Pricing a new grille for the front door, the back door or the kitchen? Here are the per-sq-ft and per-door prices by material, which type suits which door, and what a proper quotation lists.
📍 We serve KL, Selangor & Putrajaya.

A grill door (grille door) in Malaysia costs RM100 – RM160 per sq ft for a mild steel sliding or back-door grille and RM120 – RM180 per sq ft for a main-door security gate, supplied and installed (indicative Klang Valley ranges for 2026). For a full-height 3 ft × 7 ft door (21 sq ft) that works out at RM2,100 – RM3,360 for a back or kitchen door and RM2,520 – RM3,780 for the front main door in mild steel. Aluminium costs more per sq ft, and stainless steel (SS304) the most. Folding and mesh-infill grille doors are quoted after measuring. WhatsApp ClickBina photos of the door for a free quote.
A grille door is the metal gate fitted in front of, or instead of, a solid door. On most Klang Valley terrace houses there are two at the main entrance: the solid front door, and a grille door outside it that lets air and light in while the house stays locked. Back doors and kitchen doors usually get one too, because they face the back lane or the service yard. The same product is sold as a door grille, grill door, security gate or, in Malay, grill pintu or pintu pagar. They come in four common types:
This guide covers doors. For window grilles, balcony railings and whole-house packages, our metal grille cost guide has the full table. For the solid security door behind the grille, see the security door cost guide.
Ten grille door designs for Malaysian homes: swing, sliding, folding and mesh-infill doors in mild steel, aluminium and stainless steel, at terrace, semi-D and bungalow entrances, a kitchen back door and condo unit doors. Each card is an illustrative concept render; filter by type or home, tap an image to enlarge it, and open the details for where it suits, the finish, what to watch and the published rate where this page has one.
10 designs shown
Illustrative concept design · Sliding · Terrace
Slim grey vertical bars with a mid rail carrying the lock box close the full width of a terrace porch, with the timber double doors set back behind.
💬 WhatsApp us about this design
Security door costs →Illustrative concept design · Mesh infill · Terrace
A dark grey grille fully infilled with fine perforated steel mesh, its main leaf slid to one side of the doorway beside a fixed mesh side panel and transom.
💬 WhatsApp us about this design
Security door costs →Illustrative concept design · Sliding · Semi-D
Champagne-gold aluminium bars in a slim frame close a wide recessed entrance in front of dark timber double doors, running on a low threshold track.
💬 WhatsApp us about this design
Mild steel, aluminium or stainless →Illustrative concept design · Swing · Bungalow
A tall single leaf of slim brushed stainless steel bars with a wide centre stile and lever handle sits flush in the doorway in front of a walnut-toned door.
💬 WhatsApp us about this design
Mild steel, aluminium or stainless →Illustrative concept design · Folding · Terrace
Black folding trellis sections, with vertical bars and diagonal scissor straps, are drawn back to both sides of a very wide opening, clearing a white-framed glass door.
💬 WhatsApp us about this design
Trellis and retractable grille doors →Illustrative concept design · Swing · Condo
Plain light grey vertical bars with one mid rail close the recess in front of a white unit door, with a lock bracket on the edge, in an open-air condo corridor.
💬 WhatsApp us about this design
Strata renovation rules →Illustrative concept design · Swing · Semi-D
Two deep bronze leaves of vertical bars with two cross rails meet in the middle in front of light oak double doors, with fixed grille side panels either side.
💬 WhatsApp us about this design
Main gate designs →Illustrative concept design · Swing · Condo
A white two-leaf grille of slim vertical bars with a lock at the meeting stile closes a recessed service doorway in front of a pale panelled door.
💬 WhatsApp us about this design
Mild steel, aluminium or stainless →Illustrative concept design · Sliding · Terrace
Two charcoal-black sliding panels of plain vertical bars overlap across a wide recessed doorway on a floor track, with a lock at the meeting stile.
💬 WhatsApp us about this design
Treating rust on a grille →Illustrative concept design · Swing · Terrace
Two dark bottle-green leaves of vertical bars with one wide flat band at handle height close a recessed doorway right in front of a honey-toned timber door.
💬 WhatsApp us about this design
Main door designs →These are illustrative concept designs created to show the options. They are not completed ClickBina projects. Prices are the per sq ft rates published on this page, supplied and installed; folding, mesh-infill, double-leaf and porch-width grilles are quoted after measuring. We install grille doors across the Klang Valley. WhatsApp us your job details (which door, the opening size and the type you like) for a quote.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Grille doors are priced per square foot of the opening, by material. Door grilles cost more per square foot than window grilles, because they carry hinges or a track and a lock, and the frame has to take being opened and slammed every day. These are the published rates from our metal grille cost guide (indicative Klang Valley ranges for 2026, supplied and installed):
| Grille type (per sq ft) | Mild steel (powder-coated) | Aluminium | Stainless steel (SS304) |
|---|---|---|---|
| Sliding or back-door grille | RM100 – RM160 | RM150 – RM230 | RM200 – RM320 |
| Main door / security gate | RM120 – RM180 | RM180 – RM280 | RM250 – RM380 |
| Standard window grille, for comparison | RM80 – RM130 | RM130 – RM200 | RM180 – RM280 |
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteThe rate you are quoted will sit higher in the range for a heavier section, a decorative pattern, a wide or tall opening, or a door that needs extra fixing work. A plain straight-bar or diamond design sits at the bottom of the range.
Most people want the price for one door, not a rate. A standard full-height door opening on a terrace house is about 3 ft × 7 ft, or 21 sq ft. At the rates above, one grille door costs:
| Door (3 ft × 7 ft, 21 sq ft) | Mild steel | Aluminium |
|---|---|---|
| Front main door (full height) | RM2,520 – RM3,780 | RM3,780 – RM5,880 |
| Back door / kitchen door | RM2,100 – RM3,360 | RM3,150 – RM4,830 |
In the worked example in the same guide, a powder-coated mild steel sliding main-door security gate with a lock comes to RM2,800, and a swing back-door security gate with a lock comes to RM2,200. A wider opening, a double-leaf gate or a porch gate is priced on its own area. Measure the width and height of the opening and multiply by the rate to check a quote.
The right type depends on how wide the opening is, how much room there is in front of it and what you are protecting against:
| Type | Best for | Watch out for |
|---|---|---|
| Swing (hinged) | Back doors, kitchen doors and single front doors with space for the leaf to open | Needs clear space to swing; hinges must be fixed into concrete or a steel frame |
| Sliding | Wide front doors, porches and doors next to a wall with no swing space | The track collects dirt and rainwater, so keep it clean; the lock sits at the meeting edge |
| Folding (accordion) | Very wide openings and shop fronts that must open fully | More moving joints to wear; quoted after measuring, with no published rate on this site |
| Mesh-infill (swing or sliding) | Doors where a hand could reach through the bars to the lock or a window | Less airflow and view than open bars; also quoted after measuring |
If the aim is to keep mosquitoes out rather than intruders, you want an insect screen, which is a different, lighter product. See the mosquito net and insect screen guide.
Material is the biggest single driver of the price. Our metal grille guide sets out the trade-off:
For homes near the coast, such as Port Klang, Klang and Sepang, choose aluminium or stainless steel over mild steel. A mild steel door that faces the rain on a porch will need the most care.
A strong grille with a weak lock is a weak door. Door grilles cost more than window grilles mostly because of the opening mechanism and the lock. Our grille guide notes that an openable grille with a lock adds RM200 – RM600 per unit for the mechanism. What to check:
If you are adding a digital lock to the solid door behind the grille, the security door guide linked above covers digital lock prices. If an existing lock has failed, see lock replacement.
A grille door is also the way out in a fire. Many homes have the front grille, the back grille and every window grille locked at night, with the keys in a drawer somewhere. That is the arrangement that traps people. A few simple rules:
For window grilles, make sure at least one window in each bedroom has an openable panel. Our invisible grille guide explains how cable grilles handle escape.
A grill door for a condo or apartment unit is priced the same way as on a landed house: by the area of the opening at the rates above. For a full-height 3 ft × 7 ft unit entrance in mild steel at the main-door security gate rate, that is RM2,520 – RM3,780; aluminium and stainless steel cost more. What differs in a condo is the approval.
In a strata building, what you fit outside your unit door affects the look of the building and the shared corridor. Our strata renovation rules guide lists changing external grille designs among the changes that need management approval. Before ordering a grille door for a condo or apartment:
Two quotes are only comparable if they describe the same door. Ask for each of these in writing:
| Line on the quote | Why it matters |
|---|---|
| Opening size and area in sq ft | The rate is per sq ft, so the area decides the total |
| Material and section size | Mild steel, aluminium or SS304, and how thick the frame and bars are |
| Type: swing, sliding, folding, single or double leaf | Each has different hardware and fixing work |
| Design | Plain bar and diamond sit at the base rate; ornamental work costs more |
| Finish and colour | Powder coat colour, and whether the steel is primed against rust first |
| Lock and hinges or track | Brand and type of lock, and how many keys are supplied |
| Fixing method | Into concrete, a steel frame or the door frame; never just plaster |
| Removing the old grille | Taking out an old gate and making good the holes is extra work |
Grille doors are handled and slammed every day and rained on at the porch, so they wear faster than window grilles. Check a mild steel door once a year, especially at the welds, the hinges and the bottom rail, and treat any rust spot straight away with a rust-inhibiting primer before it spreads. Oil hinges, tracks and locks. On a sliding door, keep the track clear of sand and leaves, and make sure rainwater can drain out of it.
If an existing grille door is rusty but still sound, repainting it can buy several years. If the welds or the bottom rail have rusted through, or the gate drops and drags, replacing it is usually the better money.
ClickBina fits grille doors, window grilles, invisible grilles and anti-climb fencing across the Klang Valley. We quote each door on its own line: area, material, type, design, lock and fixing. The price is flat, with no hidden charges. WhatsApp us your job details for the door for a free quote; a site visit is free. We reply within the hour. For the boundary, see the fencing cost guide, and to estimate grilles and fencing together, try the grille and fence cost calculator. This guide is also available in Bahasa Malaysia: harga grill pintu rumah.
How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Every grille rate on this page is quoted unchanged from our metal grille cost guide, so the two guides agree. Folding and mesh-infill grille doors have no published rate and are quoted after measuring.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteTell us what you need — we reply within the hour.