Browse 14 facade looks for terrace, semi-D and bungalow fronts, by style and home type, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

For most Malaysian landed houses, a new exterior look comes from four layers on the facade you already have: the paint scheme, cladding such as timber-look slats, stone or aluminium composite panels, the window frames, and lighting. A repaint in a new colour is usually treated as cosmetic work, but changing the building facade beyond the approved design needs council approval, and in a gated or strata scheme the facade colour is normally controlled. These 14 concept designs show modern, minimalist, contemporary, tropical, monochrome, classic, industrial and retro fronts. Use the filters below to narrow them by style or home type.
Each design below is an illustrative concept render of a whole house front, grouped by style and by the home it usually suits. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the paint, cladding, window or lighting work behind that look.
14 designs shown
Illustrative concept design · Minimalist · Terrace
A white double-storey terrace house with a deep box frame around the upper floor, one long black-framed window, a recessed porch and a dark grey bar gate, between its neighbours.
💬 WhatsApp us about this design
the exterior repaint process →Illustrative concept design · Contemporary · Semi-D
A light grey double-storey semi-D with vertical timber-look slats screening a side window and the upper balcony, dark window frames and a grey bar gate.
💬 WhatsApp us about this design
exterior cladding options →Illustrative concept design · Monochrome · Terrace
A white double-storey house with a matt black box framing one upper window and balcony, black window frames, a black gate and white front walls.
💬 WhatsApp us about this design
choosing house colours →Illustrative concept design · Tropical · Bungalow
A single-storey white bungalow with a deep eave lined in timber-look boards, square white columns, black-framed glass doors and a stone-faced raised veranda on the lawn.
💬 WhatsApp us about this design
house roof designs →Illustrative concept design · Contemporary · Semi-D
A cream double-storey house on a sloping street with full-height natural stone columns, a stone-clad ground-floor wall and front wall, timber-framed windows and a slim bar gate.
💬 WhatsApp us about this design
stone wall cladding →Illustrative concept design · Modern · Bungalow
A white double-storey house with a deep charcoal-grey panelled frame wrapping the upper floor, a glass balcony, black-framed windows and matching grey panel front walls and gate.
💬 WhatsApp us about this design
ACP cladding →Illustrative concept design · Industrial · Terrace
A concrete-grey box-shaped double-storey front with two red brick panels flanking tall black-framed grid windows, black doors below and tropical planting.
💬 WhatsApp us about this design
exterior cladding options →Illustrative concept design · Classic · Semi-D · Bungalow
A cream double-storey house with white columns, arched windows and doorway, a balustraded balcony, a terracotta tile roof and a white bar gate under shady trees.
💬 WhatsApp us about this design
the exterior repaint process →Illustrative concept design · Repaint & refresh · Terrace
A single-storey terrace house painted sage green with white trims, pillars and wall mouldings, white-framed windows and a small white gate, between peach-painted neighbours.
💬 WhatsApp us about this design
choosing house colours →Illustrative concept design · Contemporary · Terrace · Semi-D
At dusk, warm downlights graze a full-height rough stone wall on a white double-storey house, with a lit porch, a timber front door and a low slatted front wall.
💬 WhatsApp us about this design
outdoor lighting →Illustrative concept design · Modern · Terrace
A white terrace row whose upper floors are screened by white perforated metal panels, above a grey ground floor with a glazed door and low hedges.
💬 WhatsApp us about this design
window designs →Illustrative concept design · Repaint & refresh · Terrace
A double-storey terrace house in dark slate grey and white, with black-framed windows, a glass balcony, a black garage door and open black bar gates.
💬 WhatsApp us about this design
window designs →Illustrative concept design · Minimalist · Semi-D · Bungalow
A close view of a white house entrance with a light timber-look front door, a timber-faced canopy, a tall black-framed window, gravel and grasses.
💬 WhatsApp us about this design
main door designs →Illustrative concept design · Mid-century & retro · Terrace
A yellow and cream terrace front with a white patterned breeze-block screen wall, teal shutters and doors, a white decorative balcony railing and a small pale gate.
💬 WhatsApp us about this design
when a front change needs approval →These are illustrative concept designs created to show facade options. They are not completed ClickBina projects. We repaint, clad and refit house fronts as part of our renovation work, and your house is assessed and quoted to its own walls, access and council or management rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start from what is already fixed. The shape of the house, the roof line and the boundary wall were approved with the building, and in a terrace row your front sits between two neighbours. Most exterior makeovers keep that shape and change what sits on it: the colours, a cladding feature, the window frames and the lighting. That is also where most of the visual change comes from.
Pick one idea to lead and let the rest stay quiet. A front with a stone base, a slat screen, two accent colours and a feature light all at once usually looks busy on a terrace frontage.
| Element | What it changes | Upkeep | Approval to check |
|---|---|---|---|
| Repaint, new colour | Whole mood of the front | Weatherproof paint lasts about 5–10 years outdoors | Usually cosmetic; strata or gated schemes may control colour |
| Timber-look slats | Adds warmth and shade | Washing; check fixings and gaps | Management in strata or gated schemes |
| Natural stone cladding | Solid, warm base | Low; reseal joints if needed | Management in strata or gated schemes |
| ACP panels | Crisp modern frames and boxes | Washing; sealant joints | Management; fire classification for taller buildings |
| New window frames | Sets the style line | Low | Management in strata or gated schemes |
| Facade lighting | Night-time look and safety | Weatherproof fittings | Wiring by a competent electrician |
| New screen wall, deeper eaves | Changes the building outline | Varies | Council approval for facade changes |
| Home | Usually works | Watch for |
|---|---|---|
| Intermediate terrace | Light main colour, one accent band, new window frames, a slat or perforated screen upstairs | Matching the row and the neighbours' party walls |
| Corner terrace | Two-tone blocks across the front and side wall, a stone or brick base | The extra exposed side wall in the afternoon sun |
| Semi-D | Stone base, timber-look slats on the upper floor, wall washers at night | Balancing with the other half of the pair |
| Bungalow | ACP frames, deep eaves, a full tropical or classic scheme | Large wall areas mean higher access and paint costs |
This gallery is about the house front itself. The pieces around it have their own galleries, so you can match them to the facade you choose: the main gate design gallery for gates and boundary walls, the house roof design gallery for roof materials and colours, the car porch design gallery for porch roofs, and the landscape design gallery for the front garden.
Plan them together. A charcoal gate, a charcoal window frame and a charcoal roof read as one design; three different dark colours from three different contractors usually do not.
Repainting is the part with published figures. ClickBina's exterior repaint guide puts an exterior repaint at RM2,000 – RM4,000 for a single-storey terrace, RM4,000 – RM8,000 for a double-storey terrace and RM6,000 – RM12,000 for a semi-D, with scaffold or rope access for upper floors adding RM800 – RM2,500 (indicative Klang Valley ranges for 2026). The same guide quotes elastomeric coating, used on walls that take driving rain, at RM4 – RM8 per sq ft.
Cladding, screens, new window frames and facade lighting are quoted per job, because the wall area, the fixing system, the access and the product vary from house to house. Ask for each item to be listed separately so you can phase the work: paint first, then a feature, then lighting.
We repaint, clad and refit house fronts as part of our renovation work; council and management rules for your house still apply, so check them before the work starts. WhatsApp us your job details for a quote: your house type, which walls you want to change, and the look from this page you like. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges. A site visit is free.
About the images: every image on this page is an illustrative concept design generated to show a facade option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.