet dapur dan kos tersembunyi. Send us your kitchen dimensions and any quote you have already received on WhatsApp, and we will tell you what it is missing — we'll reply as soon as we can.
WhatsApp us your job details for a free quote — we'll reply as soon as we can.
💬 Get a Free QuoteHow we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Tell us what you need — we'll reply as soon as we can.