What yard cabinetry costs per foot run, which carcass materials actually survive a Malaysian service yard, and how to size a run around a washer and dryer.
📍 We serve KL, Selangor & Putrajaya.

Yard cabinets are priced per foot run, the same way kitchen cabinets are, but off a different set of materials. Here is the working band, with the underlying carcass rates it is built from (market estimate 2026, indicative Klang Valley):
| Cabinet build | Price per foot run (2026, Klang Valley) | Best suited to |
|---|---|---|
| Laundry / yard cabinet, wet zone | RM350 – RM700 per ft run | MR plywood or full aluminium; ordinary board fails here |
| Moisture-resistant (MR) plywood carcass, laminate door | RM350 – RM600 per ft run | the sensible floor for a covered yard |
| Full aluminium (3G / 4G frame, powder-coated) | RM400 – RM700 per ft run | fully waterproof and termite-proof; the honest ceiling for an exposed yard |
| Solid-surface or PVC-wrapped door | RM500 – RM900 per ft run | PVC-wrapped or solid-surface doors on a waterproof carcass |
| Stainless steel cabinet | RM650 – RM1,000 per ft run | heavy use, semi-outdoor, or where a commercial finish is wanted |
| Upgrade carcass to MR plywood | RM30 – RM60 per ft run | only relevant if someone has quoted you a dry-kitchen carcass |
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteThe first row is the number to plan with. The rows under it show where it comes from: the bottom of the band is a moisture-resistant plywood carcass with a laminate face, the top is a full aluminium build. Melamine on a particleboard core is deliberately absent from that range. It is the cheapest cabinet in Malaysia and it is genuinely fine in a dry kitchen or a bedroom, but in a yard it is a false economy: the core is compressed wood chip, and once water gets past the edge banding it swells, loses its grip on the screws and never recovers. Pricing a yard run off a melamine rate produces a quote you cannot deliver against.
Two things are quoted separately and should be itemised in any quote you accept: the worktop (see the worktop section below) and any plumbing or electrical alterations. Moving a floor trap, adding a tap point or running a new socket is a different trade and belongs on its own line.
A Malaysian service yard combines four things that no dry-kitchen cabinet was designed for, and they act together rather than one at a time:
The failure sequence is nearly always the same, and it starts at an edge rather than a face. Water finds an unsealed edge — a cut-out, a screw hole, the bottom rail sitting on a wet floor — wicks into the core, and the panel swells. Once it swells, the door stops closing flush, the hinge screws lose their bite, and the swelling opens the joint further. Our cabinet water damage and swelling guide covers what can and cannot be repaired once that has started, and the honest answer is usually that a swollen particleboard panel is replaced rather than repaired.
The same logic applies to the room, not just the furniture. If the yard floor is not properly falling to the trap, or the wall behind is holding damp from an adjacent bathroom, new cabinets will fail on a schedule no matter what they are made of. Wet kitchen and yard floor waterproofing covers the floor build-up, and why waterproofing fails covers the reasons a yard stays wet after it has supposedly been treated. Sort the room out first; cabinets go in last.
The useful way to think about a yard cabinet is as three separate decisions, because they fail differently:
1. The carcass — the boxes. This is the decision that decides the lifespan, and it is the one most often downgraded quietly in a cheap quote. It has to tolerate humidity indefinitely and survive an occasional soaking.
2. The doors and drawer fronts — what gets splashed, handled and sun-warmed. These can be a different material from the carcass, and often should be.
3. The edges and the base — where water actually gets in. Every exposed board edge needs banding that holds under sustained moisture, and the base of the run should not sit directly on a floor that is regularly wet. A raised plinth, adjustable feet, or a wall-hung run that leaves the floor clear are all better than a carcass standing in water. On banding, PUR adhesive is the relevant upgrade: PUR gives very high resistance to moisture, water and water vapour, and is particularly suitable for use in damp conditions. It is resistant, not waterproof. Our edge banding guide explains the difference and what to write into a quote.
One more decision that saves money later: leave the plumbing accessible. A cabinet built as a sealed box around a stop valve or a trap has to be cut open the first time something leaks. Removable back panels or a service gap cost nothing at build time.
| Carcass material | How it behaves in a yard | Verdict |
|---|---|---|
| Full aluminium (powder-coated frame) | Does not absorb water at all; will not swell, rot or feed termites; unaffected by humidity | The strongest answer for an exposed or semi-outdoor yard. Dents, conducts heat, and needs dampeners on doors. |
| Stainless steel | Waterproof and very durable; handles heat and heavy use | Excellent, and the usual choice where the yard doubles as a heavy wet kitchen. Shows fingerprints and water spots. |
| Moisture-resistant (MR) plywood | Glue lines resist damp; behaves well if every edge and cut-out is sealed and banded | The best value in a covered yard. Its performance is entirely dependent on build quality — unsealed edges undo it. |
| Rigid PVC / WPC board | Zero water absorption; will not swell or rot; light to handle | Very good for the wet zone. Softer than plywood, so hardware fixings and shelf spans need attention. |
| Standard particleboard with melamine facing | Core swells as soon as water passes the edge banding, and does not recover | Avoid. Cheapest per foot and the most expensive over five years. |
| Ordinary MDF | Absorbs moisture readily; edges soften and the face lifts | Avoid in a yard, even with a good finish on the face. |
A common and sensible compromise in a covered yard is an aluminium or PVC carcass at floor level, where the water is, with plywood-and-laminate wall units above where it is only humid. You get the durability where it is needed and pay the lower rate for the rest of the run. Our aluminium cabinet guide and plywood cabinet guide go into each build in detail, and stainless vs aluminium compares the two metal options directly.
Getting the machine opening wrong is the single most common yard-cabinet failure, and it is entirely avoidable. Across makers the width and height are stable at roughly 597–600 mm W and 847–850 mm H; depth is the variable, running about 400–660 mm by capacity.
| Appliance | Published dimensions (H × W × D) | Net weight |
|---|---|---|
| Front-load washer, Malaysian model (Bosch WAJ20180SG, 8 kg) | 848 × 598 × 590 mm | 66.7 kg |
| Heat-pump dryer, Malaysian model (Bosch WTW87561GB, 9 kg) | 842 × 598 × 599 mm | 54.2 kg |
| Across makers, by capacity | Height 847–850, width 597–600, depth about 400–660 mm | — |
| Slim models | From about 47 cm deep (maker’s category claim, not a model spec sheet) | — |
Notice that the Malaysian-market washer and dryer above are within about 10 mm of each other on every axis. That is not a coincidence — matched footprints are why a same-maker pair lines up in a stack or side by side. Mixing brands is where openings stop working.
The depth figure that catches people out is the door, not the carcase. On one manufacturer’s published installation drawing (a US model), 64 cm deep closed becomes 105.4 cm with the door open 90 degrees, and needs 33 cm side clearance at 160 degrees. For the Malaysian market the equivalent published guidance is Samsung Malaysia’s: allow at least 550 mm in front of the machine for the doors. If the machine sits in a niche with a wall or a door swing in front of it, measure that clearance before the cabinet is built.
Installation clearances are the other half of the sizing. Makers genuinely disagree here, so the honest presentation is the spread rather than a single number: Installation clearances differ by maker — rear 50–100 mm, sides 15–50 mm, top 25–160 mm. Samsung Malaysia: 50 mm rear, 25 mm sides. Bosch: 64 mm rear, 15 mm sides, 160 mm top, 61 mm front. LG: 100 mm rear, 20–50 mm sides.
| Maker | Rear | Sides | Top | Front |
|---|---|---|---|---|
| Samsung Malaysia | 50 mm | 25 mm each side | — | at least 550 mm for the door |
| Bosch | 64 mm | 15 mm each side | 160 mm | 61 mm |
| LG | 100 mm | 20–50 mm | — | — |
Build the opening to the most generous of those, not the tightest. The rear gap is not wasted space — it is where the hoses and the connections live, and a machine pushed hard against a wall kinks its own drain hose.
Stacking: the safety point on this page. If you are stacking a dryer over a washer inside a cabinet run, three manufacturer statements matter and none of them should be softened:
One thing we could not find, and will not invent: no manufacturer publishes a maximum weight for the machine underneath a stack. The rating is expressed as “use the approved kit for this named pair”, not as a kilogram figure. If a contractor offers you a bracket or a timber frame instead of the maker’s kit, that is not an equivalent, and no cabinet carcass should be carrying a dryer either.
Cabinetry and plumbing are decided together in a yard or they fight each other for the life of the room. What to settle before fabrication:
Mould in a yard cabinet is a symptom, and the cause is almost always trapped moist air rather than a leak. A closed cabinet in a humid yard with a damp cloth or a bag of laundry inside it becomes the wettest, stillest place in the house.
If mould is already established, cleaning the cabinet is treating the symptom. Mould remediation and wall damp and mould treatment cover finding the moisture source, which is the only fix that holds.
A worktop over a front-load washer is genuinely useful — it is where laundry gets sorted and folded — but it takes standing water, detergent, sun and vibration, so the material choice is not the same as a dry kitchen’s. Priced per foot run, supplied and installed (market estimate 2026, indicative Klang Valley):
| Worktop material | Price per foot run (2026, Klang Valley) | Notes |
|---|---|---|
| Concrete / rendered top (table top konkrit) | RM80 – RM180 per ft run | the traditional Malaysian wet-yard answer; tiled or rendered on site |
| Solid surface | RM150 – RM350 per ft run | seamless and repairable; check the maker’s outdoor guidance if the yard is exposed |
| Granite | RM200 – RM500 per ft run | needs sealing yearly |
| Quartz (engineered stone) | RM250 – RM600 per ft run | hard and stain-resistant; mid-grade around RM380 per ft |
| Sintered stone | RM400 – RM900 per ft run | heat-proof, marble look |
Three practical notes. First, laminate tops do not belong over a washer — the join around any cut-out is exactly where water gets in, and the substrate underneath is usually board. Second, if the yard gets direct sun, ask the supplier about colour stability before you choose; some engineered materials are specified for indoor use. Third, do not let the worktop rest on the machine. It must be carried by the carcass or by its own supports, with a clearance gap above the appliance, or the machine transmits spin vibration straight into the top and, in time, into the joints. Our countertop guide compares the same materials in more depth.
A typical Klang Valley terrace-house yard: a 6-foot run of base cabinets along one wall, a washer bay in the middle, a worktop over the whole length and two wall units above. Working from the rates in the first table (market estimate 2026, indicative Klang Valley):
| Line | Basis | Subtotal |
|---|---|---|
| Yard cabinetry, 6 ft run | 6 ft × RM350 – RM700 per ft | RM2,100 – RM4,200 |
| Worktop, 6 ft, solid surface | 6 ft × RM150 – RM350 per ft | RM900 – RM2,100 |
| Cabinets and worktop | RM3,000 – RM6,300 | |
| Alternative worktop: rendered concrete | 6 ft × RM80 – RM180 per ft | RM480 – RM1,080 |
| Alternative worktop: granite | 6 ft × RM200 – RM500 per ft | RM1,200 – RM3,000 |
| Plumbing or electrical alterations | Separate trade | Quoted separately |
So a 6-foot yard run lands roughly between RM3,000 and RM6,300 for cabinets plus a solid-surface top, before any plumbing changes. The spread is genuinely that wide, and it is not padding: the bottom is an MR-plywood carcass in a covered yard with a modest top, the ceiling is a full aluminium build with a premium worktop in a yard that is half open to the weather. Swapping to a rendered concrete top brings the total down; granite pushes it up.
The washer bay itself does not add cabinetry cost — it removes a cabinet — but it does add design constraint. Size the opening off the published depth band above plus the maker’s rear clearance, not off a tape measure held against the machine you own today, because the next machine will not be identical.
Hardware is where a yard run quietly fails even when the boxes are right, because plated steel in a permanently humid, occasionally salty environment corrodes on a schedule.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteHow we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Tell us what you need — we reply within the hour.