Roof Design Malaysia: 12 House Roof Ideas & Roof Types
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Design gallery

Roof Design Ideas
House Roof Types & Materials in Malaysia

Browse 12 roof looks for existing houses and extensions, by material and home type, then see what changing each one involves.

📍 We serve KL, Selangor & Putrajaya.

Illustrative concept design: elevated view along a row of single-storey terrace houses with grey concrete tile roofs, gutters and downpipes on a sunny day

Roof design for most Malaysian houses is about the material and finish on the roof you already have: terracotta clay, charcoal concrete or lightweight metal tile on the main roof, metal longspan, IBR sheet or sandwich panel on extensions, and details such as deep eaves, a skylight or solar panels. Re-roofing in the same shape is usually treated as maintenance, but changing the roof line or pitch needs council approval, so these 12 concept designs show re-roof looks on common roof forms and extension roofs. Use the filters below to narrow them by style or home type.

More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.

How to choose a roof design for your house

Start from the roof you have. Most landed houses in Malaysia already have a hipped or gabled tile roof that was approved with the building, and most roof projects keep that shape and change the material, colour or details. Extensions are where new roof forms usually appear: a low single slope over a kitchen, a flat slab, or an insulated panel roof.

  • Clay or concrete tile if you want a cool, quiet main roof that matches the street.
  • Metal tile if the trusses are weak or you want a lighter roof with a tile look.
  • Longspan or IBR sheet for low-pitch extensions, where tiles cannot be used.
  • Standing seam for a clean contemporary look with hidden fixings.
  • Details such as deep eaves, a skylight or solar panels to change how the house looks and works without a new roof shape.

In a row of terrace houses the roof is shared visually with the neighbours, so a dramatic change of colour or material stands out; check any rules in your scheme before deciding.

Types of roof in Malaysia

Malaysian houses use a small set of roof types, described first by shape and then by what covers them:

  • Hipped roof — slopes on all four sides; a usual shape on housing-estate terraces and semi-Ds, covered in concrete or clay tile.
  • Gable roof — two slopes meeting at a ridge, with a triangular wall at each end; common on older homes and over side wings.
  • Single-slope roof — one low slope over a rear kitchen or other extension, in metal longspan, IBR sheet or sandwich panel, because tiles need a steeper roof.
  • Flat roof — a concrete slab with waterproofing, often hidden behind a parapet on modern box-style houses.

By covering, the main types of roof in Malaysia are clay tile, concrete tile, metal tile, metal longspan, IBR sheet, standing seam and the flat concrete slab; the table below compares them. For the tiles alone, see the roof tile types guide.

Roof materials compared

MaterialLookHeat and rain noiseWeightSuits
Clay tileWarm terracotta, ages wellCool, quietHeavyMain roofs of older homes
Concrete tileMany colours, coatedCool, quietHeavyMain roofs of estate homes
Metal tileTile profile in steelNeeds insulationLightWeak trusses, newer designs
Metal longspanSmooth wide ribsModerate with insulationLightExtensions, low pitch
IBR sheetCorrugated ribsNoisiestLightBack kitchens, utility
Standing seamClean vertical seamsNeeds insulationLightContemporary houses
Flat RC slabBoxy, hidden behind a parapetHot without insulationVery heavyModern box houses

Quick pick by home type

HomeUsually worksWatch for
Intermediate terraceRe-roof in matching tile; metal for the rear extensionNeighbour's roof joins and party walls
Corner terraceTile main roof, longspan or panel over a side extensionThe extra exposed side and gutters
Semi-DConcrete or metal tile, deep eaves, solar on the sunny slopeMatching the other half of the pair
BungalowClay tile, standing seam or a flat roof behind a parapetLarge areas of falls and drainage

Practical limits to check before you commit

  • Council approval. The renovation permit guide lists changing the building facade, roof line or roof pitch beyond the approved design as an external alteration that needs approval. ClickBina's re-roofing guidance treats replacing a roof with the same material and shape as maintenance, while changing the roof shape, adding a storey or extending the structure needs local authority approval.
  • Structure. Tile and metal are not a like-for-like swap: tiles are heavy, and on an old roof with weak trusses the structure should be checked first; see roof truss replacement.
  • Pitch. Low-pitch roofs need metal sheet or panels; tiles need a steeper roof to shed rain.
  • Terrace rows. Your roof joins your neighbours' roofs, so flashings and party walls need care.
  • Safety. Roof tiles break underfoot; roof work should only be done by people equipped to work at height.

What these roof designs cost

ClickBina's roof tile guide puts a clay or concrete tile re-roof at RM13,500 – RM25,500 all-in for a 1,500 sq ft roof (indicative Klang Valley ranges for 2026). The metal vs tile roof guide gives metal longspan at RM6 – RM12 per sq ft for material and RM3 – RM6 per sq ft labour, or RM13,500 – RM27,000 all-in for the same size of roof, and IBR corrugated sheet at RM4 – RM8 plus RM3 – RM5 per sq ft, or RM10,500 – RM19,500 all-in.

Metal tile systems, standing seam, flat roofs, skylights and solar work are quoted per job, because the system, the details and the structure below vary from house to house.

How ClickBina can help

We install, replace and repair house roofs; council rules for your house still apply, so check them before the work starts. WhatsApp us your job details for a quote: your house type, whether it is the main roof or an extension, the current roof material, and the look from this page you want. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges. A site visit is free.

Sources & methodology

  • ClickBina roof tile guide — clay and concrete tile re-roof figure and tile weight.
  • ClickBina metal vs tile roof guide — longspan and IBR material, labour and all-in figures.
  • ClickBina renovation permit guide and re-roofing cost guide (Malay edition) — when a roof change needs council approval.

About the images: every image on this page is an illustrative concept design generated to show a roof option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Clay, concrete or metal tile: which roof is right for my house?
Clay and concrete tiles give a cooler, quieter roof but are heavy. Metal tile is light and suits weaker trusses or newer designs, but needs insulation to keep heat and rain noise down.
Metal roof or tile roof: which is hotter and noisier?
Uninsulated metal is hotter and louder in heavy rain; IBR sheet is the noisiest. With insulation underneath, metal roofs become much more comfortable, which is why many owners keep tiles on the main roof and use metal only on extensions.
Can I change the shape of my roof?
Not without approval. Changing the roof line or roof pitch beyond the approved design is an external alteration that needs council approval. Replacing the roof with the same material and shape is usually treated as maintenance.
Will new tiles need new trusses?
Not always, but heavy tiles on an old roof with weak trusses should only go on after the structure is checked. Switching between tile and metal also changes the batten layout.
Why do extensions usually have metal roofs?
Extensions are often built with a low pitch to fit under upstairs windows, and a low pitch sheds rain only with metal sheet or panels. Tiles need a steeper roof.
Can I add solar panels to a tile roof?
Yes, panels are commonly mounted on tile roofs. Plan any re-roofing first, because re-roofing later means taking the panels down and putting them back.
Are the designs on this page real ClickBina projects?
No. They are illustrative concept designs that show roof options. Your roof is assessed and quoted to your own house, structure and council rules.
What are the types of roof in Malaysia?
By shape, most Malaysian houses have a hipped or gable roof, with single-slope roofs over extensions and flat concrete roofs on modern box-style houses. By covering, the common types are clay tile, concrete tile, metal tile, metal longspan, IBR sheet and standing seam.
How much does a new house roof cost in Malaysia?
ClickBina's roof tile guide puts a clay or concrete tile re-roof at RM13,500 – RM25,500 all-in for a 1,500 sq ft roof, and the metal vs tile roof guide puts metal longspan at RM13,500 – RM27,000 all-in for the same size of roof (indicative Klang Valley ranges for 2026). Metal tile systems, standing seam and flat roofs are quoted per job.

Get a Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides