Browse 14 main door designs by style and home, then check the material, the security, the approval rules and the cost of each.
📍 We serve KL, Selangor & Putrajaya.

A main door design comes down to three choices: the material (solid or engineered timber, steel, wrought iron or a fire-rated door set), the layout (single leaf, double leaf, pivot, sidelights, or a grille door in front) and the exposure: a door under a deep porch can be timber, while a door in sun and rain needs a tougher material. In a condo the unit door is often a fire door, so the design follows the rules. Use the filters below to narrow the 14 concept designs by style or home type.
Each design below is an illustrative concept render, grouped by style and by the home it usually suits. Tap any image to enlarge it. Every card links to the ClickBina guide that explains the material, the lock or the cost behind that kind of door.
14 designs shown
Illustrative concept design · Tropical · Terrace
A honey-stained panelled solid timber door with a slim lever lock sits between two narrow glass sidelights under a terrace porch.
💬 WhatsApp us about this design
timber door refinishing →Illustrative concept design · Classic · Semi-D
A symmetrical pair of dark walnut raised-panel doors with long brass handles stands between cream porch columns.
💬 WhatsApp us about this design
hinges and door closers →Illustrative concept design · Modern · Terrace
A light oak door cut with closely spaced vertical grooves and a long black handle sits flush in a white wall.
💬 WhatsApp us about this design
main door materials compared →Illustrative concept design · Classic · Terrace
A timber double door with vertical grooves is flanked by black steel vertical-bar grille panels under a porch with two potted plants.
💬 WhatsApp us about this design
grille door prices →Illustrative concept design · Security-first · Condo
A plain charcoal steel door with a lever handle sits in a grey apartment corridor.
💬 WhatsApp us about this design
security door costs →Illustrative concept design · Security-first · Terrace
A steel door with a horizontal walnut woodgrain coating and a stainless lever lock sits in a grey rendered porch.
💬 WhatsApp us about this design
security door costs →Illustrative concept design · Classic · Bungalow
Tall black wrought iron double doors with scroll work over glass glow warmly at the top of stone steps between cream columns.
💬 WhatsApp us about this design
burglar-proofing a landed home →Illustrative concept design · Modern · Bungalow · Semi-D
A tall oak door turning on a pivot stands half open between narrow glass sidelights, over a polished concrete floor.
💬 WhatsApp us about this design
pivot doors →Illustrative concept design · Minimalist · Condo
A flush oak-veneer unit door in a grey frame opens onto a condo corridor, with a wall keypad beside it.
💬 WhatsApp us about this design
fire-rated doors →Illustrative concept design · Modern · Terrace
Seen from inside the foyer, a timber main door stands open beside a narrow frosted glass sidelight that lets daylight in.
💬 WhatsApp us about this design
door and glass types →Illustrative concept design · Classic · Terrace
A navy blue grooved panel door with a brass knob, letter plate and kick plate sits under a white porch between plants.
💬 WhatsApp us about this design
repainting timber doors →Illustrative concept design · Minimalist · Condo
A white flush door carries a slim matt black digital lock with a lever handle, beside a corridor leading to a window.
💬 WhatsApp us about this design
digital locks on security doors →Illustrative concept design · Security-first · Condo · Terrace
Folding diamond-lattice steel trellis panels stand beside a timber main door with a black lever lock at an apartment entrance.
💬 WhatsApp us about this design
trellis grille doors →Illustrative concept design · Minimalist · Terrace
A light grey moulded panel back door opens from a wet kitchen with a double sink to a narrow back yard.
💬 WhatsApp us about this design
main door materials →These are illustrative concept designs created to show style options. They are not completed ClickBina projects; your door is measured and quoted on its own opening, frame and building rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
A main door does more jobs than any other door in the house: it keeps out rain, heat and intruders, and it is the first thing visitors see. Start with how exposed the door is and what kind of home it belongs to, then pick the look.
Choose the lock with the door, not after it. A digital lock needs the right door thickness, and a fire door needs hardware that keeps its rating.
| Material | Look | Suits | Watch for |
|---|---|---|---|
| Solid timber | Warm grain, heavy feel | Sheltered entrances under a porch | Warps or cracks in sun and rain; needs refinishing |
| Engineered timber | Timber face, more stable core | Most homes wanting the timber look | Face veneer can lift if wet |
| Steel security door | Plain or woodgrain coated | Exposed and security-first homes | Heat in direct sun; rust where the coating chips |
| Wrought iron or stainless | Ornamental or patterned metal | Statement landed entrances | Custom fabrication, privacy behind the glass |
| Fire-rated door set | Flush, often veneered | Condo and apartment unit doors | Like-for-like only; management approval |
| WPC or fibreglass | Moulded panels | Back doors and wet areas | Lock and frame strength |
| Home | Usually works | Ask about |
|---|---|---|
| Intermediate terrace | Timber door with a grille in front, painted panel door | Grille price per sq ft, porch cover |
| Corner terrace or link house | Woodgrain steel door, timber with sidelights | Exposure to afternoon sun |
| Semi-D and bungalow | Double-leaf timber, pivot door, wrought iron | Hinges, floor pivot, weather seals |
| Condo or apartment | Fire-rated door set, digital lock, trellis outside | Management rules, rating of the set |
ClickBina's main door materials guide gives indicative Klang Valley ranges for 2026, door and installation: RM1,000 – RM3,500 to replace a solid timber main door, RM800 – RM1,500 for a basic non-branded steel security door, RM1,500 – RM3,000 for a mid-range powder-coated steel door, and RM3,000 – RM6,000+ for a premium wrought iron or stainless steel door. Frame repairs, new locks and making good around the door are priced on top.
A mild steel grille for the main door is RM120 – RM180 per sq ft supplied and installed, according to the grille door price guide, and adding a digital smart lock costs RM400 – RM2,500 extra. Pivot doors and fire-rated condo doors are quoted after the opening, the existing frame and the approval needed have been checked.
We supply and install main doors. WhatsApp us your job details for a quote: condo or landed, whether the door is sheltered, the rough size of the opening, the design you like from this page, and whether you also want a grille or a new lock. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges. A site visit is free.
About the images: every image on this page is an illustrative concept design generated to show a style option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026. Two guides give slightly different solid timber ranges for different scopes; this page uses the main door materials guide only.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.