The complete Klang Valley price guide to renovating a condo or apartment — cost by size and scope, a full component breakdown, material choices, management rules and the hidden costs most quotes leave out.

Indicative Klang Valley ranges — Get Your Free Quote.
Renovating a condo in Kuala Lumpur or Selangor is a different exercise from a landed house. You are working inside a strata building, so the management corporation (MC) or joint management body (JMB) sets binding rules on hacking, wet works, working hours, debris disposal and deposits. Those rules — not just your design taste — shape both your budget and your timeline. Older buildings add another layer: ageing wiring, concealed plumbing and slab thickness limits all influence what is possible and what it costs.
This guide gives you the real ranges we quote across the Klang Valley, a line-by-line breakdown of where the money goes, the material decisions that swing the total by tens of thousands of ringgit, and the strata-specific costs that catch first-time condo owners off guard.
The single biggest driver is floor area, followed by how much of the unit you touch. Use this as your starting anchor, then adjust for scope and finish:
| Unit size | Cosmetic refresh | Full mid-range | Premium |
|---|---|---|---|
| Studio / small (450–650 sq ft) | RM20k–40k | RM45k–75k | RM90k+ |
| 2-room (700–900 sq ft) | RM30k–55k | RM60k–100k | RM130k+ |
| 3-room (1,000–1,300 sq ft) | RM45k–75k | RM90k–150k | RM180k+ |
| Large / dual-key (1,400 sq ft+) | RM70k+ | RM150k–250k | RM300k+ |
Unsure whether your plans count as a cosmetic refresh or a full mid-range job? Send your job details for the kitchen and bathrooms and we reply within the hour with the tier that fits.
💬 Get Your Free QuoteCosmetic refresh = paint, flooring, light fixtures and minor repairs, keeping the existing kitchen and bathrooms. Full mid-range = new kitchen, bathrooms, built-in carpentry, ceiling and full repaint. Premium = designer materials, custom joinery, feature walls and an interior designer’s involvement.
A fast way to sanity-check any quote is cost per square foot of built-up area. See our dedicated renovation cost per sq ft guide for the full method.
| Scope | Indicative cost / sq ft |
|---|---|
| Light refresh (paint, flooring, minor) | RM50 – RM90 |
| Mid-range (kitchen, bathrooms, built-ins) | RM90 – RM150 |
| Premium / designer | RM150 – RM220+ |
Remember that wet areas (kitchen and bathrooms) cost far more per sq ft than bedrooms, so a small unit with two bathrooms will show a higher blended rate than its size alone suggests.
Here is where the money actually goes in a typical mid-range condo renovation, with what drives each line up or down:
| Trade / item | Indicative cost | What moves it |
|---|---|---|
| Hacking, disposal & protection | RM4,000–8,000 | How much you tear out; lift & debris rules |
| Kitchen cabinets + worktop | RM12,000–30,000 | Laminate vs quartz top; run length |
| Bathrooms (per bathroom) | RM8,000–15,000 | Tile grade, waterproofing, sanitaryware |
| Built-in wardrobes & TV console | RM8,000–22,000 | Feet run of carpentry, door type |
| Flooring (living + rooms) | RM8,000–18,000 | Tiles vs vinyl/SPC vs laminate |
| Plaster ceiling, cornice & cove lighting | RM6,000–14,000 | Area covered, design complexity |
| Electrical add-ons & rewiring | RM3,000–10,000 | Age of unit, number of new points |
| Full repaint | RM3,500–7,000 | Wall area, feature finishes |
| Air-cond supply & install | RM4,000–12,000 | Number of units, piping runs |
For trade-level detail see our kitchen, bathroom, carpentry, rewiring and painting cost guides.
A typical mid-range package covers the kitchen (cabinets, worktop, tiling, sink and tap), all bathrooms (waterproofing, tiling, sanitaryware and a glass screen), built-in carpentry (wardrobes, TV console, shoe cabinet), flooring throughout, a plaster ceiling with cove lighting and downlights, a full repaint, and electrical upgrades. Loose furniture, curtains, appliances and smart-home add-ons are usually quoted separately — always confirm the inclusion list in writing.
Many condo renovation offers in Malaysia are sold as a package: one price for a unit size and finish level. A package can be good value, but only if you can see what is inside it. Check the price against the size table above first. A full mid-range job runs roughly RM45k–75k for a studio, RM60k–100k for a 2-room unit and RM90k–150k for a 3-room unit. A package far below that band has usually dropped something.
Before you sign, ask for the package broken down into the same trade lines as the cost breakdown:
Loose furniture, curtains, appliances and smart-home add-ons are usually outside a package, so get the exclusions in writing too. For design-led bundles, see interior design packages.
The same layout can cost RM60k or RM120k depending on finishes. These are the decisions with the biggest impact:
| Choice | Budget option | Premium option |
|---|---|---|
| Kitchen worktop | Laminate / solid surface | Quartz / sintered stone |
| Cabinet carcass | Moisture-resistant plywood | Marine ply + soft-close everywhere |
| Flooring | SPC / vinyl click | Large-format porcelain tile |
| Bathroom tiles | Local ceramic | Imported porcelain / feature wall |
| Wardrobe doors | Laminate swing doors | Sliding mirror / glass profile |
A practical rule: spend on the things you touch daily (kitchen worktop, tap, door handles, bathroom fittings) and save on what you do not (carcass interiors, store-room finishes).
Before any work starts, you or your contractor must submit a renovation application to the MC/JMB. Expect these conditions in most Klang Valley condos:
A good contractor handles this paperwork for you. For the legal background see strata renovation rules → and do you need council approval? →
| Item | Indicative cost |
|---|---|
| Hacking, disposal & protection | RM4,000–7,000 |
| Kitchen (cabinets + top + tiling) | RM18,000–30,000 |
| 2 bathrooms (waterproof + tile + fittings) | RM16,000–28,000 |
| Built-in wardrobes & TV console | RM12,000–22,000 |
| Flooring (living + rooms) | RM10,000–18,000 |
| Ceiling, cornice & lighting | RM8,000–14,000 |
| Electrical add-ons | RM4,000–8,000 |
| Full repaint | RM4,000–7,000 |
| Typical total | RM76,000–134,000 |
This excludes loose furniture, curtains and appliances. Add roughly RM15,000–40,000 if you are furnishing from scratch.
These are the items that turn a RM90k quote into a RM105k final bill if you do not plan for them:
If cash flow is tight, split the work into phases that do not require re-hacking later:
| Scope | Typical duration |
|---|---|
| Cosmetic refresh | 3–5 weeks |
| Full mid-range | 6–10 weeks |
| Premium / layout change | 10–14 weeks |
Management-imposed working hours are the biggest variable — a building that only allows 9am–5pm weekday work will run longer than one with relaxed hours.
ClickBina renovates condos across the Klang Valley — Mont Kiara, Petaling Jaya, Cheras and beyond. We handle the MC paperwork, waterproofing warranty and full fit-out. Send us your floor plan for an itemised quote.
Two owners with the same layout can get quotes tens of thousands of ringgit apart. These are the things that decide where yours lands:
WhatsApp your floor plan, the unit size, the age of the building and photos of the kitchen and each bathroom for a free quote.
Have your MC's renovation rules to hand? WhatsApp them with your floor plan so the quote and timeline allow for the building's working hours and debris rules.
💬 Get a Free QuoteHow we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Renovating before you move in, or phasing the work around a tight budget? Tell us which and send the unit size.