Old House Makeover Design Malaysia: 12 Ideas
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Design gallery

Old House Makeover Design
12 Ideas for a 30 to 50-Year-Old House

Browse 12 makeover looks for an older terrace, semi-D or bungalow: what to restore, what to replace, and what each change involves.

📍 We serve KL, Selangor & Putrajaya.

Illustrative concept design: bright living room with a polished terrazzo floor, a cove-lit plaster ceiling, black-framed windows and a pale sofa

The best old house makeovers keep the original features that still work, such as terrazzo or parquet floors, breeze-block vents, solid timber doors and the stair, and replace what has worn out: the windows, the low old ceiling, the grilles, the paint and, out of sight, the wiring and pipes. ClickBina's old house renovation guide notes that a house that is 30 to 50 years old usually has several systems wearing out at once, so the hidden work comes before the finishes. These 12 concept designs show restored, updated and retro looks. Use the filters below to narrow them by style or home type.

More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.

Keep, restore or replace: how to update an old house

Start by walking the house and listing what is original and still sound. In a 1970s to 1990s Malaysian house that is often the terrazzo or parquet floors, the breeze-block vents, the solid timber doors and the concrete stair. These are expensive or impossible to buy new, and they are what make an old house feel different from a new one.

  • Restore the floors and the timber: terrazzo is ground and polished, parquet is sanded, doors are stripped and refinished.
  • Replace what has worn out: nako and old steel windows, low board ceilings, rusting grilles and tired paint.
  • Rebuild hidden the systems you cannot see: wiring, water pipes, waterproofing and the roof.
  • Add what the house never had: a rear extension, a cove light, or a wider opening between rooms.

A good makeover usually mixes one or two restored features with clean, plain new work around them. Too many retro pieces, or a fully modern fit-out that hides every original feature, both lose what the house had going for it.

What to keep and what to replace

Original featureKeep whenReplace whenGuide
Terrazzo floorSound, only dull or stainedBadly cracked or liftingterrazzo restoration
Timber parquetBlocks firm, no termitesLoose, rotten or termite-hitparquet sanding
Breeze-block ventsBlocks intact, you want the airflowRain and insects come in and the room has airconwindow replacement
Nako louvre windowsRarelyLeaking, rattling, hard to securenako replacement
Old board ceilingRarelyLow, stained or sagging; check for asbestos firstceiling designs
Concrete stairStructure soundCracked structure (engineer first)stair cladding

Quick pick by house type

HomeUsually worksWatch for
Old single-storey terracePolished terrazzo, new windows in the old rhythm, simple grilles, a fresh frontRear extension rules and the back lane
Old double-storey terraceTimber stair treads with glass, a new ceiling with cove light, a repainted frontParty walls and the neighbour's roof junctions
Old semi-DParquet bedrooms, mid-century living room, restored main doorMatching the other half of the pair outside
Old bungalowMosaic or terrazzo kept, large windows replaced, wiring redoneLarge areas mean higher floor and paint costs

Fix the hidden systems before the finishes

ClickBina's old house renovation guide sets the order: make it safe and dry, treat termites and cracks, replace wiring and pipes while the walls are open, waterproof, re-tile, then carpentry, paint and a final clean. A polished floor or a new ceiling that has to be opened again for a rewire is money spent twice.

  • Wiring: old cable without an earth or a modern breaker is common; a rewire is planned with the new ceiling.
  • Water pipes: the guide advises replacing galvanised iron pipes more than about 25 years old while the walls are open.
  • Roof and gutters: stop leaks before any new ceiling goes up.
  • Termites: inspect before restoring parquet, doors or timber stairs.

Checks before you change an old house

  • Asbestos. Older ceiling boards and roof sheets may contain asbestos; ClickBina's asbestos roof guide explains why it should not be cut, drilled or broken up by an untrained worker.
  • Walls between rooms. Some internal walls in old houses carry load. The hacking walls guide explains which walls can be hacked and when an engineer has to confirm first.
  • Extensions. A rear extension needs council approval and a structural design; check the drain reserve and back lane first.
  • Grilles and escape. When grilles are replaced, keep at least one opening on each floor that can be opened from inside.

What an old house makeover costs

ClickBina's old house renovation guide adds up a worked example for a double-storey terrace with two bathrooms, covering safety repairs, rewiring, re-piping, bathroom re-waterproofing, a full repaint and a deep clean, at RM38,800 – RM73,900, before new floors or a new kitchen. Within that, a full rewire is RM8,000 – RM15,000 for a single-storey terrace and RM12,000 – RM20,000 for a double-storey.

For the looks in this gallery, the linked guides quote: terrazzo restoration at RM8 – RM15 per sq ft for a grind-and-polish, rising to RM15 – RM35 per sq ft with patching and re-grouting; parquet sanding at RM4 – RM8 per sq ft; a plaster ceiling at RM8 – RM12 per sq ft flat or RM15 – RM25 per sq ft for a cove; solid timber stair treads at RM180 – RM450 each; a new powder-coated window grille at RM80 – RM130 per sq ft; an aluminium casement window at RM250 – RM600 per panel; a double-storey terrace repaint at RM4,000 – RM8,000; and a full rear extension at RM40,000 – RM120,000 (indicative Klang Valley ranges for 2026).

How ClickBina can help

We renovate older houses, and we restore floors, replace windows and grilles, build plaster ceilings and repaint as part of that work, with the wiring, pipes and waterproofing planned in the right order. WhatsApp us your job details for a quote: the house type and roughly how old it is, which original features you want to keep, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, we'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina old house renovation guide — the order of work, pipe age, rewiring ranges and the worked example.
  • ClickBina terrazzo restoration, parquet sanding, living room ceiling, staircase cladding, grille removal, nako window, exterior repaint and rear kitchen extension guides — every other RM figure.
  • ClickBina asbestos roof and hacking walls guides — asbestos handling and load-bearing walls.

About the images: every image on this page is an illustrative concept design generated to show a makeover option for an older house. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Should I keep my old terrazzo floor?
Usually, if it is sound. A grind-and-polish brings back the shine and keeps the floor height unchanged; ClickBina's terrazzo guide puts it at RM8 – RM15 per sq ft. Badly cracked or lifting floors need a fuller restoration or new tiles.
What should I fix first in an old house?
The hidden systems: roof leaks, wiring, termites, water pipes and waterproofing. Finishes such as polished floors, new ceilings and paint go on afterwards so they are not opened again.
Can I remove walls to open up an old house?
Some internal walls carry load. Have an engineer confirm which walls can go before any hacking, and plan the new opening with the wiring and ceiling work.
Is it worth replacing nako windows?
Usually yes: old louvres leak, rattle and are hard to secure. Aluminium casements that keep the old window rhythm suit the house; ClickBina's nako guide puts them at RM250 – RM600 per panel.
Are old ceiling boards dangerous?
Older fibre-cement boards may contain asbestos. Leave them intact and have them checked before anyone cuts, drills or removes them.
How much does it cost to make over an old terrace house?
ClickBina's old house renovation guide adds up RM38,800 – RM73,900 for safety repairs, rewiring, re-piping, bathroom re-waterproofing, a repaint and a clean on a double-storey terrace, before new floors or a new kitchen.
Are the designs on this page real ClickBina projects?
No. They are illustrative concept designs that show makeover options. Your house is assessed and quoted after a survey.

Get a Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides