Browse 12 living room ideas for older flats and apartments, where the front door opens into a narrow strip that is also the dining room and the way to the bedrooms.
📍 We serve KL, Selangor & Putrajaya.

In most older Malaysian flats and low-cost apartments the living room is a narrow strip with the front door opening straight into it, a grilled window or small balcony at the far end, a bare ceiling, and the corridor to the bedrooms running off one side. It has to be the entrance, the living room, the dining room and sometimes the guest room. The ideas that work give the door a screen or a shoe cabinet, keep one wall for the TV, put dining by the window, soften the grilles, and use paint, rugs and curtains instead of carpentry where the budget is tight. These 12 concept designs show modern, minimalist, Scandinavian, Japandi, tropical and budget ideas.
Each design below is an illustrative concept render of a living room in an older flat or apartment, grouped by style. Tap any image to enlarge it, and open the details for what each idea suits, the finish and what to watch for. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Modern
A tall white cabinet and timber door panels beside the flat's entrance, a grey sofa by a grilled window and a bare slab ceiling.
💬 WhatsApp us about this design
foyer and shoe storage →Illustrative concept design · Minimalist
A switched-off TV on a plain white wall above one long floating oak shelf with a plant, a cable running down below, the corridor opening at the side.
💬 WhatsApp us about this design
floating shelves →Illustrative concept design · Scandinavian
A concrete-walled flat living area at dusk with a low bed made up for a guest, a grey armchair and a switched-off TV.
💬 WhatsApp us about this design
small space ideas →Illustrative concept design · Tropical
A timber planter ledge full of potted ferns and plants along the sill inside a white grilled window.
💬 WhatsApp us about this design
tropical home style →Illustrative concept design · Japandi
A built-in cushioned L bench at the grilled window with a small oak table and a chair, a glass pendant and a TV on the side wall.
💬 WhatsApp us about this design
dining room design →Illustrative concept design · Modern
A terracotta arch painted on a cream wall behind a beige sofa, with grilled windows on the side and a TV on the facing wall.
💬 WhatsApp us about this design
wall paint designs →Illustrative concept design · Scandinavian
A white steel and oak open shelving wall holding a switched-off TV, woven baskets and ceramics, beside a grilled balcony door.
💬 WhatsApp us about this design
floating shelves and bookcases →Illustrative concept design · Japandi
A low timber table on a woven floor with floor cushions and a built-in low bench under a wide window.
💬 WhatsApp us about this design
small space ideas →Illustrative concept design · Tropical
A rattan sofa and rattan TV console, a round timber table and many plants, with sheer curtains at the balcony door.
💬 WhatsApp us about this design
tropical home style →Illustrative concept design · Budget refresh
A linen curtain on a ceiling track half drawn across the opening between the living room and the corridor, a TV on the side wall.
💬 WhatsApp us about this design
room dividers →Illustrative concept design · Budget refresh
A jute rug on the old terrazzo floor with a beige sofa, a globe floor lamp, sheer curtains and open shelving with a TV.
💬 WhatsApp us about this design
tenant-proof materials →Illustrative concept design · Minimalist
A clean white TV wall with a switched-off TV over a low white console, a white boxed vertical pipe and a socket beside it.
💬 WhatsApp us about this design
concealed wiring →These are illustrative concept designs created to show living room options for flats and apartments. They are not completed ClickBina projects. We renovate flats in KL and Selangor, and your living room is assessed and quoted to its own size, condition and the management's rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with the walkway. In a narrow flat living room the path from the front door to the corridor and the kitchen is fixed, so furniture goes along the walls and the middle stays clear. Then give each part of the strip one job.
Where the budget is small, paint, curtains, rugs and a few plants change a flat living room more than any carpentry.
| Move | What it solves | What to check |
|---|---|---|
| Shoe cabinet or screen at the door | No direct view into the room | Door swing and grille gate |
| Floating shelf or open shelving for the TV | Saves floor space | Socket and cable route |
| Bench or dining nook by the window | Seating and dining in the best light | Window still openable |
| Paint feature wall | A focal point for little money | Washable paint |
| Curtain to the corridor | Separates living and bedrooms | Ceiling fixing |
| Rug over the old floor | Warmth without changing the floor | Non-slip underlay |
| Your living room | Usually works | Watch for |
|---|---|---|
| Door opens into the room | Tall shoe cabinet or screen at the door | Grille gate clearance |
| Narrow strip | Furniture on the walls, rug for the sofa area | Clear walkway |
| Dining and living in one | Window bench and small table | Openable window |
| Rental unit | Rug, curtains, plants, paint | Durable, easy-clean finishes |
| Guests stay over | Sofa bed or low guest bed | Open length against the walkway |
This gallery covers the living room. The flat interior design gallery covers the whole unit, and the walk-up and low-cost flat renovation guide explains what to fix first. For the details, see foyer and shoe storage, floating shelves and room dividers without walls.
For more styles, the living room design gallery covers condos and landed homes too.
ClickBina's walk-up and low-cost flat guide puts a full interior repaint at RM3,000 – RM5,500 and vinyl plank flooring for the living room and bedrooms at RM5,000 – RM10,000, within a cosmetic refresh of the whole flat at RM12,000 – RM25,000 (indicative Klang Valley ranges for 2026).
Shoe cabinets, benches, shelving and screens are quoted per job. Rugs, curtains and plants are the cheapest changes and need no approval at all.
We renovate living rooms in walk-up, PPR and low-cost flats in KL and Selangor: painting, flooring, shoe cabinets, benches, shelving and lighting, planned for the stairs and the management's rules. WhatsApp us your job details for a quote: the block, the floor level, the size of the room and the look from this page you like. We'll reply as soon as we can with next steps, and the price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a living room option for a flat or apartment. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.