What full aluminium kitchen cabinets cost per foot run in KL and Selangor, what they are genuinely better at, where they fall short, and how the ten-year figure compares with board cabinetry.
📍 We serve KL, Selangor & Putrajaya.

“Aluminium kitchen cabinet” in the Malaysian market almost always means a full aluminium system: an extruded aluminium frame for the carcass and the door stiles, with infill panels that are aluminium composite, aluminium honeycomb, glass or a coated board, assembled with screws and brackets rather than glue and dowels. It is not a wooden cabinet with an aluminium trim. The point of the system is that there is no cellulose in the structure — nothing for water to swell, nothing for fungus to colonise and nothing for termites to eat.
That matters more here than in most markets. Malaysian kitchens run at high humidity all year, wet kitchens get washed down rather than wiped, and ground-floor landed properties sit in termite country. Timber-based cabinetry survives all of that only if the carcass, the edge banding and the ventilation are all right. Aluminium survives it by being the wrong material to attack.
Here is where aluminium sits against the alternatives, installed, with basic hardware and the countertop excluded (market estimate 2026, indicative Klang Valley):
| Cabinet build | Price per foot run (2026, Klang Valley) | Best suited to |
|---|---|---|
| Melamine board (particleboard / MDF carcass) | RM180 – RM300 per ft run | budget dry kitchen, wardrobes |
| Laminate / HPL door (MDF or plywood carcass) | RM280 – RM420 per ft run | mid-range, most common |
| Moisture-resistant (MR) plywood carcass, laminate door | RM350 – RM600 per ft run | wet-kitchen best value |
| Full aluminium (3G / 4G frame, powder-coated) | RM400 – RM700 per ft run | waterproof, termite-proof; wood-grain coat at the top end |
| Stainless steel cabinet | RM650 – RM1,000 per ft run | heavy-cooking / outdoor / commercial |
| Solid wood (nyatoh / meranti) door & frame | RM600 – RM1,000 per ft run | premium; needs termite treatment |
WhatsApp us your job details — we'll reply as soon as we can with a free quote.
💬 Get Your Free QuoteSo aluminium at RM400 – RM700 per foot is roughly double basic melamine, sits above laminate, and overlaps the top of the moisture-resistant plywood band. On a 15-foot run that is about RM6,000 – RM10,500 for the cabinetry alone (market estimate 2026, indicative Klang Valley). It is a mid-to-upper choice on day-one price — not a luxury one, and not a budget one either. If you are pricing the whole kitchen rather than one material, start at kitchen cabinet cost.
Searches often ask for an aluminium kitchen cabinet price per square foot, but Klang Valley cabinet makers almost always quote per foot run: the length of the cabinet line measured along the wall, with the standard base-cabinet height and depth already built in. That is the RM400 – RM700 per foot figure in the table above. A per-square-foot rate, where you see one, is measuring something other than run length, so the two numbers cannot be compared directly.
To budget, measure the length of each wall that will carry cabinets and add the runs together. A 15-foot run of full aluminium works out at about RM6,000 – RM10,500 for the cabinetry alone, before the countertop. Where you land inside the band depends on the coating (plain powder-coat at the lower end, wood-grain at the top) and on the door frame series. If a quote is written per square foot, ask the supplier to restate it per foot run, with the frame series, panel type and glass thickness listed, so you can line it up against other quotes.
The spread inside that single aluminium band is almost entirely about the panel and the coating.
Between the two, the structural performance is broadly the same — you are paying for appearance, section weight and coating quality. If the run is behind a door in a wet kitchen, basic is the rational buy; if it faces the living room, the wood-grain premium is what stops the kitchen looking like a service area.
Aluminium doors are commonly sold by a “G” grade — 3G, 4G, 5G — which in Malaysian trade usage describes how much of the aluminium frame you can see rather than any official standard. In a 3G door the glass panel is inset inside a visible aluminium frame, so a border of metal shows all the way round. A 4G door uses a slimmer frame with the glass sitting flush with the face, so only a thin line of frame is visible. In a 5G door the frame is concealed behind the glass entirely — the panel covers the whole face and wraps the edges, giving a frameless look, and it is the heaviest and the most expensive of the three. The practical consequence is weight. A heavier glass door needs hinges rated for it, or three to four hinges per door instead of two, and a cabinet maker who upgrades the door without upgrading the hinge is building in a sagging door. There is a fuller breakdown in 3G vs 4G vs 5G aluminium glass cabinet doors, including the hinge-load problem.
Note that the G-grade is a door specification, not a whole-cabinet one. You can have a 4G glass door on a basic aluminium carcass, or a solid composite panel door on a premium frame. Ask a quote to state the frame series, the panel type and the glass thickness separately, because “4G” on its own tells you less than it sounds like it does.
Day-one price is the wrong comparison for a wet kitchen. The honest comparison is what the run costs over ten years, including any rebuild. Trade guidance on service life in Malaysian conditions puts basic melamine at roughly five to eight years in a wet kitchen, a plywood carcass with a laminate door at ten to fifteen, and an aluminium system at fifteen to twenty or more — treat those as indicative service-life bands rather than guarantees, since actual life depends heavily on ventilation, leaks and how hard the kitchen is used.
Applying that to a 15-foot wet-kitchen run at the rates above gives the following (market estimate 2026, indicative Klang Valley). The “fit-outs” column is simply how many times you would expect to build that run inside ten years:
| Build | Indicative service life | One fit-out, 15 ft | Inside 10 years | 10-year cost |
|---|---|---|---|---|
| Melamine board (particleboard / MDF carcass) | about 5–8 years | RM2,700 – RM4,500 | 2 fit-outs | RM5,400 – RM9,000 |
| Moisture-resistant (MR) plywood carcass, laminate door | about 10–15 years | RM5,250 – RM9,000 | 1 fit-out | RM5,250 – RM9,000 |
| Full aluminium (3G / 4G frame, powder-coated) | about 15–20+ years | RM6,000 – RM10,500 | 1 fit-out | RM6,000 – RM10,500 |
Read down the last column and the argument becomes clear: the cheapest option on day one is not the cheapest over a decade once the wet kitchen forces a second fit-out, and aluminium’s premium over a good plywood build is far smaller than its premium over melamine. Two caveats keep this honest. First, the second melamine fit-out only happens if the run is genuinely wet — in a dry kitchen melamine can comfortably outlast the ten years, and the arithmetic reverses. Second, replacing a run is not only the cabinet price; it is also the disruption, the countertop and sometimes the tiling behind it, none of which is in the table. Both of those push the conclusion the same way.
It is a real material with real drawbacks, and a contractor who lists none is selling rather than advising.
The clearest case for aluminium is the Malaysian dapur basah: heavy wok cooking, a sink that gets used hard, a floor that gets hosed. That is the run where melamine reliably fails and where the ten-year table above earns its keep. The second clearest case is a landed ground-floor kitchen in an area with known termite pressure. The third is anything semi-exposed — a back porch, a wash area, a covered outdoor kitchen — where humidity swings and occasional rain make timber a poor bet.
A very common and sensible compromise is a mixed kitchen: aluminium in the wet zone where it does the work, and laminate or acrylic in the dry kitchen where it is seen. The two do not have to match if the dry kitchen is a separate room. Wet kitchen vs dry kitchen sets out how the split is normally organised, and kitchen renovation cost puts the cabinetry back into the whole-job budget.
Stainless steel is the other metal answer, and at RM650 – RM1,000 per foot (market estimate 2026, indicative Klang Valley) it sits above aluminium. Stainless is harder, takes heat better, and is the commercial-kitchen default; aluminium is lighter, cheaper, easier to coat in a wood-grain or colour finish, and does not show every fingerprint. For a domestic wet kitchen most households land on aluminium; for a heavy-cooking or semi-commercial setup stainless earns the premium. The trade-offs are set out in stainless steel vs aluminium kitchen cabinets. There is also a middle path worth knowing about: a concrete or masonry base with aluminium doors, which is a long-standing Malaysian wet-kitchen build.
Hardware is more important on aluminium than on board cabinetry, because the doors are heavier and the material is noisier (market estimate 2026, indicative Klang Valley):
| Hardware item | Typical price (2026, Klang Valley) | Notes |
|---|---|---|
| Standard hinge (no soft-close) | RM3 – RM8 per hinge | basic, no damping |
| Soft-close hinge, generic / DTC | RM8 – RM20 per hinge | generic and DTC-type brands |
| Soft-close hinge, Blum / Hettich / Hafele | RM18 – RM40 per hinge | European brands, per hinge |
| Ball-bearing drawer runner | RM25 – RM60 per pair | side-mounted, per pair |
| Blum Tandembox / Legrabox drawer system | RM150 – RM400 per drawer | metal box system, per drawer |
| Lift-up (Aventos-type) mechanism | RM250 – RM600 per door | for wall units, per door |
Three things to insist on. Hinges rated for the actual door weight — heavy glass doors want heavy-duty hinges or an extra hinge per door, not the standard pair. Soft-close on every door, because a hard-closing aluminium door is genuinely loud. And dampening buffers where panels meet the frame. Aluminium fixings also behave differently: screws bite into extrusion channels rather than into board, which is a stronger fixing but far less forgiving of a hole drilled in the wrong place, so alignment is set at fabrication rather than fudged on site. Soft-close hinge price and repair covers the tiers in detail.
Ask for the frame series and section thickness, the infill panel type (aluminium composite, honeycomb, glass or coated board), the coating type and colour, the door grade and glass thickness where glass is used, the hinge tier and the number of hinges per door, whether soft-close and dampeners are included, the plinth material, and the base, wall and tall feet counted separately. Then ask what is excluded — countertop, sink, tap, appliances, electrical and plumbing works are normally outside the cabinet rate. A quote that says only “aluminium kitchen cabinet, RM x per foot” is not comparable with anything. The full checklist, including the deposit red flags, is in hidden charges in a kitchen cabinet quote.
ClickBina builds aluminium and timber-based kitchen cabinetry across Kuala Lumpur and Selangor, and we will tell you honestly which one your kitchen needs — aluminium in the wet zone where it removes the swelling problem for good, laminate or acrylic in the dry kitchen where the money buys appearance instead. We measure on site, quote per foot with base, wall and tall runs itemised, state the frame, panel, coating and hardware tier on the quote, and sequence the cabinetry with the tiling, plumbing and electrical so the kitchen is finished by one team. Send us your kitchen dimensions on WhatsApp for a fixed per-foot quote. Bahasa Malaysia readers can use the twin guide, kabinet dapur aluminium.
WhatsApp us your job details for a free quote — we'll reply as soon as we can.
💬 Get a Free QuoteHow we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Tell us what you need — we'll reply as soon as we can.