Browse 14 TV cabinet designs by style and home type, then see what each one costs to build.
📍 We serve KL, Selangor & Putrajaya.

A good TV cabinet design starts with two choices: a low or floating console under a wall-mounted TV, or a full-height wall unit that frames the TV with storage. Low consoles suit most condos and are priced per foot run; full-height units suit terrace and semi-D living halls and are priced like a feature wall. Use the filters below to narrow the 14 concept designs by style or home type.
Each design below is an illustrative concept render, grouped by style and by the home it usually suits. Tap any image to enlarge it. Every card links to the ClickBina guide that prices or explains that type of build.
14 designs shown
Illustrative concept design · Modern · Condo · Terrace
A long wall-hung console in walnut-look veneer with three wide drawers and a warm LED strip glowing on the floor beneath it. The TV sits on the wall above.
💬 WhatsApp us about this design
TV cabinet costs by type →Illustrative concept design · Modern · Terrace · Semi-D
Floor-to-ceiling white cabinets with flat doors, a recessed centre bay for the TV, and oak-lined open niches with warm strip lights on both sides.
💬 WhatsApp us about this design
TV feature wall costs →Illustrative concept design · Japandi · Condo · Terrace
A low oak console with vertical slatted doors, standing on short tapered legs against a warm beige wall, with two ceramic vases on top.
💬 WhatsApp us about this design
console prices per foot run →Illustrative concept design · Minimalist · Condo
A slim white floating console with four flat push-to-open doors and nothing on the wall but the TV. Only a small streaming box sits on top.
💬 WhatsApp us about this design
what a floating console costs →Illustrative concept design · Modern · Condo · Terrace
A full-height dark timber-look fluted wall panel carries the TV, edged with vertical warm LED strips, above a matt black floating console with an underglow.
💬 WhatsApp us about this design
TV feature wall pricing →Illustrative concept design · Industrial · Terrace · Condo
An oak console with two drawers and an open middle shelf for a media box, sitting on a black steel frame in front of a cement-finish wall.
💬 WhatsApp us about this design
low console costs →Illustrative concept design · Classic · Semi-D · Terrace
A sage-green cabinet on a plinth with four shaker-style doors and small brass knobs, the TV standing on top, set against a white wall finished with rectangular moulding frames.
💬 WhatsApp us about this design
feature wall and moulding costs →Illustrative concept design · Modern · Condo · Semi-D
A low console with dark timber fronts and a marble-look top, under a TV mounted on marble-look wall cladding lit by a recessed warm cove.
💬 WhatsApp us about this design
cabinet LED lighting options →Illustrative concept design · Modern · Semi-D · Terrace
Two tall display cabinets with gridded glass doors and warm internal lights stand either side of the TV, joined by a long grey-oak base cabinet with an open media slot.
💬 WhatsApp us about this design
LED lighting inside cabinets →Illustrative concept design · Minimalist · Condo
A low light-wood cabinet with a white top runs along the window wall and turns the corner under the wall-mounted TV, next to a run of full-height wood-look storage cabinets.
💬 WhatsApp us about this design
planning TV and Astro cabling points →Illustrative concept design · Minimalist · Condo · Terrace
A full wall of greige flat-panel cabinets with the TV set into a framed recess, overhead cabinets above and slim black pulls only on the lower drawers.
💬 WhatsApp us about this design
concealed TV cable planning →Illustrative concept design · Tropical · Terrace · Condo
A teak-look console on angled legs with woven rattan cane door panels, two drawers and an open shelf in the middle, beside a large potted plant.
💬 WhatsApp us about this design
console cost guide →Illustrative concept design · Modern · Condo · Terrace
An oak frame with an open top shelf wraps sage-green drawer fronts, sitting on a low oak plinth with the TV standing on top.
💬 WhatsApp us about this design
console prices →Illustrative concept design · Classic · Semi-D
Floor-to-ceiling walnut cabinets frame the TV: tall door towers on both sides, a row of overhead cabinets across the top and wide drawers with a brass pull below.
💬 WhatsApp us about this design
feature wall budgets →These are illustrative concept designs created to show style options. They are not completed ClickBina projects; your cabinet is drawn and quoted to your own wall, TV size and storage needs.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with the wall, not the style. Measure the wall you have, note where the power point and Astro or TV cable come in, and decide whether the TV will hang on the wall or stand on the cabinet. Those three facts decide most of the design.
Before you fix the style, decide what must be hidden: router, media box, game console, speakers. Cabinets that hold electronics need ventilation and a cable route, which changes the door and back-panel design.
| Style | What it looks like | What drives the cost | Upkeep | Suits |
|---|---|---|---|---|
| Floating console | Wall-hung box, floor clear below | Length, finish, drawer hardware | Low; easy to mop under | Condo, terrace |
| Full-height wall unit | Cabinets frame the TV floor to ceiling | Wall size, niches, lighting | Medium; more doors to wipe | Terrace, semi-D |
| Japandi slatted | Oak slats, legs or plinth | Veneer quality, slat count | Dust in the grooves | Condo, terrace |
| Minimalist handle-less | Flat doors, push-to-open | Hinge type, lacquer vs laminate | Fingerprints on matt fronts | Small condo |
| Classic shaker | Framed doors, knobs, moulding | Painting, moulding work | Paint touch-ups | Semi-D, terrace |
| Industrial frame | Steel frame, timber box | Steel fabrication, timber | Low | Terrace, condo |
| Glass display | Lit glass towers | Glass doors, internal lights | Glass cleaning | Terrace, semi-D |
| Home | Usually works | Watch for |
|---|---|---|
| Small condo or studio | Slim floating or L-shaped corner console, light colours | Short walls, few power points, management rules on hacking |
| Mid-size condo | Floating console or a fluted feature panel with console | Keeping cables inside the wall or trunking |
| Double-storey terrace | Full-height unit or long console with niches | Uneven walls in older houses; afternoon sun on finishes |
| Semi-D | Full-height towers with bridge, glass display towers | Very long walls; balancing dark finishes with light |
Low and floating consoles are priced by the foot run. ClickBina's TV cabinet cost guide puts a floating or low console at RM280 – RM600 per ft run in the Klang Valley, with laminate at the lower end and premium finishes at the top. Drawer runners, soft-close hinges and lighting add to that.
Full-height wall units, fluted backdrops and display towers are not priced per console foot. They are quoted as a feature-wall job because the whole wall is built; see the TV feature wall cost guide or try the TV feature wall cost calculator for a first estimate.
We build custom TV cabinets, from simple floating consoles to full-height wall units, as part of our carpentry work across KL and Selangor. WhatsApp us your wall width, the TV size and the design you like from this page, and we will reply within the hour with next steps. The price we agree is a flat price with no hidden charges. A site visit is free.
About the images: every image on this page is an illustrative concept design generated to show a style option. Captions describe what each render shows. The only RM figure is quoted unchanged from the ClickBina guide named above, an indicative Klang Valley range for 2026.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.