Browse 13 kitchen looks for the back of a terrace house, where the kitchen meets the dining table and the wet kitchen sits behind, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

In most Malaysian terrace houses the kitchen sits at the back of a long, narrow ground floor, between two solid party walls, with light and air coming only from the back yard. That shapes the design: the dry kitchen faces the dining table, the wet kitchen sits behind it or in a rear extension, the cooker hood ducts out of the back wall, and in a double-storey house there is often a bathroom right above. These 13 concept designs show dry kitchens, dry-wet splits and storage ideas for that plan. Wet kitchen looks have their own gallery, linked below.
Each design below is an illustrative concept render of a kitchen at the back of a terrace house. Filter them by style, by dry-wet split or by storage. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look.
13 designs shown
Illustrative concept design · Japandi & Scandi · Terrace
A long galley of pale oak-look lower doors and white tall units leading to a round dining table at a big rear window, with a chimney hood over the hob.
💬 WhatsApp us about this design
kitchen layout types →Illustrative concept design · Modern · Terrace
A light grey galley kitchen ending in a black-framed frosted glass double door that leads to the wet kitchen, a black hood over the hob.
💬 WhatsApp us about this design
pocket doors →Illustrative concept design · Contemporary · Terrace
A dark green and white kitchen with a marble-look waterfall peninsula whose front is faced in old red brick, two black stools and a brick backsplash.
💬 WhatsApp us about this design
kitchen island and peninsula designs →Illustrative concept design · Modern · Terrace
A long run of grey handleless tall cabinets, one door open on oak shelves, facing a worktop with a sink, a narrow glazed slot at the far end.
💬 WhatsApp us about this design
pantry cabinet designs →Illustrative concept design · Japandi & Scandi · Terrace
A solid white staircase with light oak tall cupboards filling the whole triangle under it, the kitchen glimpsed at the right.
💬 WhatsApp us about this design
under-stair storage →Illustrative concept design · Contemporary · Terrace
A rectangular hatch opening between grey wall cabinets and an oak counter, with a white kitchen and a built-in oven visible through it.
💬 WhatsApp us about this design
dry and wet kitchen costs →Illustrative concept design · Classic · Terrace
A cream galley kitchen with a hob and hood, a full-height clear glass block panel beside an opening to a rear yard with a small dining set, warm sun.
💬 WhatsApp us about this design
glass block walls →Illustrative concept design · Industrial · Terrace
An open timber staircase on a black steel stringer with a wood counter and black stools beside it, a charcoal kitchen opposite and a glazed rear wall.
💬 WhatsApp us about this design
countertop designs →Illustrative concept design · Modern · Terrace
A narrow white galley under a sloping ceiling with a long roof light fitted with louvre blades, a door to a planted yard at the end.
💬 WhatsApp us about this design
kitchen ceiling designs →Illustrative concept design · Modern · Terrace
A narrow kitchen with a cove-lit lowered ceiling box, walnut tall and wall cabinets, a stone-look top and a glass door to a patio at the end.
💬 WhatsApp us about this design
kitchen ceiling designs →Illustrative concept design · Contemporary · Terrace
A sage green tall unit framing a stainless double-door fridge and a built-in oven, a white worktop in front and bright rear windows.
💬 WhatsApp us about this design
appliance cabinets →Illustrative concept design · Classic · Terrace
A pale blue galley kitchen with speckled stone-look tops, a white subway tile backsplash and a dining nook at the rear window.
💬 WhatsApp us about this design
cabinet door replacement →Illustrative concept design · Modern · Terrace
A white kitchen with a stainless chimney hood set in a white boxed chimney between open shelves, a grey tile backsplash and a glass door on the left.
💬 WhatsApp us about this design
hood and hob costs →These are illustrative concept designs created to show terrace kitchen options. They are not completed ClickBina projects. We renovate terrace kitchens and build kitchen cabinets, and your kitchen is assessed and quoted to its own walls, pipes and layout.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
A terrace kitchen is shaped by the house around it. The two long side walls are party walls with no windows, so daylight and air come from the back. The ground floor usually runs in one line from the living room to the dining table to the kitchen, so the dry kitchen is on show. The wet kitchen, where heavy cooking happens, sits behind it near the back door or in a rear extension.
| Layout | Fits | Light and air | Watch for |
|---|---|---|---|
| L-shape facing the table | Open ground floors | From the back, through the wet kitchen | Walkway to the back door |
| One run on the party wall | Narrow terraces | Weakest in the middle | Needs good ceiling lighting |
| Peninsula | Older houses with a half-wall | Good, the room stays open | Power and plumbing to the peninsula |
| Dry kitchen with a glass split | Heavy cooking households | Borrowed light through glass | Door type and track access |
| Kitchen in a rear extension | Houses that extended to the back | Roof light or louvres | Approval and drain rules |
| You mostly | Usually works | Hand-off |
|---|---|---|
| Cook light meals, eat at home | An open dry kitchen with a peninsula or bar | Dry kitchen only |
| Cook daily with a wok | A dry kitchen in front and a closed wet kitchen behind | Wet kitchen design gallery |
| Bake and store bulk | A tall pantry bank and an appliance tower | Pantry cabinet guide |
| Need more room | A rear extension for the wet kitchen | Rear kitchen extension guide |
This page covers the dry kitchen and the split between dry and wet. For the wet kitchen itself, see the wet kitchen design gallery. If you plan to build it out into the back yard, the rear kitchen extension guide for terrace houses covers the drain, setback and approval rules, and the dry and wet kitchen cost guide breaks down the budget. For the rest of the ground floor, see the terrace house interior design gallery.
ClickBina's kitchen design gallery quotes the kitchen renovation cost guide for a medium terrace or standard condo kitchen at RM20,000 – RM35,000. A basic glass partition to split dry from wet is RM8,000 – RM15,000 in the dry and wet kitchen cost guide.
For a lighter refresh, the cabinet door replacement guide prices a respray or reface of the cabinet doors only at RM800 – RM2,500 on a typical rental-unit refit, and the hood and hob cost guide adds RM200 – RM600 for ducting where a kitchen has never had a hood. These are indicative Klang Valley figures; your kitchen is quoted to its own size, finishes and plumbing.
We renovate terrace kitchens and build kitchen cabinets, from the dry kitchen in front to the split with the wet kitchen behind. WhatsApp us your job details for a quote: single or double storey, the size of the kitchen area, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a terrace kitchen option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.