Browse 12 living room looks for semi-Ds and bungalows, where the hall is wide, lit from more than one side and often rises into a double-volume void, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

A semi-D or bungalow living room is wide, lit from two or three sides and often open to a double-volume void with a gallery landing above. That brings different problems from a terrace: one room may need two sofa groups, the staircase is on show, and lighting, curtains, fans and aircon have to work at a height of two floors. Good designs give the hall a clear focal wall, zone it, and plan the void's lights and air before the ceiling is finished. These 12 concept designs show semi-D and bungalow living rooms in modern, contemporary, tropical and modern classic styles.
Each design below is an illustrative concept render of a semi-D or bungalow living room. Filter them by style, by double-volume void, or by semi-D or bungalow. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Modern · Semi-D · Bungalow
A grey concrete-look slab TV wall with a floating walnut console beside the staircase, garden glass doors at the right and a ceiling fan above.
💬 WhatsApp us about this design
TV feature wall costs →Illustrative concept design · Modern classic · Semi-D · Bungalow
A tiered crystal chandelier hanging in a double-height void ringed by a balustraded gallery, cream sofas and glass doors below.
💬 WhatsApp us about this design
chandelier and pendant installation →Illustrative concept design · Contemporary · Semi-D · Bungalow
An oak and white built-in wall with a TV, open bookshelves and a long desk with two chairs, a grey sofa in front.
💬 WhatsApp us about this design
built-in study desks →Illustrative concept design · Modern · Semi-D · Bungalow
A white double-height space seen from above, with a glass-balustraded landing bridge and a small sofa on the floor below.
💬 WhatsApp us about this design
glass railings →Illustrative concept design · Contemporary · Semi-D · Bungalow
A double-height hall with two sofas facing each other on a large rug, a white TV console, a gallery above and glass doors at the right.
💬 WhatsApp us about this design
living room designs →Illustrative concept design · Modern classic · Semi-D · Bungalow
Tall windows dressed with full-height sheer and linen curtains on a ceiling track behind a cream sofa.
💬 WhatsApp us about this design
curtain track installation →Illustrative concept design · Tropical · Semi-D · Bungalow
A double-height timber slat TV wall with warm light from the top and a white floating console, a gallery railing above and garden glass at the right.
💬 WhatsApp us about this design
fluted wall panels →Illustrative concept design · Modern · Bungalow
A terrazzo-floored living area with a sunken lounge and a cream curved built-in sofa around a round timber table, glass doors at the left.
💬 WhatsApp us about this design
semi-D and bungalow interiors →Illustrative concept design · Tropical · Semi-D · Bungalow
A low view up a double-height void with high louvred shutter windows, tall glazing and a black ceiling fan on a long downrod.
💬 WhatsApp us about this design
louvre window replacement →Illustrative concept design · Modern · Semi-D · Bungalow
A white double-height living room with a black ceiling fan on a downrod, a wall aircon unit above the TV console and tall windows.
💬 WhatsApp us about this design
ceiling fans for high ceilings →Illustrative concept design · Modern classic · Semi-D · Bungalow
A built-in display wall with lit walnut-lined open shelves of ceramics either side of a TV and drawers below.
💬 WhatsApp us about this design
display cabinet designs →Illustrative concept design · Tropical · Semi-D · Bungalow
A living room with wide black-framed glass sliding doors open onto a lawn and a tropical garden, a cream sofa and a timber TV console.
💬 WhatsApp us about this design
sliding door designs →These are illustrative concept designs created to show semi-D and bungalow living room options. They are not completed ClickBina projects. We renovate semi-D and bungalow living rooms, from feature walls and ceilings to carpentry and lighting, and your room is assessed and quoted to its own size, void and services.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Semi-Ds and bungalows give the living room space a terrace never has: width, windows on more than one side and often a double-volume void. The risk is a room that feels empty or echoing. Most good designs do three things: give the room one strong focal wall, zone the floor so it does not feel like a hall, and plan the void so it is comfortable to sit under.
For the whole house, room by room, see the semi-D and bungalow interior design gallery.
| Element | Why it matters | Watch for |
|---|---|---|
| Chandelier or pendant | Fills the height and lights the hall | A point reinforced to the slab, access for cleaning |
| Ceiling fan | Moves air down to the sofa | A long downrod and a reinforced fan point |
| Aircon | Cooling a tall room | Cool the lower zone; a void wastes cold air upwards |
| High louvres | Let hot air escape | Safe opening and rain-resistant blades |
| Curtains | Control sun on tall glass | A ceiling track fixed to structure, often motorised |
| Gallery balustrade | Safety at the landing edge | Laminated safety glass, sound edge |
| Room | Usually works | Hand-off |
|---|---|---|
| Wide hall, no void | Two sofa groups, a display wall, garden doors | Living room designs |
| Hall under a void | A chandelier, a fan on a long downrod, high louvres | Void decision guide |
| Staircase in full view | A glass balustrade or a stone-look partition | Glass railing guide |
| Family with children | A family hall with a study corner | Built-in study desk guide |
A double-volume void is dramatic but hard to cool, hard to clean and loses upstairs floor area. ClickBina's guide to closing or opening a void covers when it is worth filling in with a new floor and what that involves. If you keep it, plan the high fixtures together: the chandelier and pendant installation guide and the high-ceiling fan downrod guide both explain why the point and the access cost more than the fitting.
For the upstairs family space that often sits beside the void, see the upstairs family hall design guide.
ClickBina's TV feature wall cost guide puts a basic TV wall at RM3,000 – RM6,000 and a mid-range design with built-in cabinets and feature panels at RM8,000 – RM14,000. The stone wall panel guide quotes a cultured stone wall at RM2,000 – RM6,000 installed for a 100 sq ft wall.
In the void, a fan or chandelier point reinforced to the slab is RM150 – RM480 in the chandelier guide, and a structural glass balustrade is RM800 – RM1,800 per running metre in the glass railing guide. Scaffolding for high work and the fittings themselves are extra. These are indicative Klang Valley figures for 2026.
We renovate semi-D and bungalow living rooms, from feature walls, ceilings and display carpentry to void lighting and glass balustrades. WhatsApp us your job details for a quote: whether the hall has a void, the rough size of the room, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a semi-D or bungalow living room option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.