Browse 13 looks for the upstairs corridor, the landing and long passages, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

The corridor is the most forgotten space in many Malaysian double-storey terraces and semi-Ds: a narrow, windowless passage between the bedrooms and the stairs. The ideas that work best bring in light without windows (a skylight, low-level lights, light walls), protect the walls from knocks (wainscoting, a two-tone or darker lower wall), and add storage or a place to sit only where the width allows. These 13 concept designs show upstairs corridors, landings and long passages in modern, classic, contemporary and Scandinavian styles. Use the filters below to narrow them by style or home type.
Each design below is an illustrative concept render of one corridor, landing or passage idea. They are grouped by style and by home type. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look.
13 designs shown
Illustrative concept design · Classic · Terrace · Semi-D
A corridor with sage green painted wainscoting and a white dado rail below white walls, white panel doors and a herringbone timber floor.
💬 WhatsApp us about this design
wainscoting designs →Illustrative concept design · Modern · Semi-D · Bungalow
An upstairs landing along a void, edged by a frameless glass balustrade with a timber handrail, light grey tiles and white walls.
💬 WhatsApp us about this design
staircase glass railings →Illustrative concept design · Contemporary · Terrace · Semi-D · Condo
A corridor at night lit only by warm LED strips along the base of both walls, pooling light on the timber floor toward the doors.
💬 WhatsApp us about this design
lighting design →Illustrative concept design · Scandinavian · Terrace · Condo
A passage wall with oak-framed botanical leaf prints at eye level, white walls and a timber floor leading to a white door.
💬 WhatsApp us about this design
feature wall ideas →Illustrative concept design · Modern · Semi-D · Bungalow
A corridor with a run of flush white full-height built-in cabinets along one side, a timber floor and a window at the far end.
💬 WhatsApp us about this design
small-home storage ideas →Illustrative concept design · Modern · Terrace
A windowless upper landing lit by a rectangular glass skylight in the ceiling, with white doors, light grey tiles and the stair rail.
💬 WhatsApp us about this design
skylight costs →Illustrative concept design · Scandinavian · Terrace · Condo
A corridor with a pale blue patterned runner and a white floating console shelf with a plant, beside a white staircase.
💬 WhatsApp us about this design
floating shelves →Illustrative concept design · Contemporary · Terrace · Semi-D
A corridor ending in a smooth rounded plaster arch that frames a bright room with a single armchair beyond.
💬 WhatsApp us about this design
arch designs →Illustrative concept design · Contemporary · Terrace · Semi-D
A long corridor with a white left wall and the right and end walls painted deep terracotta, an arched opening at the far end.
💬 WhatsApp us about this design
paint colours →Illustrative concept design · Modern · Terrace · Semi-D · Condo
A passage with long light oak-look planks running toward white double doors, white walls and a stair rail beyond.
💬 WhatsApp us about this design
wood-look tiles →Illustrative concept design · Modern · Terrace · Semi-D · Condo
A dark corridor at night lit by small square low-level step lights on both walls, casting pools of light on the floor.
💬 WhatsApp us about this design
lighting design →Illustrative concept design · Scandinavian · Terrace · Condo
A narrow corridor with white panel doors sliding on black top tracks along the wall, a timber floor and a door at the end.
💬 WhatsApp us about this design
sliding door designs →Illustrative concept design · Scandinavian · Semi-D · Bungalow
A landing with a built-in oak bench with drawers under a wide window, linen cushions and folded throws, beside a white stair balustrade.
💬 WhatsApp us about this design
family hall and landing ideas →These are illustrative concept designs created to show hallway and corridor options. They are not completed ClickBina projects. We refit corridors and landings as part of our renovation work, and your house is assessed and quoted to its own layout, light and structure.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Measure the width first. In most terraces and semi-Ds the upstairs corridor is just wide enough to walk through with a bag, so storage, benches and consoles only belong where there is spare width, such as at the landing or a widened section. A corridor that is too narrow for furniture still gains a lot from light, colour and a tougher wall finish.
If your landing is wide enough to become a sitting area, see the family hall and upstairs lounge guide.
| Problem | Usually helps | Corridor watch-out |
|---|---|---|
| Dark, no window | Skylight, tubular skylight, light walls, low-level lights | Roof access and waterproofing for any skylight |
| Scuffed lower walls | Wainscoting, a two-tone wall, washable paint | Rail height lined up with switches and handles |
| Feels like a tunnel | Framed art, a darker end wall, an arch at the end | Frames and fittings must stay slim |
| Doors block the way | Sliding doors or doors rehung into the rooms | Clear wall needed beside sliding doors |
| No storage upstairs | Shallow built-in cabinets where the width allows | Walkway width with the doors open |
| Unsafe at night | Low step lights, a skirting LED strip, a sensor | Wiring planned before the finishes |
| Your corridor | Usually works | Watch for |
|---|---|---|
| Narrow terrace corridor, no window | Light walls, low-level lights, a skylight above | Roof structure and leaks around the skylight |
| Landing beside a void | Glass balustrade, a reading bench, a runner | Balustrade height and gaps with children at home |
| Long semi-D or bungalow passage | Shallow storage, framed art, a darker end wall | Keeping the walking route clear |
| Condo entry passage | A mirror or art at the end, slim console, good lighting | Strata rules on wiring and drilling |
A corridor usually connects to the stairs and sometimes to a void. The staircase glass railing guide covers balustrades at the landing, the guide to closing or opening a void covers double-height spaces, and the wainscoting design gallery shows panel styles for the corridor walls.
For light, the lighting design gallery covers downlights, wall lights and LED strips, and the skylight cost guide compares fixed, vented and tubular skylights.
Skylights have published ranges. ClickBina's skylight cost guide gives indicative Klang Valley installed costs of RM1,500 – RM3,500 for a small fixed polycarbonate skylight and RM3,500 – RM7,000 for a small fixed glass skylight, and RM1,800 – RM4,000 for a tubular skylight, which suits corridors with no direct roof access.
Wainscoting, built-in storage, lighting and flooring are quoted per job, because the corridor length, wall condition and wiring routes differ from house to house. Ask for each item to be listed separately so you can phase the work.
We refit corridors and landings as part of our renovation work: we install wainscoting and lighting, build shallow built-in storage and benches, lay new floors and paint the walls. Glass balustrades, sliding doors and skylights are quoted as their own items. WhatsApp us your job details for a quote: the corridor length and width, what you want to change, and the ideas from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a hallway or corridor option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guide named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.