Browse 12 bathroom looks built around what a condo gives you: no window, a fixed floor level, the building's pipes and the unit below.
📍 We serve KL, Selangor & Putrajaya.

A condo bathroom is usually small, often windowless, and sits on a slab shared with the unit below. The building's stack pipes run through it, the floor level is fixed by the door threshold and the drainage falls, and the management controls hacking and waterproofing work. The designs that suit it brighten a room with no daylight, keep the wet zone tight behind glass, and change the look with as little hacking as possible: tiles laid over tiles, a wall-hung WC, a niche in the pipe boxing, a better exhaust fan and a ceiling hatch so the pipes stay reachable. These 12 concept designs show modern, minimalist, warm, hotel-style and no-hack looks.
Each design below is an illustrative concept render of a condo bathroom, grouped by style. Tap any image to enlarge it, and open the details for what each idea suits, the finish and what to watch for. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Modern · Condo
A large backlit mirror over a white floating basin, glossy white tiles all round, a glass shower with a rain head and the toilet beside it.
💬 WhatsApp us about this design
bathroom mirror cabinets →Illustrative concept design · Minimalist · Condo
A compact beige-tiled bathroom with one fixed clear glass shower panel, a rain shower, the toilet and the edge of the vanity.
💬 WhatsApp us about this design
small bathroom layouts →Illustrative concept design · No-hack refresh · Condo
Pale stone-look tiles over walls and floor, a wall-hung white basin, a white toilet, a fixed glass shower panel and a mirror with a light strip.
💬 WhatsApp us about this design
bathroom makeover without hacking →Illustrative concept design · Modern · Condo
A white wall-hung toilet in front of a dark grey tiled cistern box with a white flush plate and a small plant on its ledge, glass shower to the left.
💬 WhatsApp us about this design
moving a toilet, sink or shower →Illustrative concept design · Minimalist · Condo
A shallow white vanity basin right beside the door, a round mirror above it, a curved quadrant glass shower and the toilet beyond.
💬 WhatsApp us about this design
bathroom basin types →Illustrative concept design · Modern · Condo
Looking up at a flat white ceiling with a square exhaust grille, round downlights and the top edge of a clear glass shower screen.
💬 WhatsApp us about this design
exhaust fan installation →Illustrative concept design · Warm & Japandi · Condo
A sandstone-look tiled shower behind a sliding glass door on a low tiled kerb, with a bench and a double wall niche, beside a stone-look vanity.
💬 WhatsApp us about this design
bathroom waterproofing →Illustrative concept design · Warm & Japandi · Condo
Wood-look plank tiles on the dry-area floor, a white basin top on an oak base under a backlit mirror, and a grey-tiled shower behind clear glass.
💬 WhatsApp us about this design
bathroom re-tiling →Illustrative concept design · Modern · Condo
A grey-tiled corner shower with an empty lit recessed niche in the wall, a shower tray and the toilet beside it.
💬 WhatsApp us about this design
bathroom design ideas →Illustrative concept design · Minimalist · Condo
A white floating vanity with a round vessel basin and a mirror set in the corridor outside the closed bathroom doors, on a light oak floor.
💬 WhatsApp us about this design
small bathroom layouts →Illustrative concept design · Hotel monochrome · Condo
White large-format tiles and a white vanity with matt black fittings: tap, rain shower, hand shower, towel rail and the slim black screen profile.
💬 WhatsApp us about this design
bathroom lighting →Illustrative concept design · Minimalist · Condo
A short corridor ending in a compact bathroom closed by a full-height clear glass door panel, with a wall-hung basin and a mirror inside.
💬 WhatsApp us about this design
bathroom door types →These are illustrative concept designs created to show bathroom options for condo units. They are not completed ClickBina projects. We renovate condo bathrooms in KL and Selangor, and your bathroom is assessed and quoted to its own size, pipes, waterproofing and your building's renovation rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with what the building fixes. The bathroom's position, the floor level and the drainage falls are set by the slab, the stack pipes and floor trap belong to the building's system, and anything that disturbs the waterproofing puts the unit below at risk. Most condo bathrooms also have no window, so light and air have to be designed in.
Then pick a look. In a small bathroom one wall tile and one floor tile, with fittings in one finish, usually look larger and calmer than several feature tiles.
| Change | What it solves | Approval and checks |
|---|---|---|
| Tile over existing tiles | New look without hacking the slab | Old tiles must be firmly bonded; no active leak |
| Full hack and new waterproofing | Leaks to the unit below, failed membrane | Management approval, working hours, deposit |
| Glass screen or panel | Keeps the dry area dry | Usually none |
| Wall-hung WC with cistern box | Easier cleaning, neater look | Toilet outlet must meet the building's pipe |
| Exhaust fan upgrade | Damp, mould, smells | Must vent to the building's duct or outside |
| Ceiling with an access hatch | Keeps the building's pipes reachable | Usually none; ask where the management needs access |
| Your bathroom | Usually works | Watch for |
|---|---|---|
| Dark, no window | Backlit mirror, glossy light tiles, IP-rated downlights | Wet-area power points |
| Old but not leaking | Tile-over-tile refresh with new fittings | Floor height at the door |
| Leaks to the unit below | Hack, new waterproofing and a full redo | Management approval and a flood test |
| Mould on the ceiling | Stronger exhaust fan and a moisture-resistant ceiling | Where the fan actually vents |
| Two people, one basin | Dry vanity outside the common bathroom | New pipe route in the corridor wall |
This gallery covers the condo bathroom as a whole. The detailed jobs have their own guides: small bathroom layouts for wet and dry separation, the bathroom makeover without hacking guide for overlays and fixture swaps, the bathroom waterproofing guide for when the membrane has failed, and the bathroom design gallery for more styles.
For light and air, see bathroom lighting for IP-rated fittings and exhaust fan installation for fan types and ducting.
ClickBina's no-hack makeover guide puts tiling over the existing substrate at RM12 – RM30 per sq ft, a new WC at RM350 – RM1,200 supplied and installed, a fixed glass shower panel at RM500 – RM900, a PVC ceiling at RM6 – RM15 per sq ft, and a non-hacking waterproofing package of sealer, regrouting and joint resealing at RM1,500 – RM3,500 per toilet. ClickBina's Kuala Lumpur bathroom guide puts a mid-range full renovation at RM12,000 – RM20,000 (indicative Klang Valley ranges for 2026).
Ask for the quote to separate the waterproofing, tiling, fittings, glass and ceiling, so you can see whether you are paying for a refresh or for a full hack-and-redo.
We renovate condo bathrooms in KL and Selangor, from tile-over-tile refreshes to full hack-and-redo jobs with new waterproofing, and we work to your building's rules and hours. WhatsApp us your job details for a quote: the building, the bathroom size, whether anything leaks and the look from this page you like. We'll reply as soon as we can with next steps, and the price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a condo bathroom option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.