Browse 12 interior looks for a kampung or wooden house, from an open-roof living hall to a cool colour palette, then see what each involves.
📍 We serve KL, Selangor & Putrajaya.

Inside a kampung house, good design works with the timber, not against it: keep the high roof and the louvres for airflow, brighten plank walls with wood paint, refinish floors and ceiling boards, and furnish lightly with rattan and timber. Timber walls move and breathe, so heavy wall-hung cabinets and wet finishes do not belong on them, and old wiring clipped onto timber is the biggest fire risk, so it is re-run in conduit before the finishes. These 12 concept designs show traditional, light and practical kampung interiors. Use the filters below to narrow them by style.
Each design below is an illustrative concept render of the inside of a kampung or wooden house, grouped by style. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the paint, floor, ceiling, window, door or wiring work behind that look.
12 designs shown
Illustrative concept design · Traditional
An open timber roof with exposed trusses and one ceiling fan on a downrod above a warm timber floor, cream walls and timber-framed windows and doors.
💬 WhatsApp us about this design
fans for high ceilings →Illustrative concept design · Light & airy
A sunlit room with soft white vertical plank walls, white louvred doors and windows, an exposed timber roof, a natural timber floor, a low bench and two pale blue floor cushions.
💬 WhatsApp us about this design
painting a timber house →Illustrative concept design · Traditional
A timber-walled living room with a rattan sofa and two rattan armchairs with cream cushions, a solid timber coffee table on a jute mat, and rows of small-paned windows.
💬 WhatsApp us about this design
living room colours →Illustrative concept design · Traditional
Looking up at a pitched ceiling of varnished honey-toned timber boards on exposed rafters, a simple white enamel pendant light, and pale green plank walls below.
💬 WhatsApp us about this design
wood finishes →Illustrative concept design · Light & airy
A pale blue plank bedroom seen through a doorway: a timber bed with a mattress and white linen under a hanging mosquito net, louvred windows and a timber floor.
💬 WhatsApp us about this design
louvre window options →Illustrative concept design · Traditional
A timber room with a long built-in bench running along two walls under rows of louvred windows, a few cushions and a polished timber floor.
💬 WhatsApp us about this design
built-in storage ideas →Illustrative concept design · Safe & practical
A grey metal conduit runs down a cream plank wall and along it on clips to white socket boxes, with no loose cables, above a timber floor.
💬 WhatsApp us about this design
house rewiring →Illustrative concept design · Light & airy
A pair of timber sliding doors with frosted panels opened to a bedroom with a low bed, timber plank walls, an open roof and a window to the trees.
💬 WhatsApp us about this design
sliding door designs →Illustrative concept design · Traditional
A quiet corner with a low raised timber platform, a woven mat partly rolled, a simple timber bench, pale green plank walls and a louvred window.
💬 WhatsApp us about this design
timber floor refinishing →Illustrative concept design · Light & airy
A bright hall with wide timber floor boards sanded and finished to a warm sheen, cream plank walls, an exposed roof and a long window with louvres above.
💬 WhatsApp us about this design
timber floor sanding →Illustrative concept design · Safe & practical
Three timber shelves on black steel brackets screwed into a vertical timber plank wall, holding woven baskets, white bowls, jugs and plants.
💬 WhatsApp us about this design
shelves and bookcases →Illustrative concept design · Light & airy
A room painted entirely in pale mint: panelled plank walls, white louvred shutters along both sides, a painted plank floor and pale floor cushions.
💬 WhatsApp us about this design
living room colours →These are illustrative concept designs created to show interior options for a kampung or wooden house. They are not completed ClickBina projects. Your house is assessed and quoted to its own timber, wiring and layout.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
A kampung house stays cool because of its form: a raised floor, a tall roof, deep eaves and many openings. The interior should keep those working. Leave the louvres operable, keep air paths open under and through the house, and brighten rooms with colour and light rather than closing them in.
If a room has a wet use, such as a bathroom or wet kitchen on the timber floor, the better design move is to take it out of the timber house; ClickBina's kampung house renovation guide recommends moving wet rooms into masonry.
| Part of the house | Works well | Avoid |
|---|---|---|
| Plank walls | Wood paint, light shelves on studs, fabric and woven panels | Heavy wall-hung cabinets on boards, cement render, wet finishes |
| Timber floor | Sanding and oil or lacquer, rugs, raised furniture | Tiles laid on boards, standing water, sealed-in damp |
| Open roof | Cleaned rafters, a fan on a downrod, roof insulation above | Closed low ceilings that trap heat |
| Louvres | Restored leaves, insect screens behind | Fixed glass that stops the airflow |
| Old wiring | Full rewire in conduit with earth leakage protection | Adding more sockets onto old cable |
| Room | Usually works | Watch for |
|---|---|---|
| Living hall | Open roof, fan on a downrod, rattan, sanded floor | Fan fixing strength and wiring route |
| Bedroom | Pale planks, louvres with screens, a net canopy | Rain through old louvres |
| Front room or serambi | Built-in bench, cushions, plenty of airflow | Rain splash at the open edge |
| Prayer corner | Low raised platform, plain mat, quiet colours | Trip edge on the platform |
The kampung renovation guide calls old wiring clipped onto timber walls the most serious risk in an old wooden house, and recommends a full rewire in conduit with a new distribution board and earth leakage protection. Termites are treated before repairs, because new timber over an active colony is simply fresh food; see termite treatment for existing homes.
No single rate covers a kampung interior, because board repairs and the state of the wiring drive the price. The published figures on ClickBina's guides give the scale: timber floor sanding and refinishing at RM4 – RM8 per sq ft, an extra RM50 – RM150 per ceiling fan for ceilings of 12 ft and above, corrective termite treatment at RM1,500 – RM4,000, and a terrace-house rewire at RM8,000 – RM15,000, which the kampung renovation guide uses as a yardstick (indicative Klang Valley ranges for 2026).
Ask for repairs, wiring, floors and paint to be listed separately so the safety work can go first.
We renovate and repair houses, including the carpentry, floor, paint and wiring work a kampung interior needs, with an electrician for the wiring and termite treatment planned before the timber work. WhatsApp us your job details for a quote: where the house is, which rooms you want to change, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, we'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show an interior option for a kampung house. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.