Browse 12 window designs by style and home, then check how each opens, the frame, the practical limits and the price per panel.
📍 We serve KL, Selangor & Putrajaya.

A window design comes down to three choices: how it opens (casement, sliding, top-hung, louvre or fixed), the frame (aluminium, uPVC or timber, in white, silver, black or bronze) and the glass (clear, frosted, tinted or double glazed). Casements seal better against rain and noise, sliders save space, and fixed or high windows bring light where you do not need air. In a condo the outside face of the window is part of the building, so management approval comes first. Use the filters below to narrow the 12 concept designs by style or home type.
Each design below is an illustrative concept render, grouped by style and by the home it usually suits. Tap any image to enlarge it. Every card links to the ClickBina guide that explains the frame, the glass or the cost behind that kind of window.
12 designs shown
Illustrative concept design · Modern · Terrace
A white aluminium casement window with one sash swung open sits in a pale blue bedroom wall beside an upholstered headboard.
💬 WhatsApp us about this design
window replacement costs →Illustrative concept design · Modern · Condo
A white three-panel aluminium sliding window sits above a built-in oak desk, looking out at trees and apartment blocks.
💬 WhatsApp us about this design
window replacement costs →Illustrative concept design · Modern · Condo
Chunky white-framed casements, one sash open, fill a condo living-room window wall above a balcony railing.
💬 WhatsApp us about this design
aluminium or uPVC windows →Illustrative concept design · Classic · Semi-D
Four tall black-framed casements divided into small square panes by thin grid bars open above a railing in a bright room.
💬 WhatsApp us about this design
aluminium or uPVC windows →Illustrative concept design · Minimalist · Semi-D
Seen from below, a tall single fixed pane in a slim black frame fills part of a white stair-void wall with trees beyond.
💬 WhatsApp us about this design
door and window types →Illustrative concept design · Minimalist · Condo
A small white top-hung window opens outward from the top, high in a grey tiled bathroom wall.
💬 WhatsApp us about this design
door and window types →Illustrative concept design · Tropical · Terrace
A bronze-framed window wall mixes large fixed panes with a pair of open casements and a top-hung sash, looking onto a planted garden.
💬 WhatsApp us about this design
window replacement costs →Illustrative concept design · Minimalist · Terrace
White-framed windows filled with frosted glass glow softly above a bathtub with white wall tiles.
💬 WhatsApp us about this design
frosted film or frosted glass →Illustrative concept design · Minimalist · Semi-D
A band of high windows near the ceiling of a white double-height hall brings light down onto plain walls above a glass door to the garden.
💬 WhatsApp us about this design
lintels above doors and windows →Illustrative concept design · Heritage · Terrace
Two duck-egg blue timber casement windows with fixed fanlights above sit in a cream plaster facade.
💬 WhatsApp us about this design
kampung house renovation →Illustrative concept design · Tropical · Terrace
A white aluminium window over a kitchen sink has a fixed centre pane and two side sashes opened a little, with trees outside.
💬 WhatsApp us about this design
window replacement costs →Illustrative concept design · Classic · Terrace
Two casement sashes open below a fixed glass fanlight strip in a white frame, between sage green walls and tied-back curtains.
💬 WhatsApp us about this design
aluminium or uPVC windows →These are illustrative concept designs created to show style options. They are not completed ClickBina projects; your windows are measured and quoted on their own openings and building rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with what the window has to do in that room: let in air, keep out rain and noise, give privacy, or simply bring in light. The same opening can take very different windows depending on which job matters most.
Then choose the frame colour and the glass. Black and bronze frames suit modern and modern-classic homes; white suits almost everything. Frosted glass gives bathroom privacy, and a solar film helps a west-facing room.
| Type | How it opens | Suits | Watch for |
|---|---|---|---|
| Casement | Side-hinged sash swings out | Bedrooms, living rooms | Needs clear space outside; include a quick-release grille panel |
| Sliding | Sashes slide past each other | Where space is limited | Leaks more air and noise than a casement |
| Top-hung | Opens outward from the top | Bathrooms, laundries | Small opening, less air |
| Louvre (nako) | Glass blades tilt open | Kitchens, service areas | Less secure, less airtight |
| Fixed | Does not open | Views, stair voids, high positions | No ventilation; cleaning access |
| uPVC casement | Side-hinged with heavy seals | High-noise, high-rise units | Higher cost, limited colours |
| Room | Usually works | Ask about |
|---|---|---|
| Bedroom | Aluminium or uPVC casement, casement with a fanlight | Grille with a quick-release panel, noise |
| Living room | Fixed and casement window wall, black grid casements | Safety glass on large low panes |
| Kitchen | Sliding window or side-hung sashes over the sink, louvre replacement | Reach over the sink, rain |
| Bathroom | Top-hung or frosted window | Privacy, ventilation |
| Stair void or double-height hall | Fixed glass, high clerestory band | Cleaning access |
ClickBina's doors and windows guide gives indicative Klang Valley prices for 2026: RM250 – RM600 per panel for a standard-size aluminium casement window, RM200 – RM500 per panel for an aluminium sliding window, and RM500 – RM1,200 per panel for a uPVC casement window.
Louvre, fixed, top-hung, timber and tinted windows are quoted per job, because the size, the glass and the access vary so much. The window replacement cost guide explains what else goes on the quote, such as removing the old frame, making good the plaster and repainting.
We supply and install windows. WhatsApp us your job details for a quote: condo or landed, which rooms, the rough size and number of windows, the design you like from this page, and whether there are grilles. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges. A site visit is free.
About the images: every image on this page is an illustrative concept design generated to show a style option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026. No safety-glass height figure is given, because the source guide states two different thresholds.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.