Browse 13 kitchen wall tile looks, from a short backsplash to a wet kitchen tiled to the ceiling, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

Kitchen wall tiles do two jobs: they protect the wall behind the worktop and the hob from oil, steam and splashes, and they set the look of the kitchen. The choice that matters most is where the tiles stop and how they are cleaned: a dry kitchen can carry a short decorative backsplash, while a Malaysian wet kitchen used for wok cooking is better tiled high in a glazed tile with a grout colour that hides oil. These 13 concept designs show subway, hexagon, finger, slab, zellige-look, cement-look and Peranakan patterns in modern, classic, industrial and heritage styles. Use the filters below to narrow them by style, by dry or wet kitchen, or by home type.
Each design below is an illustrative concept render of one kitchen wall finished in tiles. They are grouped by style, by dry or wet kitchen, and by home type. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the tile or the work behind that look.
13 designs shown
Illustrative concept design · Classic · Condo · Terrace
Glossy white rectangular tiles in a herringbone zigzag between white wall cabinets and a white worktop, with one wall socket.
💬 WhatsApp us about this design
tile designs →Illustrative concept design · Modern · Terrace · Semi-D
A wet kitchen with large light grey glazed tiles on every wall up to the ceiling, white cabinets, a granite-look worktop, a gas hob and a glass back door.
💬 WhatsApp us about this design
wet and dry kitchen planning →Illustrative concept design · Modern · Condo
Matt white hexagon tiles with thin grout behind a black induction hob under a black hood, with oak cabinets and a white worktop.
💬 WhatsApp us about this design
mosaic and small tiles →Illustrative concept design · Modern · Condo · Semi-D
A backsplash of large white marble-look slabs with bold grey veins and almost no joints, above a white worktop and taupe handleless cabinets.
💬 WhatsApp us about this design
large-format tile installation →Illustrative concept design · Heritage & pattern · Terrace
Large glossy white tiles with one narrow border row of blue, teal and red floral Peranakan-style tiles just above an oak-look worktop.
💬 WhatsApp us about this design
Peranakan interior design →Illustrative concept design · Modern · Condo · Terrace
Slim glossy sage green tiles laid vertically with fine joints between oak wall and base cabinets, a white worktop and a black tap.
💬 WhatsApp us about this design
glazed and unglazed tiles →Illustrative concept design · Modern · Condo
White wall tiles with a wavy 3D relief running round an L-shaped backsplash, side light from a window showing the texture.
💬 WhatsApp us about this design
tile designs →Illustrative concept design · Industrial · Condo · Terrace
Matt black rectangular tiles with pale grout lines between black cabinets with open cubbies and a grey granite-look worktop with a black sink.
💬 WhatsApp us about this design
grout types →Illustrative concept design · Classic · Terrace · Semi-D
Cream glossy square tiles running up to the ceiling with no wall cabinets, two timber shelves on black brackets holding white plates.
💬 WhatsApp us about this design
kitchen designs →Illustrative concept design · Industrial · Condo
Large grey cement-look tiles between white handleless cabinets and a white worktop, with one black floating shelf holding two plain jars.
💬 WhatsApp us about this design
tile sizes →Illustrative concept design · Modern · Terrace
Large white square glazed tiles with grey grout behind a wok on a gas burner set in a stainless steel worktop, under a plain black hood.
💬 WhatsApp us about this design
grout types →Illustrative concept design · Classic · Semi-D · Condo
Glossy beige square tiles with a mottled handmade look on the backsplash and side wall, cream shaker cabinets with brass pulls and a brass tap.
💬 WhatsApp us about this design
glazed and unglazed tiles →Illustrative concept design · Industrial · Terrace · Semi-D
A brushed stainless steel panel behind a gas hob under a stainless hood, meeting large glossy white wall tiles on each side with straight joints.
💬 WhatsApp us about this design
stainless steel worktops →These are illustrative concept designs created to show kitchen wall tile options. They are not completed ClickBina projects. We lay and replace kitchen wall tiles as part of our renovation work, and your kitchen is assessed and quoted to its own walls, cabinets and cooking habits.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with how you cook. A dry kitchen that sees light cooking and reheating can carry almost any wall tile, including matt and textured ones. A wet kitchen where the family fries and stir-fries every day needs a wall that can be scrubbed often: glazed tiles, a grout that does not stain easily and tiles taken high enough to catch the splash.
ClickBina's tile design gallery shows tiles across the whole house; this gallery stays on the kitchen wall.
| Tile | Cleaning near the hob | Look | Kitchen watch-out |
|---|---|---|---|
| Glossy ceramic (subway, square, finger) | Easiest to wipe | Classic, bright | Thin glaze can chip if knocked |
| Large-format porcelain slab | Very few joints to clean | Seamless, stone or marble look | Needs a flat wall and careful cut-outs |
| Hexagon or mosaic | Many joints | Pattern, texture | Grout choice matters more |
| Matt or cement-look | Holds grease | Soft, modern, industrial | Better on dry kitchen walls |
| 3D relief or handmade-look | Texture catches dirt | Feature wall | Keep away from the main splash zone |
| Stainless steel panel | Wipes clean, takes heat | Practical, commercial | Joint to the tiles must be sealed |
| Kitchen | Usually works | Watch for |
|---|---|---|
| Dry kitchen, light cooking | Herringbone, zellige-look, slab, 3D relief, patterned band | Matt and textured tiles near the hob |
| Wet kitchen, daily wok cooking | Large glazed tiles to the ceiling, dark or epoxy grout, a steel panel behind the cooker | Damp in old walls before retiling |
| Condo kitchen, one wall | One feature panel such as hexagon or green finger tiles | Socket and switch positions in the tile layout |
| Older kitchen with sound tiles | Retiling over the old tiles where they are firmly fixed | Every old tile must be checked first |
This gallery covers the tiled wall. For the rest of the kitchen, see the kitchen design gallery for cabinets and layouts, the wet and dry kitchen guide for which zone gets which surfaces, and the stainless steel worktop guide if the wet kitchen top is being replaced too.
If the old tiles are still firmly fixed, the guide to tiling over existing tiles explains when a new layer can go on without hacking, and the guide to wall tiles popping or falling off explains what to check if they are not.
ClickBina's tile design guide gives supply-and-lay rates by tile grade: ceramic at RM10 – RM18 per sq ft, porcelain at RM18 – RM35 per sq ft and mosaic at RM20 – RM45 per sq ft, with about RM2 – RM5 per sq ft extra labour for large-format tiles (indicative Klang Valley ranges for 2026).
The grout types guide puts epoxy grout at about RM1 – RM3 per sq ft extra over normal grout. Hacking off old tiles, removing and refitting wall cabinets, and moving sockets are separate lines, so ask for each to be listed on the quote.
We lay and replace kitchen wall tiles as part of our renovation work, from a short backsplash to a full-height wet kitchen wall, and we can replace the worktop and cabinets in the same job. WhatsApp us your job details for a quote: the length of the wall, dry or wet kitchen, and the look from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a kitchen wall tile option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.