Whether to just roof the back yard or build it into the house, how to keep a covered yard good for drying, and what each costs.
📍 We serve KL, Selangor & Putrajaya.

A roof cover keeps rain off the back yard but leaves it open to air, which is what you want for drying laundry and a simple outdoor wash area. A full extension builds walls, a roof and a floor to make an enclosed room such as a wet kitchen, and costs many times more, takes longer and goes through council approval. Either way, roofing over the open space at the back of a house needs the council's written approval under the building by-laws. ClickBina's awning guide puts a polycarbonate back-yard awning of 3 m × 5 m at RM2,000 – RM4,000, while its rear extension guide lists a basic rear room at RM18,000 – RM50,000 (indicative 2026, Klang Valley).
Most terrace and semi-D houses have an open yard behind the kitchen. Owners usually want one of two things from it: shelter, so laundry, the washing machine and the outdoor sink stay dry, or more house, so the yard becomes a wet kitchen, a store or a utility room.
| Roof cover (awning) | Full extension | |
|---|---|---|
| What you get | Shelter from rain and sun; still open to air | An enclosed room: wet kitchen, store, utility room |
| Drying laundry | Good: air moves through | Poor unless it has a dedicated ventilated drying area |
| Security | Same as the yard today unless grilles are added | Better: walls, windows and a lockable door |
| Approval | Council written approval for roofing the open space | Building plans and council approval |
| Build time | Days, once the frame is fabricated | Weeks to months, plus the approval period |
| Cost | A few thousand ringgit | Tens of thousands of ringgit |
| Effect on light and air to the house | Reduced light under the roof; translucent sheets help | Back rooms can become darker and stuffier |
The open space at the back of a terrace house is not spare land. ClickBina's rear kitchen extension guide explains that the building by-laws do not allow that open space to be built over, or roofed over so that it shrinks, without the council's written approval. The council may allow it where air can still move freely through the space. In practice, a covered rear yard is a planning question from the first sketch.
Under a roof, clothes dry mostly by moving air, not by direct sun. A covered drying yard works when the air can move and some light comes through.
Planning the budget? The Attic Conversion Cost Calculator shows the published range for the use you have in mind for the attic, so you can see the range before anyone quotes.
| Detail | Why it matters | What to ask for |
|---|---|---|
| Sheet type | Polycarbonate lets light through; metal deck or zinc is opaque and louder in rain | Translucent over drying areas; consider noise near bedrooms |
| Fall | A flat roof holds water and leaks | A clear slope away from the house, stated in writing |
| Gutter and downpipe | Water off the roof needs somewhere to go | A gutter to a drain, not onto the yard floor |
| Joint with the house wall | The most common leak on any awning | A proper flashing, not sealant alone |
| Frame and fixings | Rust and loose anchors fail first | Galvanised or treated steel, or aluminium; correct wall anchors |
| Posts and footings | Posts on the drain cover or soft ground move | Posts on proper footings inside your lot |
Rain noise on a metal roof close to the kitchen and bedrooms is a common complaint; our noisy metal roof guide explains the fixes. For the wall joint, see the awning wall-joint leak guide.
An extension next to a back drain has its own foundation, party wall and drainage questions, all covered in the rear kitchen extension guide; plan the kitchen itself with our wet kitchen design guide.
These are ClickBina's published figures (indicative 2026, Klang Valley).
| Item | Indicative price | Source guide |
|---|---|---|
| Back-yard awning, 3 m × 5 m, polycarbonate | RM2,000 – RM4,000 | Awning cost guide |
| Drying-yard awning, 2 m × 3 m, polycarbonate | RM1,200 – RM2,200 | Awning cost guide |
| Polycarbonate sheet awning, per metre run | RM350 – RM700 | Awning cost guide |
| Corrugated zinc / metal awning, per metre run | RM250 – RM500 | Awning cost guide |
| Gutter and downpipe for an awning | RM200 – RM800 | Awning cost guide |
| Basic rear room (brick walls, simple roof and finishes) | RM18,000 – RM50,000 | Rear kitchen extension guide |
| Full rear extension (tiling, electrical, plumbing) | RM40,000 – RM120,000 | Rear kitchen extension guide |
| Mid-range enclosed wet kitchen | RM25,000 – RM40,000 | Rear kitchen extension guide |
| Plans by an architect or draughtsman | RM3,000 – RM10,000 | Rear kitchen extension guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteA roof cover now does not stop an extension later, but the frame, posts and gutter of an awning are rarely reused in a brick extension, so do not over-spend on a cover you expect to replace soon.
| If you mainly want to... | Usually choose |
|---|---|
| Dry laundry out of the rain | Roof cover with open sides and a translucent roof |
| Keep the washing machine and sink dry | Roof cover, with a power point and a drain |
| Cook heavy food without smoke in the house | Full extension as a ventilated wet kitchen |
| Stop people coming in from the back lane | Grilles on a roof cover, or a full extension |
| Add storage that stays dry and clean | Full extension, or a roof cover with a store cabinet |
| Spend as little as possible this year | Roof cover |
WhatsApp us your job details for a quote using the list above. ClickBina builds awnings, roof covers and renovation works across KL and Selangor and coordinates the trades for whole-house refurbishment, so a roof, racks, power points and plumbing can be planned as one job. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.