Living & Dining Room Design Malaysia: 13 Open-Plan Ideas
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Design gallery

Living & Dining Room Design
13 Open-Plan Ideas for One Shared Hall

Browse 13 ways to split one open hall into a place to sit and a place to eat, without building a wall, then see what each idea involves.

📍 We serve KL, Selangor & Putrajaya.

Illustrative concept design: open living and dining hall with a grey sofa in front and a dining table under a recessed ceiling

In most Malaysian homes the living room and the dining area are one long open hall: the deep, narrow hall of a terrace house, or the L-shaped living-dining room of a condo. Good living and dining room design zones that one space without walls, so the sofa side feels relaxed and the table side feels like a place to eat. The tools are the ceiling and lighting above each zone, a change in floor, a low or see-through divider, where the sofa faces, and where the TV wall, the dining pendant and the air-conditioner go. These 13 concept designs show those choices in condos, terraces and semi-Ds. Use the filters below to narrow them by style, by type of idea or by home type.

More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.

How to zone one open hall into living and dining

Start with the walking route. In a terrace the route runs from the front door to the kitchen at the back; in a condo it runs from the front door to the balcony door. Keep that route clear first, then give the sofa side and the table side their own identity using the tools below. You need two or three of them, not all of them.

  • Ceiling. A recess, a cove or a change in ceiling shape above each zone tells the eye where one ends and the next begins.
  • Lighting. A pendant low over the table and softer cove or lamp light in the sitting area give each zone its own mood at night. Separate switches matter more than fancy fittings.
  • Floor. A rug under the sofa, or a change of tile at the dining end, marks the zone at foot level.
  • Dividers. A sofa back, a low sideboard, a half-height cabinet, slats or a glass screen create an edge without cutting off light and air.
  • Services. The TV wall, the pendant point and the air-conditioner position should suit both zones, not only the one you furnish first.

ClickBina's room dividers guide compares screens, shelves and glass in more detail, and the living room ceiling design gallery shows ceiling ideas for the sitting area on its own.

Ways to separate living and dining compared

MethodHow it separatesLight and airWatch for
Sofa back or rugFurniture marks the edgeFully openWalkway behind the sofa
Ceiling recess or cove per zoneChanges the ceiling above each zoneFully openBeam positions and table centre
Floor changeA different tile at the dining endFully openLevel finish at the change line
Low sideboard or half-height cabinetA solid edge at waist heightOpen aboveStable fixing; reach across
Timber slatsA see-through full-height edgeMostly openDust between slats
Glass partitionA clear or fluted full-height edgeLight passes, air does notFingerprints; slab fixing

Terrace hall and condo L-shape: two common layouts

A terrace hall is about as wide as the house and much longer than it is wide, with windows only at the front and party walls on both sides. The sofa and TV usually sit near the front door, where the light is, and the dining table sits deeper in, near the kitchen and often beside the staircase. The back half is the dark half, so it needs the stronger lighting plan, and a skylight or a light colour scheme helps. The terrace house living room gallery has more ideas for the sitting end.

Many condo units have an L-shaped living-dining room. The long leg beside the balcony door takes the sofa and TV, and the short leg near the kitchen takes the table. Because the building fixes the aircon points, power points and beams, plan the furniture around them. The condo living room gallery covers the sitting side of these units.

Quick pick: what to do first in your hall

Your hallDo firstLeave for later
Long, dark terrace hallLighting plan for the back half, a pendant over the tableFull-height dividers
Condo L-shapeRug and pendant per zone, TV placed for bothCeiling works that clash with beams
Hall where the TV must serve both zonesTV wall position and a ceiling recess over the sofaGlass partitions
Family that eats and works at the tableBright, even dining light and a bench with storageDisplay cabinets

Practical limits before you change the hall

  • Beams and slab. Ceiling recesses must work around the beams; in condos the slab and beams cannot be cut.
  • Wiring. A new pendant point, cove lighting and separate switches need proper new circuits, planned before the false ceiling goes up.
  • Aircon. One unit for a long hall must be sized for the whole space, and the pipe route to the outdoor unit limits where it can sit.
  • Strata rules. In a condo, check with management before major works, noisy hacking or changes near the balcony.
  • Stairs. A nook under the stair landing needs enough headroom; measure before you plan seating there.

What zoning a living and dining hall costs

ClickBina's false ceiling cost guide puts a cove ceiling with LED lighting at RM12 – RM18 per sq ft and a pendant light point at RM150 – RM350. The living room floor tiles guide puts tiling a living and dining area of about 350 sq ft at RM4,200 – RM10,500 (indicative Klang Valley ranges for 2026).

For dividers, the room dividers guide lists a half-height bookshelf divider at RM800 – RM3,000 and a full room divider or feature backdrop at RM2,500 – RM6,000. The display cabinet cost guide puts a custom glass-door display cabinet at RM500 – RM750 per foot run, and the aircon installation guide puts labour for a standard wall-mounted install at RM300 – RM700, with the unit priced separately. Built-in benches, slat screens and glass partitions are quoted per job.

How ClickBina can help

We renovate living and dining halls as part of our renovation work: we build false ceilings with coves and recesses, install lighting points, lay new floor tiles, and build sideboards, display cabinets, benches and slat screens to suit the zoning you choose. Air-conditioners, glass and loose furniture are priced as items. WhatsApp us your job details for a quote: your home type, the rough size and shape of the hall, where the beams and staircase are, and the ideas from this page you like. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina false ceiling cost guide — cove ceiling rate and pendant light point.
  • ClickBina living room floor tiles guide — tiling budget for a living and dining area.
  • ClickBina room dividers guide — half-height bookshelf divider and full room divider ranges.
  • ClickBina display cabinet cost guide — glass-door display cabinet rate per foot run.
  • ClickBina aircon installation cost guide — labour for a standard wall-mounted install.

About the images: every image on this page is an illustrative concept design generated to show a living and dining option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How do I separate the living and dining area without a wall?
Use two or three of these: a rug or sofa back, a different ceiling or light above each zone, a floor change at the dining end, and a low or see-through divider such as a sideboard, slats or glass. Keep the walking route clear first.
Where should the TV go in an open living-dining hall?
Usually on the wall the sofa faces, placed so it does not glare from the windows. If the family also watches from the table, place it where both the sofa and the dining chairs can see it.
Can one air-conditioner cool both the living and dining area?
Often yes, if the unit is sized for the whole hall and placed high on a short end wall so it blows along the length of the room. Ceiling fans over each zone help spread the air. The pipe route to the outdoor unit limits where it can go.
What flooring works for a combined living and dining room?
One tile through both zones keeps the hall feeling bigger; a change to a harder-wearing tile at the dining end marks the zone. ClickBina's floor tiles guide puts tiling a living and dining area of about 350 sq ft at RM4,200 – RM10,500 (indicative Klang Valley, 2026).
How much does a cove ceiling over each zone cost?
ClickBina's false ceiling cost guide puts a cove ceiling with LED lighting at RM12 – RM18 per sq ft (indicative Klang Valley, 2026). Wiring, the number of lights and the beams in your hall change the final price.
Is a glass partition a good living-dining divider?
It keeps the view and the light while giving a clear edge, but air does not pass through it, so check the aircon still reaches both sides. Fluted glass in the lower half adds privacy for the dining table.
Are the designs on this page real ClickBina projects?
No. They are illustrative concept designs that show living and dining options. Your hall is assessed and quoted to its own layout, beams, wiring and condition.

Get a Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides