Browse 12 living room looks for a terrace house, where the hall is long and narrow, lit from the front and shares its staircase with the room, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

A terrace living room is long, narrow and lit only from the front. The TV wall usually sits on a solid party wall, the staircase often rises inside the room, and the living area flows straight into the dining area and kitchen behind it. Good designs work with that: a TV wall on the party wall, the staircase treated as a feature, more light from the front, and zones that split one long room into living and dining. These 12 concept designs show terrace living rooms in modern, Japandi and contemporary styles.
Each design below is an illustrative concept render of a terrace house living room. Filter them by style, by light and space, or by staircase ideas. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Modern · Terrace
A dark walnut fluted TV wall with warm LED glow above and below, a floating walnut console and a sofa in the foreground.
💬 WhatsApp us about this design
fluted wall panels →Illustrative concept design · Contemporary · Terrace
A cream L-shaped sofa and a round black table beside a solid white staircase with black handrails, tall black-framed windows behind.
💬 WhatsApp us about this design
staircase renovation costs →Illustrative concept design · Japandi & Scandi · Terrace
A long low light oak floating cabinet along the base of an open timber staircase, plants and ceramics on top and a TV at the left.
💬 WhatsApp us about this design
under-stair storage →Illustrative concept design · Japandi & Scandi · Terrace
An oak bench with drawers and a long cushion tucked under a timber staircase, a brass wall lamp and a small shelf of books.
💬 WhatsApp us about this design
under-stair storage →Illustrative concept design · Light & space · Terrace
A narrow white living room ending in full-height black-framed glass doors with sheer curtains, a grey sofa and a TV on the solid side walls.
💬 WhatsApp us about this design
sliding door designs →Illustrative concept design · Contemporary · Terrace
Tall mirror panels alternating with white panels on a side wall, reflecting a beige sofa and a bright window.
💬 WhatsApp us about this design
wall mirror installation →Illustrative concept design · Modern · Terrace
A long cove-lit ceiling running from the front of the house past a white kitchen to a back garden, over glossy light tiles.
💬 WhatsApp us about this design
living room ceiling designs →Illustrative concept design · Japandi & Scandi · Terrace
A long room with a jute rug and sofa in front, drum pendants over a timber dining table behind and an oak TV wall at the left.
💬 WhatsApp us about this design
pendant light installation →Illustrative concept design · Japandi & Scandi · Terrace
A white bench with an oak top and soft cushions under tall windows with linen roller blinds, a black floor lamp beside it.
💬 WhatsApp us about this design
window seats and storage →Illustrative concept design · Modern · Terrace
A long room with grey large-format tiles running toward glass doors to a garden, a low grey sofa and a TV console.
💬 WhatsApp us about this design
living room floor tiles →Illustrative concept design · Light & space · Terrace
A minimal living room under a deep square skylight well, with a grey sofa, a rug, a low table and a white TV console.
💬 WhatsApp us about this design
skylight costs →Illustrative concept design · Contemporary · Terrace
An entrance with a floating walnut console, a round black-framed mirror and a white open shoe bench, the living area beyond.
💬 WhatsApp us about this design
entrance and shoe storage →These are illustrative concept designs created to show terrace living room options. They are not completed ClickBina projects. We design and renovate terrace living rooms, from TV walls and ceilings to floors and carpentry, and your room is assessed and quoted to its own size, walls and layout.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Most terrace living rooms share the same shape: a hall about as wide as the house, much longer than it is wide, with windows and doors only at the front. The side walls are solid party walls, the staircase often rises along one of them, and the room carries on into the dining area. The design question is how to make that long, dim shape feel calm and bright.
For the whole ground floor, from the front door to the kitchen, see the terrace house interior design gallery.
| Element | Usual place | Why | Watch for |
|---|---|---|---|
| TV and console | The long party wall | The only long solid wall | Damp or noise from next door |
| Sofa | Opposite the TV, back to the staircase or window | Faces the TV and the light | The walkway to the back |
| Staircase feature | Along one side wall | It is already there | Railing safety, headroom |
| Dining zone | Behind the living area | Close to the kitchen | Pendant point over the table |
| Entrance storage | Beside the front door | Shoes and keys stay at the door | Door swing |
| Problem | Start with | Hand-off |
|---|---|---|
| The room is dark | Glass doors to the porch, a mirror, a long cove ceiling | Sliding door designs |
| The room feels like a corridor | A rug and pendants to zone it, long tiles | Dining room designs |
| No storage | A low cabinet along the stair or a window bench | Under-stair storage guide |
| The staircase looks dated | A cosmetic staircase refresh | Staircase cost guide |
Each element has its own ClickBina guide. The TV cabinet design gallery shows consoles and wall units, the living room ceiling gallery shows cove and feature ceilings, and the living room design gallery covers living rooms in every type of home. If the staircase is in the wrong place altogether, the guide to adding or relocating a staircase explains what moving it involves.
ClickBina's TV feature wall cost guide puts a basic plywood and paint TV wall at RM3,000 – RM6,000 and a mid-range design with built-in cabinets and feature panels at RM8,000 – RM14,000. A cosmetic staircase refresh is RM5,000 – RM12,000 in the staircase renovation cost guide.
For ceilings, the living room ceiling guide lists a flat ceiling at RM8 – RM12 per sq ft and a perimeter cove at RM15 – RM25 per sq ft. Floors, glass doors and mirrors are quoted per job. These are indicative Klang Valley figures for 2026.
We design and renovate terrace living rooms, from TV walls, ceilings and staircases to floors and built-in carpentry. WhatsApp us your job details for a quote: the rough size of the hall, where the staircase sits, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a terrace living room option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.