Quartz Stone Price Malaysia 2026: RM250–RM600 Per Foot Run
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Custom Cabinets & Carpentry

Quartz Countertop Price
Quartz Stone Per Foot Run in Malaysia (2026)

Quartz stone is the default kitchen top in the Klang Valley — but the same slab gets quoted three different ways. Here is what quartz actually costs per foot run, what moves the number, and how to check the stone in front of you is really quartz.

📍 We serve KL, Selangor & Putrajaya.

Quartz stone kitchen countertop being fitted onto base cabinets
Quartz countertop price in Malaysia runs about RM250–RM600 per foot run supplied and installed, against RM200–RM500 for granite, RM400–RM900 for sintered stone and RM60–RM150 for a laminate top (market estimate 2026, indicative Klang Valley). Quartz stone price moves with slab grade, thickness, edge profile and the number of cut-outs — not just the material name printed on the quotation. WhatsApp ClickBina for a fixed per-foot quote.

Quartz countertop price per foot run

Quartz is the default kitchen top in the Klang Valley, and the quartz stone price you are quoted is almost always per foot run — the length of base cabinet the slab has to cover. Here is where every common material sits (market estimate 2026, indicative Klang Valley):

Countertop materialPrice (2026, Klang Valley)Notes
Quartz (engineered stone)RM250 – RM600 per ft runmost kitchens; mid-grade ~RM380/ft
Sintered stoneRM400 – RM900 per ft runheat-proof, marble look
GraniteRM200 – RM500 per ft runneeds sealing yearly
Solid surfaceRM150 – RM350 per ft runseamless, repairable
Concrete / rendered top (table top konkrit)RM80 – RM180 per ft runwet-kitchen tradition; tiled or rendered on site
Laminate topRM60 – RM150 per ft runtight budget / rental

Get a free quote on WhatsApp

WhatsApp us your job details — we'll reply as soon as we can with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

The spread inside quartz alone is wide — RM250–RM600 per foot run — because “quartz” on a quotation covers everything from a thin, heavily filled budget slab to a branded engineered stone with a consistent pattern and a documented composition. A mid-grade quartz sits around RM380 per foot run, which is the figure our kitchen countertop comparison guide uses and the one most Klang Valley kitchens actually land on. This page is the cost page; that one is the material comparison — the figures here match the countertop guide.

Why quotes are per foot run, not per square foot

Stone yards think in square feet, because that is how a slab is bought. Kitchen fabricators in Malaysia quote per foot run, because that is how a kitchen is measured. A standard base cabinet is 600 mm deep, so one foot run of top is roughly two square feet of stone once you allow for the front overhang and the offcut waste around cut-outs. That conversion is why a per-square-foot advertisement and a per-foot-run quotation can describe the same job, and why comparing two quotes in different units is the fastest way to talk yourself into the wrong stone.

Ask every supplier to quote in the same unit, and ask whether the number is supply-only or supplied and installed — templating, transport, hoisting and levelling are real costs. Countertops here are quoted supplied and installed with your cabinets, so one team owns whether the top sits flat.

Budget quartz vs branded quartz

Engineered quartz is roughly ninety-odd per cent crushed quartz mineral bound in a polymer resin with pigment. The cheap end of the market shifts that ratio: more resin, more filler, less mineral. It looks fine in the showroom and behaves differently in a Malaysian kitchen — resin-heavy slabs are softer, discolour faster near a window, and are more sensitive to heat because it is the resin, not the quartz, that gives way first.

TierWhat you typically getWhat to watch for
Budget quartz (bottom of the RM250–RM600 band)Local or unbranded slab, plain speckle patterns, thinner nominal thicknessHigher resin content, visible joins, colour drift in sunlight
Mid-grade (about RM380 per foot run)Consistent colour, marble-look veining, documented compositionPattern matching across joins is an extra conversation
Branded / premium (top of the band)Named engineered-stone range, batch traceability, wider slabsLonger lead time; confirm the exact range name in writing

None of this makes budget quartz a mistake — for a rental unit or a dry-kitchen counter it is a rational buy. It becomes a mistake when it is sold as a premium slab at a premium price.

How to check the slab is really quartz

The recurring complaint in Malaysian renovation forums is the same one every year: a top bought as “quartz” that turns out to be compressed marble — marble or limestone chips bound in resin. It is a legitimate material at a legitimate price; the problem is only ever the label and the price attached to it. Compressed marble is calcium carbonate, so it is porous, it stains, and it reacts to household acid. Engineered quartz does not. We are not going to name suppliers — the honest position is that you cannot tell by looking, so you test instead.

  • Ask for an offcut. Any fabricator cutting your sink hole has a piece of your actual slab. A supplier who will not part with one is telling you something.
  • The acid check. A drop of lemon juice or white vinegar left on that offcut for a few minutes will typically dull or etch a marble-based composite; quartz should wipe clean. Do it on the offcut, never on the installed top.
  • The water check. Water sitting on quartz beads and wipes away; on a porous composite it darkens the surface as it soaks in, then fades as it dries.
  • Look at the back and the label. A branded engineered quartz slab is normally unbacked, with a slab or batch marking on the underside. A fibreglass mesh glued to the back is the tell-tale of a slab that needs the reinforcement — typically a compressed-marble or resin-heavy composite. Ask to photograph the underside before fabrication.
  • Sanity-check the price. A quotation far below the RM250–RM600 per foot run band is not a bargain on quartz; it is a different material.

Put the material name, the range and the thickness on the quotation before you pay anything. A written spec is the only thing that turns a verbal “yes, quartz” into something you can hold someone to.

Sintered stone vs quartz: the heat question

Sintered stone at RM400–RM900 per foot run is the one material that genuinely answers the Malaysian heat question. It is mineral powder pressed and fired at very high temperature with no polymer binder, so there is no resin to soften, scorch or yellow. That matters here more than it does in a cooler kitchen: a wok lifted straight off a high-output burner and parked on the counter is a normal Tuesday in a Malaysian wet kitchen, and it is the single most common way a quartz top gets a permanent pale scorch ring.

The trade-offs are real. Sintered stone is harder to fabricate, so cut-outs and mitred edges cost more and the fabricator needs the right tooling; thin panels can chip at an unsupported edge; and the price sits well above quartz. The sensible middle path for most homes is quartz on the dry-kitchen run and sintered stone (or plain stainless) on the heavy-cooking counter — which is exactly how a wet and dry kitchen split is supposed to work. Whatever you choose, a trivet is cheaper than a re-fabrication.

Granite: the natural-stone alternative

Granite at RM200–RM500 per foot run remains popular, and “granite stone” is still one of the highest-volume countertop searches in Malaysia. It is natural quarried rock, so it handles heat far better than quartz, every slab is unique, and darker Indian and Chinese granites are genuinely cheap at the bottom of the band. The cost is maintenance: granite is porous, so it wants sealing roughly once a year, and an unsealed slab will hold a turmeric or oil stain.

Natural veining also makes a seam more obvious than it is in a uniform engineered slab. If you love the material, budget for the sealer and accept the pattern lottery; if you want a top that looks the same in five years with no ritual, quartz is the easier life. The full material-by-material comparison lives on the countertop comparison guide.

Solid surface and laminate tops

Solid surface at RM150–RM350 per foot run is an acrylic-based composite that joins invisibly and, crucially, can be repaired — a scratch or a burn sands and polishes out, which no stone top allows. It is the right answer for a seamless integrated sink, a curved counter or a bathroom vanity, and the wrong answer beside a high-output burner.

Laminate at RM60–RM150 per foot run is the honest budget option: a postformed board with a laminate face, fine in a dry kitchen, a rental refresh or a laundry area. Its weakness is water at the joins and around the sink cut-out — once moisture reaches the substrate the board swells and the edge lifts, the same failure that ruins a particleboard carcass. Near a sink, the cut-out edges must be properly sealed.

Concrete tops (table top konkrit)

The table top konkrit — a cast or rendered concrete counter finished with tiles or a smooth screed — is a genuine Malaysian tradition rather than a fashion, and at RM80–RM180 per foot run it is the cheapest durable top on this list. It is built in place on a brick or reinforced base, so there is nothing to lift, nothing to crack under a lesung batu, and no resin to scorch. That last point is exactly why it persists in wet kitchens: pounding sambal and setting down a screaming-hot kuali are not activities engineered stone enjoys.

What you give up is flexibility and finish. A concrete top is permanent — you cannot change it without demolition — and it needs wet works, curing time and a competent tiler, which lengthens the programme. Tiled versions bring grout lines to keep clean; smooth screed versions need a good sealer or they will absorb oil. Many homes end up with the best of both: a concrete or tiled counter in the wet kitchen, and a quartz top in the dry kitchen where it is seen. The Bahasa Malaysia version of this cost breakdown lives at harga table top dapur.

Cut-outs, sinks and upstands

The stone rate is not the whole top. These are the line items that move a quotation, and the ones people forget to ask about (market estimate 2026, indicative Klang Valley):

ItemUsually included?What to confirm in writing
Hob cut-outOften includedExact hob model and cut-out dimensions before fabrication
Drop-in sink cut-outOften includedSink template supplied on templating day
Undermount sink cut-outUsually charged extraPolished internal edge and support brackets
Upstand / back splash strip (100–150 mm)Usually charged per foot runWhether it is the same slab and the same finish
Special edge profileExtra above a straight edgeWhich profile, on which runs
Tap and soap-dispenser holesUsually includedNumber of holes and their spacing
Hoisting to a high-floor condoSometimes extraLift access and slab size on templating day

The undermount sink surprises people most: it needs a polished internal edge, support underneath and a carcass built to carry the load — a reason to specify a plywood carcass under a heavy sink. Choose the sink and hob before templating; a top cut for the wrong model is scrap.

Edge profiles, thickness and joins

Most engineered slabs arrive around 20 mm thick, and a straight or lightly rounded edge is the standard price. Everything else is fabrication time. A mitred edge, where two pieces are joined at 45 degrees to fake a chunky 40 mm or 60 mm slab, is the popular upgrade because it delivers the heavy look without buying a thicker stone — but it doubles the cut length and needs a clean colour match at the corner. A waterfall end, where the top folds down the side of an island to the floor, needs extra slab and is the most expensive detail on a normal kitchen.

Joins are the other honest conversation. Slabs are finite, so any run longer than a slab has a seam and an L-shape almost always has one at the corner. A good fabricator puts the join where a cabinet division supports it, away from the sink cut-out, and matches the pattern across it — ask to see the layout drawing before the slab is cut. Plan island tops against your island dimensions, since an oversized island can force a seam down the middle of the showpiece.

Worked example: a 15 ft L-shape plus island

Take a typical Klang Valley kitchen: a 15 ft L-shaped base run plus a 10 ft island, so 25 feet of top in total. At mid-grade quartz of RM380 per foot run, that is RM9,500 for the stone and basic fabrication — the same worked example the countertop comparison guide uses. Across the full quartz band of RM250–RM600 per foot run, the same kitchen ranges from RM6,250 to RM15,000.

Then add what is not the stone rate: the upstand, an undermount cut-out, a mitred island edge, hoisting to a high floor. Two rules keep you out of trouble — get those extras itemised, and measure your own run before you shop (a single-wall kitchen is typically 10–14 ft, an L-shape 14–22 ft, an island another 8–14 ft). Budget the top as one line inside the kitchen cabinet cost guide and the kitchen renovation cost guide.

Care, staining and what actually cracks a top

Quartz is easy to live with: soap and water, no sealing, no special products. What damages it is heat and abuse, not dirt — a hot pot base or a portable induction ring left running on the surface can scorch the resin permanently, and strong alkaline or bleach-based cleaners dull the finish over time.

Cracks almost never come from cooking. They come from unsupported spans — a long overhang without brackets, a cut-out corner without a radius, or a carcass that has sagged because water got into it. A swollen carcass drops a corner, the stone takes the strain, and a hairline runs out from the sink cut-out. If a top has already cracked, deal with the cabinet first or the replacement will do the same thing — see the cabinet material guide for what should be underneath it.

Ready to price your cabinet or carpentry job?

WhatsApp us your job details for a free quote — we'll reply as soon as we can.

💬 Get a Free Quote
Free quote on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Sources & methodology

How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.

Common Questions

How much is quartz stone per foot in Malaysia?
Quartz countertop price runs about RM250–RM600 per foot run supplied and installed (market estimate 2026, indicative Klang Valley), with mid-grade slabs around RM380 per foot run. The spread reflects slab grade, thickness and pattern — not just the word “quartz” on the quotation.
Is quartz better than granite for a Malaysian kitchen?
For most homes, yes — quartz is non-porous, needs no annual sealing and gives a consistent pattern, at RM250–RM600 per foot run against RM200–RM500 for granite (market estimate 2026, indicative Klang Valley). Granite wins on heat tolerance and on price at the bottom of its band, but it must be sealed roughly yearly or it will hold an oil or turmeric stain.
Can I put a hot wok directly on a quartz top?
Better not to. Engineered quartz is bound with polymer resin, and it is the resin that scorches — a hot base left on the surface can leave a permanent pale ring. Use a trivet, or put sintered stone or stainless steel on the heavy-cooking run, where the material genuinely tolerates it.
How do I know I am getting real quartz and not compressed marble?
Test rather than trust. Ask for an offcut of your own slab, then leave a drop of lemon juice or vinegar on it for a few minutes — a marble-based composite typically dulls or etches, while quartz wipes clean. Water that soaks in and darkens the surface is another sign. Also put the material name and thickness on the quotation before paying.
Is sintered stone worth the extra over quartz?
It is if your kitchen sees serious heat. Sintered stone is fired with no resin binder, so it does not scorch, but it costs RM400–RM900 per foot run against RM250–RM600 for quartz (market estimate 2026, indicative Klang Valley) and is more expensive to cut. Many homes use sintered stone or a concrete top in the wet kitchen and quartz in the dry kitchen.
What is a table top konkrit and is it cheaper?
It is a concrete counter cast or rendered in place and finished with tiles or a smooth screed, common in Malaysian wet kitchens. At RM80–RM180 per foot run (market estimate 2026, indicative Klang Valley) it is the cheapest durable top here, it shrugs off heat and pounding, and it cannot be moved later. It also needs wet works and curing time, so it lengthens the job.
Does the countertop price include the sink and hob cut-outs?
A hob cut-out and a drop-in sink cut-out are often included; an undermount sink cut-out, an upstand, a special edge profile and hoisting to a high floor usually are not. Ask for these to be itemised on the quotation before you commit — they are the reason a per-foot rate rarely matches the final invoice.
Do you supply the countertop as well as the cabinets?
Yes — countertops are supplied and installed with your cabinets, so one team is responsible for the carcass, the templating and whether the top finally sits flat. Send your kitchen layout on WhatsApp and we will quote the cabinets and the top together as one fixed per-foot price.
What is the quartz stone price per sq ft?
Kitchen fabricators in Malaysia quote quartz per foot run, at RM250-RM600 per foot run supplied and installed (market estimate 2026, Klang Valley). Stone yards sell slabs per square foot, and one foot run of a standard 600 mm deep top uses roughly two square feet of stone once overhang and offcuts are allowed for. So a per-sq-ft slab price and a per-foot-run quote are not directly comparable; ask everyone to quote in the same unit.
How much is a quartz stone kitchen top?
Measure the total length of top: a single-wall kitchen is typically 10-14 ft, an L-shape 14-22 ft and an island another 8-14 ft. A 15 ft L-shape plus a 10 ft island (25 ft) comes to about RM9,500 in mid-grade quartz at RM380 per foot run, or RM6,250-RM15,000 across the full quartz band (market estimate 2026, Klang Valley). Upstands, undermount cut-outs, mitred edges and hoisting are extra.
Is sintered stone more expensive than quartz?
Yes. Sintered stone runs RM400-RM900 per foot run against RM250-RM600 for quartz (market estimate 2026, Klang Valley), and its cut-outs and mitred edges cost more to fabricate. What you pay for is heat resistance: there is no resin to scorch, so it suits the heavy-cooking counter while quartz suits the dry-kitchen run.