Light where the task is: inside wardrobes, under wall cabinets and on display shelves.
📍 We serve KL, Selangor & Putrajaya.

Cabinet and wardrobe lighting is usually an LED strip in an aluminium profile, or small puck lights, run from a low-voltage driver and switched by a door sensor, a motion sensor or a wall switch. The decisions that make it look built-in — where the driver sits, how the cable reaches it, and where the switch goes — have to be made with the carpenter before the panels are closed. ClickBina's guides list LED strip inside a wardrobe at RM50 – RM120 per metre installed (indicative 2026, Klang Valley). A site visit is free.
A ceiling light behind you throws your own shadow onto the kitchen worktop and into the wardrobe. Deep wardrobes, tall shoe cabinets and the back of a display unit stay dark however bright the room is. A line of light inside or under the cabinet puts light exactly where the task is: the chopping board, the row of shirts, the objects on a glass shelf.
It is also a detail that is cheap to plan and expensive to add later. Once a wardrobe is built and its back panel is fixed, running a cable through it means drilling finished boards and hiding wires in corners.
| Option | Light it gives | Best for | Watch for |
|---|---|---|---|
| LED strip in an aluminium profile | An even line of light | Under wall cabinets, under wardrobe shelves, above rails | Needs a profile or groove and a driver |
| COB strip | A continuous line with no dots | Glass shelves and visible edges | Runs warmer; always in a profile |
| Puck lights | Separate pools of light | Retrofit under existing cabinets | Visible spots on the worktop |
| Battery or rechargeable sensor bars | Short, local light | Rented units, small shoe cabinets | Charging; weaker light |
The LED strip guide explains COB versus SMD strips, 12 V versus 24 V, and why a profile matters. For cabinetry the short version is: a strip in a recessed profile with a diffuser looks built-in; a bare strip stuck to the board looks like an afterthought and peels in the heat.
This is the most useful cabinet light in any home. Set the strip towards the front edge of the wall cabinet so light falls on the worktop, not the backsplash, and recess it or add a small pelmet so the strip cannot be seen from a seated position. Choose a warm or neutral white that matches the rest of the kitchen. In a wet kitchen, keep the strip and its joints away from direct splash and steam from the hob.
The wet and dry kitchen guide notes under-cabinet LEDs as one of the things that make a dry kitchen work as the showpiece of an open plan.
A strip under each shelf and above each hanging rail removes the shadows inside deep sections. The walk-in wardrobe guide lists this at RM50 – RM120 per metre installed and recommends motion-activated lighting at the entry, so the lights come on as you walk in.
For hinged or sliding wardrobe doors, a door sensor turns the light on when the door opens and off when it closes. Sensors are small and cheap, but they must be positioned where the door reaches them, and sliding doors need a motion sensor instead because there is no hinge side to trigger.
In a display cabinet the light is part of the look. Vertical strips in the front corners, or a COB strip under each glass shelf, light the objects without glare. The dining room design guide prices a full-height display cabinet with glazed doors and LED strip lighting inside at RM2,500 – RM6,000 custom-made, and the display cabinet cost guide covers the cabinet itself.
A dressing table needs light on the face, not above the head. Vertical strips either side of the mirror, or a strip in a profile along the underside of a wall unit, give even light without the downward shadows of a single ceiling light. The dressing table cost guide covers the table and mirror.
Most cabinet LED strip problems come from a vague brief, not a bad strip. Before the carcass is built, agree these points in writing for each run of cabinets:
With those five answers the carpenter can cut the grooves and cable holes in the workshop instead of drilling finished boards on site.
Every strip needs a driver, and every driver needs a mains supply. Three decisions, made with the carpenter before the panels close:
The electrician services guide explains what a registered wireman does and signs off. Where there is no point nearby, a concealed socket inside the cabinet is one option; the power points guide lists a concealed (chased-in) socket at RM200 – RM400.
LED strips run cool compared with old halogen cabinet lights, but the driver gets warm. A driver shut inside a closed cabinet with clothes packed around it has nowhere to shed that heat, so give it ventilation or put it outside the storage space. Keep strips and joints away from the sink cabinet and anywhere water can reach, and use proper connectors rather than twisted and taped wires.
These are the published ClickBina indicative ranges (2026, Klang Valley):
| Item | Indicative price | Source |
|---|---|---|
| LED strip inside a wardrobe, installed | RM50 – RM120 per metre | Walk-in wardrobe guide |
| LED cove strip (general strip lighting) | RM40 – RM100 per metre | Home lighting design guide |
| Full-height display cabinet with LED strip lighting inside | RM2,500 – RM6,000 | Dining room design guide |
| New wiring point / lighting circuit | RM120 – RM250 per point | Home lighting design guide |
| Concealed (chased-in) socket | RM200 – RM400 | Power points guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteThe length of strip, the number of drivers and sensors, and whether the cabinetry is new or already built decide most of the cost. Lighting planned into new cabinetry costs far less than lighting retrofitted into finished units.
WhatsApp us your job details for a quote: which cabinets or wardrobes, the length to light, and whether they are new or existing. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so the carpentry, the driver positions, the wiring and the sensors can be planned together. We reply within the hour, and the price agreed is a flat price with no hidden charges. A site visit is free.
Methodology: prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each; cabinetry is not priced here except where stated.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.