Whole House No Power: TNB Outage or Your DB Box?
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
⚡ Electrical

Whole-House Power Cut
TNB Outage or Your Own DB Box? (2026)

Everything went off at once? Here is how to tell in two minutes whether it is TNB or your own board, and what to do next.

📍 We serve KL, Selangor & Putrajaya.

Torch beam on a distribution board in a dark house while the neighbours still have lights on

When the whole house goes dark, first look outside: if the neighbours and street lights are off too, it is a TNB supply interruption, and TNB's contact page gives 15454 for power outages or breakdowns. If only your house is dark, go to the distribution board. A tripped main switch or RCCB points at a fault inside the house; reset it once, and if it will not hold, leave it off and call an electrician. If nothing on the board has tripped and only you are dark, the fault may be at the main switch or on TNB's side of the meter, which only TNB may touch. A fault-finding call-out is RM150 – RM400 on ClickBina's guides (indicative 2026, Klang Valley).

Step one: is it just your house?

Before you touch the board, look out of the window. Are the neighbours' lights on? The street lights? The guardhouse, the lift lobby, the shop across the road? ClickBina's emergency electrician guide calls this the question that saves the most wasted money: if the neighbours and the street lights are dark too, it is a supply interruption, not yours to repair, and not something a private electrician is permitted to touch.

If the whole area is dark, report it to TNB. TNB's own contact page says that for a power outage or breakdown you should call 15454. Then switch off the heavy appliances and wait.

Reading what you find

What you findWhat it usually meansWho deals with it
Neighbours and street lights dark tooTNB supply interruptionTNB; call 15454
Only you are dark; the main switch or RCCB at your board is downA fault inside the house tripped the protectionYou reset once; an electrician if it will not hold
Only you are dark; nothing on the board has trippedFault at the main switch, the incoming cable or TNB's sideAn electrician to test; TNB if it is their side
Part of the house dark, rest fine, nothing trippedPossible loss of one phase on a three-phase supplyAn electrician first, then TNB
Power returns when reset, then trips againEarth leakage or overload somewhereUnplug and narrow it down, then an electrician
Burning smell or scorching at the boardA hot connection; fire riskMain switch off; an electrician, do not reset

ClickBina's dead circuit guide puts the difference simply: a power cut from TNB takes out everything, or in a three-phase house roughly a third of it, whereas a fault inside the house usually shows up as something tripped at the board.

The distribution board, in plain terms

Most Klang Valley homes have a distribution board, the DB box, with a main switch, one or more RCCBs (the earth-leakage devices with a test button) and a row of small breakers called MCBs, one for each circuit. The dead circuit guide describes the principle: a breaker opens the circuit automatically when it detects an overload or a short circuit, and the RCCB disconnects when current leaks to earth.

When the whole house is off because of a fault inside, it is usually the main switch or an RCCB that has dropped, because one of them sits in front of every circuit. When a single MCB drops, only one circuit goes dark, which is a different job.

If the main switch or RCCB has tripped

ClickBina's power tripping guide keeps the safe DIY zone short: reset the tripped device once; if it holds with everything unplugged, the fault is in an appliance, so plug things back in one at a time; if it will not hold, or you smell burning or see scorching, stop and call an electrician. For a whole-house trip, a careful sequence looks like this:

  1. With dry hands and dry feet, push the tripped device fully down, then firmly up once.
  2. If it will not stay up, switch off all the MCBs, reset the main switch or RCCB, then switch the MCBs back on one at a time. The circuit that trips it again is the suspect.
  3. Unplug appliances on that circuit and try again; if it now holds, the fault is likely in an appliance.
  4. If it still trips with everything unplugged, or you smell burning or see scorching, stop. Leave it off and call an electrician.

The same guide warns against the dangerous shortcut: never let anyone make the tripping stop by bypassing the RCCB or fitting a bigger breaker. The device is tripping because something is wrong.

If nothing has tripped but only you are dark

This is the case that confuses people. The board looks normal, the neighbours have power, and your house is dead. The problem is then between the street and your main switch: a failed main switch or a loose connection at it, the cable from the meter to the board, or TNB's own equipment, the service cable, the cut-out fuse or the meter.

Do not open or touch the meter or the cut-out. TNB's FAQ is explicit that any changes to TNB's meter or fuse are strictly prohibited, even by a contractor. An electrician can test at your board and tell you which side the fault is on; if it is TNB's side, report it to TNB.

When only part of the house is dark

Larger landed homes often have a three-phase supply, with circuits spread across the three phases. The dead circuit guide explains that if one phase is lost, all the circuits on it go dead at once, often a scattered mix of rooms, while the rest of the house works and nothing on the board has tripped. The lost phase can be inside the house or on TNB's side. ClickBina's three-phase power guide explains how the phases are split.

During a TNB outage

  • Switch off aircon, water heaters, the iron and other heavy appliances, so they do not all start at once when power returns.
  • Unplug computers and TV sets if the outage came with a storm.
  • Keep the fridge and freezer doors closed.
  • Use a torch rather than candles, and check on elderly neighbours.
  • Know where the manual release on an autogate is, so you are not locked in or out.

If short outages are a regular problem for your router, CCTV or a home office, ClickBina's home UPS guide explains how to keep the essentials running.

When the power comes back

Turn appliances back on gradually rather than all at once. If the RCCB trips as soon as the supply returns, something was damaged or got wet, often a water heater or an outdoor fitting after a storm, and the power tripping guide's narrowing-down steps apply. If lights flicker, sockets feel warm or anything smells hot after an outage, switch that circuit off and have it checked.

What finding and fixing the fault costs

If the fault is TNB's, you do not pay a private electrician to fix it. If it is inside the house, these are the related prices published on ClickBina's guides (indicative 2026, Klang Valley).

WorkIndicative priceNotes
Fault-finding / diagnosis call-outRM150 – RM400Tracing the leak or overload to its source
Replace a faulty RCCB or MCBRM250 – RM600Where the protective device itself has failed
Basic call-out / minor repairRM80 – RM250A faulty switch, socket or simple fitting
Replace or upgrade the distribution boardRM1,500 – RM3,500New board, RCCB, MCBs, re-termination and testing

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

A repair inspection is RM180, deducted from the repair bill if you go ahead. To quote faster, tell us your area, property type and the size or quantity.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

After-hours attendance is priced separately; the emergency electrician guide explains what an after-hours call-out covers and what it does not.

What never to do yourself

  • Open the distribution board or touch anything inside it.
  • Touch TNB's meter, cut-out or incoming cable.
  • Keep resetting a breaker that trips straight away.
  • Bypass, jump out or up-rate an RCCB or breaker.
  • Work on anything near water, or with wet hands or bare feet.

The emergency electrician guide notes that work on fixed wiring, on the distribution board and on the incoming supply must be carried out by or under the supervision of a competent person registered with Suruhanjaya Tenaga.

How ClickBina can help

WhatsApp us your job details for a quote: whether the neighbours have power, what you see at the board (main switch, RCCB or nothing tripped), and what happened just before. If it is a TNB supply problem, we will tell you to report it to TNB. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so when the fault turns out to be part of a bigger rewiring or board upgrade, the work can be planned together. We reply within the hour, and the price we agree is a flat price with no hidden charges. A repair inspection is RM180, deducted from the repair bill if you go ahead.

Sources & methodology

  • TNB, Contact us — the number to call for a power outage or breakdown.
  • myTNB, FAQ — changes to TNB's meter or fuse are prohibited.
  • ClickBina dead circuit, power tripping and emergency electrician guides — reading the board, safe reset steps, the lost phase, and prices.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

My whole house has no power. What should I check first?
Look outside. If the neighbours and street lights are dark too, it is a TNB supply interruption; TNB's contact page gives 15454 for outages or breakdowns. If only your house is dark, check the distribution board.
The main switch or RCCB has tripped. Can I reset it?
Once, with dry hands. If it will not hold, switch off all the MCBs, reset, and switch them on one at a time. If it still trips, leave it off and call an electrician.
Nothing has tripped but only my house has no power. Why?
The fault is between the street and your main switch: the main switch itself, the cable to the board, or TNB's cut-out, meter or service cable. An electrician can test which side it is.
Can an electrician fix TNB's meter or fuse?
No. TNB's FAQ says any changes to TNB's meter or fuse are strictly prohibited. Faults on TNB's side are for TNB.
Why is only part of my house dark?
On a three-phase supply, losing one phase kills all the circuits on it while the rest works. It can be inside the house or on TNB's side.
How much does it cost to find the fault?
ClickBina's guides list a fault-finding call-out at RM150–RM400 and replacing a faulty RCCB or MCB at RM250–RM600 (indicative 2026, Klang Valley).
What should I switch off during a power cut?
Aircon, water heaters and other heavy appliances, and unplug electronics if there is a storm, so everything does not start at once when power returns.

Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides