Post-tenancy, move-out and unit deep-cleaning prices by home size — Klang Valley.

Indicative Klang Valley ranges — Get Your Free Quote.
| Home size | Team & time | Indicative cost |
|---|---|---|
| Studio / 1-bedroom (500–700 sq ft) | 2 cleaners, 3–4 hrs | RM250 – RM400 |
| 2-bedroom condo (700–900 sq ft) | 2–3 cleaners, 4–5 hrs | RM350 – RM550 |
| 3-bedroom condo (900–1,300 sq ft) | 2–3 cleaners, 4–6 hrs | RM400 – RM650 |
| Terrace house (1,300–1,800 sq ft) | 3 cleaners, 5–7 hrs | RM600 – RM900 |
| Semi-D / bungalow (2,000+ sq ft) | 4–5 cleaners, full day | RM900+ |
Not sure whether your unit counts as a standard or a post-tenancy clean? Send your job details for the kitchen and bathrooms — the grease and limescale in them usually decide it.
💬 Get Your Free QuoteMost quotes for a full house deep clean are priced per home, not per hour, and the floor area is what places you on a row of the table above. A 1,500 sq ft home sits inside the terrace-house band (1,300–1,800 sq ft), so it typically costs RM600 – RM900 with 3 cleaners over 5–7 hours. Below that, a 900–1,300 sq ft 3-bedroom condo runs RM400 – RM650; above 2,000 sq ft, a semi-D or bungalow starts from RM900 and takes a full day.
Two things move a whole-house price beyond floor area: the number of bathrooms (roughly RM50–RM100 for each extra one) and whether the home has just been renovated, which adds 20–40%. Seasonal deep cleans before Hari Raya, Chinese New Year or Deepavali follow the same table, but urgent same-day or weekend slots may carry a small surcharge, so book a weekday early. WhatsApp us your floor area, bedroom and bathroom count for a quote.
| Aspect | Regular clean | Deep clean |
|---|---|---|
| Frequency | Weekly or bi-weekly | Once a year, or between tenancies |
| Surfaces cleaned | Visible tops, floors, bathrooms | Behind appliances, inside cabinets, grout lines |
| Appliances | Wipe exterior only | Inside fridge, oven, microwave |
| Duration | 1–2 hours | 3–8 hours depending on size |
| Team size | 1 cleaner | 2–5 cleaners |
| Indicative cost | RM80–RM180 | RM250–RM900+ |
A professional deep clean covers areas that regular cleaning misses entirely:
Regular cleaning only covers visible surfaces; a deep clean reaches the grime that accumulates over months — ideal between tenancies or before a home sale.
Post-tenancy deep cleans get a vacant unit back to market standard and are priced slightly higher than a standard deep clean because the grime is usually more severe — cooking residue, limescale, mould and accumulated dust from months or years of occupancy. Key scenarios:
| Add-on | What’s done | Indicative cost |
|---|---|---|
| Aircon cover & filter clean | Remove cover, wash filter, wipe coil | RM40–RM80 / unit |
| Carpet/rug shampooing | Hot-water extraction, stain treatment | RM1.50–RM3 / sq ft |
| Sofa / upholstery cleaning | Steam or dry extraction, deodorising | RM150–RM400 |
| Oven deep clean | Full interior degrease, racks soaked | RM80–RM150 |
| Water tank / overhead tank clean | Drain, scrub, sanitise, refill | RM200–RM400 |
Those five factors are what place your home on the right row of the table, from RM250 – RM400 for a studio up to RM600 – RM900 for a terrace house. WhatsApp us the number of bedrooms and bathrooms, whether the unit is furnished or empty, whether it has just been renovated, and two or three photos of the kitchen hob and the worst bathroom for a free quote.
Use this checklist to verify work has been completed before releasing deposit:
A 3-bedroom condo typically takes 4–6 hours with a team of 2–3 cleaners. A semi-D with 4+ bedrooms and 3+ bathrooms can take a full day. Post-renovation cleans run 30–50% longer due to fine dust infiltration. We provide an estimated completion time when you book.
The timeline varies based on the level of soiling and whether add-on services are included. For a move-in clean of a brand-new unit, expect 2–3 hours for a condo (minimal grime, just construction dust and developer handover cleaning); for a post-tenancy clean of a heavily used property, budget the full time estimates above or more. We can always extend the session if needed — just let us know upfront and we will bring a larger team.
Property managers can set up recurring packages (monthly, quarterly, or between tenancies) for multiple units, with a fixed per-unit price. This removes the hassle of getting quotes each time a unit turns over. ClickBina works with landlords across the Klang Valley — we coordinate access with outgoing tenants, document condition before and after with photos, and send you a report. Useful alongside our security deposit rules guide →.
A lightly used, furnished home can be deep cleaned by the owner over a weekend if you work room by room: empty and wipe the insides of kitchen cabinets and wardrobes, soak the cooker hood filters in hot soapy water, scrub grout lines with a stiff brush, and vacuum window tracks before wiping them.
Where doing it yourself stops being worth it:
Handing over a rental or moving into a new unit soon? WhatsApp the handover date and unit size — within the hour you will have a price and the number of cleaners we would send.
💬 Get a Free QuoteHow we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Need a deep clean, a post-renovation clean or recurring cleaning across several units? Tell us the property size for a free quote.