Concealed wiring looks clean only if the chase is planned, cut and filled properly. Here is how it should be done.
📍 We serve KL, Selangor & Putrajaya.

Wall chasing means cutting a groove into a wall so a conduit or pipe can sit inside it, then filling it flush. Done well, the chase runs straight up or across from the point it serves, avoids beams, columns and slabs, is cut with a chaser rather than hacked, and is filled in layers with a mesh over the joint so it does not crack through the paint. The cost usually sits inside the wiring or plumbing price: ClickBina's first-fix guide lists a new wiring point at RM120 – RM250 per point (indicative 2026, Klang Valley). The patching and repaint afterwards are what most quotes leave vague.
Concealed wiring and piping look clean because the conduits and pipes sit inside the wall instead of on its surface. To get them there, the wall is cut with a groove, called a chase, the conduit or pipe is fixed into it, and the groove is filled and plastered over. It is one of the dustiest and noisiest parts of a renovation, and one of the most common sources of cracks that appear in new paint a few months later.
Chasing is part of first fix. ClickBina's guide to electrical first fix and second fix explains where it sits in the order of works: after the layout is fixed, before plastering, tiling and ceilings close.
Most chasing problems are planning problems. Before the first cut, the positions of every socket, switch, light point, aircon point and tap should be marked on the wall and agreed. Once the positions are fixed, the routes follow a few simple rules:
A route record matters more than most owners think. The next person to hang a TV or a cabinet will drill into that wall, and a nail through a hidden cable or pipe is a much bigger job than the chase ever was.
Not every wall can take a chase. Reinforced concrete beams, columns and slabs carry the building, and cutting into them can expose or cut the steel inside. ClickBina's wall hacking guide explains how to tell a load-bearing wall from a partition, and in a strata building the management's renovation rules usually forbid cutting into structural elements.
| Wall or element | Chasing? | What to do instead |
|---|---|---|
| Brick partition wall | Usually fine, with care | Chase with a wall chaser; keep runs straight |
| Lightweight block (AAC) partition | Possible, gently | Shallow, clean cuts; the block is softer and breaks away easily |
| Drywall / board partition | No chase needed | Run cables inside the stud cavity before the board goes on |
| Reinforced concrete column or beam | No | Route around it, or use surface trunking or the ceiling space |
| Concrete floor slab | Only as the engineer and management allow | Run services in the screed or ceiling, as planned |
| Party wall with a neighbour | With caution | Keep chases shallow; vibration and dust reach next door |
A proper chase is cut, not hacked. A wall chaser, a twin-blade cutter with dust extraction, cuts two clean parallel lines, and the core between them is removed with a chisel. The result is a neat groove the right size for the conduit. Hacking a groove out with a hammer and chisel alone shakes the wall, breaks off more plaster than needed and leaves a ragged hole that takes much more filling.
The chase should be only as deep and wide as the conduit or pipe needs plus room for a good covering of mortar. Cutting too deep weakens the wall; cutting too shallow leaves the conduit so close to the surface that the plaster over it cracks.
Chasing is loud and very dusty. Before it starts, cover or remove furniture, seal doors to rooms that are not being worked on, protect the aircon indoor units, and cover floor traps and drains so debris does not wash into the pipes. Dust extraction on the chaser helps a great deal.
In a condo, chasing counts as noisy work, so it has to fit the management's permitted hours, and neighbours on the other side of a shared wall will hear every cut. ClickBina's guide to adding power points also compares concealed and surface wiring for smaller jobs where chasing is more disruption than it is worth.
Cables should run inside conduit, not be buried loose in plaster, so they can be replaced later without cutting the wall again. The conduit or pipe is fixed firmly into the chase with clips or mortar dabs so it does not move while the chase is filled. Water pipes are pressure-tested before they are covered; wiring is checked for continuity. Once the chase is closed, a fault inside it means cutting the wall again.
ClickBina's guide to patching walls before repainting explains the most common failure: a chase filled too thick in one go, or allowed to dry too fast, cracks along its length later. The fix is in the method:
Concealed is not always right. Surface trunking or casing is quicker, quieter, needs no patching and is easy to change later. It makes sense for a single extra socket, for a rental unit, on concrete columns and beams that cannot be chased, and in a condo where noisy work is limited. ClickBina's guide to boxing up aircon trunking shows how surface runs can be made neat.
Chasing is rarely priced on its own; it sits inside the wiring or plumbing price, with the patching and repaint as separate lines. These are ClickBina's published figures (indicative 2026, Klang Valley).
| Work | Indicative price | Source guide |
|---|---|---|
| New wiring point or lighting circuit | RM120 – RM250 per point | Electrical first fix / second fix guide |
| Full rewire, single-storey terrace house | RM8,000 – RM15,000 | House rewiring cost guide |
| Repaint touch-up, condo (scuffs, patches, one stained wall) | RM400 – RM900 | Patching walls guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteAsk the quote to say who fills and skims the chases and who repaints the affected walls. Those are the lines most often left out.
WhatsApp us your job details for a quote: the property type, which rooms need new points or pipes, and whether the walls are brick, block or board. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so the chasing, the wiring or plumbing, the filling and the repaint can be sequenced as one job. We reply within the hour, and the price we agree is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.