How House Wiring Works
Circuits, Cable Sizes, Ring vs Radial & Cost (2026)

The layout behind the switches and sockets: what a wireman plans and why each circuit is separate.

📍 We serve KL, Selangor & Putrajaya.

A floor plan marked with coloured circuit lines beside a coil of cable and a switch plate on a drafting table

A Malaysian home's wiring runs from the TNB meter to a main switch and earth-leakage protection in the DB box, then splits into final circuits: lighting and fan circuits in thinner cable, socket circuits in ring or radial form, and a dedicated circuit for each aircon, water heater and cooker. The Suruhanjaya Tenaga guideline sets the minimum cable sizes and how much floor area a socket circuit may serve. Wiring is fixed electrical work for a registered wireman, not DIY. A new wiring point is listed at RM120 – RM250 (indicative 2026, Klang Valley). A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.

From the TNB meter to your light switch

Every home installation follows the same path. TNB's cable arrives at the cut-out and meter, which belong to the supplier. From there the owner's installation begins: a main switch, earth-leakage protection (RCCBs), and a row of breakers (MCBs), each feeding one final circuit that runs out to lights, sockets or a fixed appliance. The whole arrangement is laid out in the Suruhanjaya Tenaga (ST) domestic wiring guideline, whose stated purpose is to be a concise guide for competent persons, electrical contractors and consulting engineers doing wiring work.

This page explains the layout so you can understand a quotation or a renovation drawing. It is not a set of instructions: connecting, altering and testing circuits is work for a registered wireman.

The kinds of circuit in a home

The ST guideline sets the minimum copper conductor size for each kind of final circuit:

CircuitMinimum conductor (ST)What it feeds
Lighting and fan circuits1.5 mm²Ceiling lights, downlights, fans, light switches
13A socket outlet circuits2.5 mm²General sockets in rooms, kitchen and hall
Special power circuits4–6 mm²Air-conditioners, water heaters, cookers, motors and pumps

A typical terrace or condo has a few lighting circuits split by floor or zone, several socket circuits, and one dedicated circuit per aircon and per water heater. The DB box size guide shows how those circuits translate into ways on the board.

How a lighting circuit is laid out

A lighting circuit runs from its breaker to the first light point, then on from point to point around the zone. At each light, a switch cable drops down the wall to the switch. The ST guideline's example drawings show the basic arrangements: one light point controlled by one one-way switch, two points on one switch, two points on two separate switches, one point controlled from two places with two-way switches, and three points with two-way and intermediate switches.

That is why moving a light is rarely "just extending a wire": the new position needs its own feed from the loop and its own switch cable. The light switch types guide explains one-way, two-way and intermediate switching in more detail.

Socket circuits: ring or radial

Sockets are wired either as a ring, where the cable leaves the breaker, visits each socket and returns to the breaker, or as a radial, which runs out and ends at the last socket. The ST guideline limits the floor area each type may serve for general socket circuits in homes:

Circuit typeBreaker rating (A)Minimum copper conductorLargest floor area served
Ring30 or 32 A2.5 mm²100 m²
Radial30 or 32 A4.0 mm²75 m²
Radial20 A2.5 mm²50 m²

In practice this means a larger home has several socket circuits, split by floor or zone, rather than one circuit for the whole house. Where sockets should go, and how near the sink or hob they may sit, is covered in the socket placement rules guide.

Dedicated circuits: aircon, water heater, cooker

High, long-running loads each get their own circuit from the board, in the larger special-power cable. Each split aircon has one; an oven or induction hob has one. The electric water heater circuit is treated with extra care: the ST guideline says it must be permanently connected to a 20A or 32A breaker or fuse with an RCD of not more than 10mA. A dedicated appliance circuit is listed from RM400 in the power points guide.

The earth wire and the colours

Every circuit carries a protective (earth) conductor alongside the live and neutral, bonding metal parts of fittings and appliances back to the main earth. It is what lets an RCCB detect a fault and cut the supply. The colours of live, neutral and earth follow a standard code; the wiring colour code guide explains the current colours and the old ones still found in older houses.

How the protection is grouped

The ST example layouts group circuits under two RCCBs after the main switch: socket circuits under a 30mA device, where people handle appliances, and lighting, fan and aircon circuits under a 100mA device. The water heater has its own 10mA protection. Grouping like this means a leaking kettle trips the sockets, not the lights, so you are not left in the dark while finding the fault.

Where the cables actually run

  • Concealed in walls: in conduit chased into brick or block, then plastered over. Neat, but changes mean cutting the wall; the wall chasing guide covers how chases are cut and made good.
  • Above the ceiling: in the void above a plaster ceiling, or in conduit cast into the slab in condos.
  • Surface trunking: plastic or metal trunking on the wall face; quick, no wall damage, but visible.

During a renovation, the routes are set at first fix, before plaster and ceilings close. The first fix and second fix guide explains that order and what to check before the walls are closed.

Why this is a wireman's job

Getting the layout wrong does not usually fail on day one. It fails years later as an overloaded socket circuit, a heater without the right protection, or an earth that was never connected. Wiring must be done, tested and certified by a competent person registered with ST, who measures insulation, continuity, polarity and earth before the installation is energised. The electrician services guide explains the wireman grades and what the paperwork should show. For older homes with original wiring, the house rewiring cost guide lists the signs that a rewire is due.

What wiring work costs

These are the published ClickBina indicative ranges (2026, Klang Valley):

JobIndicative priceSource
New wiring point / lighting circuitRM120 – RM250 per pointHome lighting design guide
Concealed (chased-in) socketRM200 – RM400Power points guide
Dedicated appliance circuitfrom RM400Power points guide
Rewire a kitchen with dedicated circuitsRM2,000 – RM5,000First fix and second fix guide
Partial rewiring / add points (per area or per circuit)from RM1,500House rewiring cost guide
Full rewire, single-storey terrace houseRM8,000 – RM15,000House rewiring cost guide

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Prices depend on the number of points, how far they are from the board, concealed or surface wiring, and whether walls and ceilings are already open for a renovation.

How ClickBina can help

WhatsApp us your job details for a quote: the property type, and whether you need new points, a partial or full rewire, or wiring as part of a renovation. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so the wiring routes are planned with the walls, ceilings, carpentry and paint that follow. We reply within the hour, and the price agreed is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.

Sources & methodology

Methodology: technical figures follow the ST guideline; prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What size cable is used for lights and sockets in Malaysia?
Under the ST guideline, lighting and fan circuits use a minimum 1.5 mm² copper conductor, 13A socket circuits 2.5 mm², and special power circuits such as aircon and water heaters 4–6 mm².
What is the difference between a ring and a radial socket circuit?
A ring leaves the breaker, visits every socket and returns; a radial runs out and ends at the last socket. The ST guideline limits a 30 or 32 A ring in 2.5 mm² cable to 100 m² of floor area.
Does every aircon need its own circuit?
Yes. Each split aircon has a dedicated circuit from the DB box, in the larger special-power cable.
Why does the water heater have separate protection?
It is a fixed appliance in a wet area. The ST guideline requires it to be permanently connected with an RCD of not more than 10mA.
Can I wire my own house?
No. Wiring must be done, tested and certified by a competent person registered with Suruhanjaya Tenaga.
How much does a new wiring point cost?
A new wiring point or lighting circuit is listed at RM120 – RM250 per point (indicative 2026, Klang Valley).
Why do sockets trip but the lights stay on?
Because sockets and lights are grouped under different RCCBs, so a leaking appliance trips only the socket group.
How is a house wired in Malaysia?
TNB’s cable arrives at the cut-out and meter, which belong to the supplier. After that comes the owner’s installation: a main switch, earth-leakage protection (RCCBs) and a row of MCBs, each feeding one final circuit — lighting circuits in 1.5 mm² cable, 13A socket circuits in 2.5 mm², and dedicated 4–6 mm² circuits for each aircon, water heater or cooker. The layout follows the Suruhanjaya Tenaga domestic wiring guideline, and the work itself is for a registered wireman.
How many power points can be on one circuit?
The ST guideline limits general socket circuits by the floor area they serve: up to 100 m² for a 30 or 32 A ring in 2.5 mm² cable, 75 m² for a 30 or 32 A radial in 4.0 mm², and 50 m² for a 20 A radial in 2.5 mm². That is why larger homes have several socket circuits split by floor or zone, and why aircon and water heaters get their own circuits.