Footings, slab, the joint to the old house, roof and services all disappear as the extension goes up. What an owner should check at each stage, and who checks the rest.
📍 We serve KL, Selangor & Putrajaya.

A house extension in Malaysia is inspected by more than one party: the council and the submitting person look after approval and structure, while the owner should check, stage by stage, that what is built matches the approved plan and the quotation. The stages that matter most are the ones that disappear: footings, ground slab, the joint to the old house, roof framing and the services inside walls and ceilings. To arrange an outside check at those points, see renovation inspection.
An extension at the back or side of a terrace, semi-D or bungalow is a small building project, not a room makeover. That changes who looks at it. The local council grants permission and may visit. A qualified submitting person signs the plans and is responsible for the design they certified. The contractor builds. Each of those parties looks at a different question, and none of them is there to ask whether you got the finishes, sizes and materials you paid for.
It helps to separate the three kinds of check before work starts, so nobody assumes somebody else is watching:
| Check | Who carries it | What it answers |
|---|---|---|
| Approval and compliance | Council, with the submitting person | Is the building allowed, and is it being built to the approved plan? |
| Structural design and its execution | The professional who designed the structure | Are the foundations, columns, beams and slab built as designed? |
| Workmanship against the contract | The owner, or a third party the owner brings in | Do the materials, sizes, levels, falls and finishes match what was quoted? |
This guide is about the third row, and about making sure the first two actually happen.
The first inspection is a desk check, and it saves more trouble than any site visit. Put the approved plan, the structural drawings and the contractor's quotation side by side and read them as one set. The footprint, height and roof line on the quotation should be the ones on the approved plan, not a bigger version agreed verbally on site. If the quotation mentions items the plan does not show, such as an extra toilet or a roof terrace, ask whether the approval covers them.
Under the Street, Drainage and Building Act 1974, no person may erect a building without the council's prior written permission, and the plans go in through a principal submitting person or submitting person. Whatever route your council uses, what matters at this stage is that you hold a copy of what was approved before the first hole is dug. The council may give written notice of any deviation from the approved plan and order it rectified, so the plan is the baseline for every later check.
Check the builder as well as the drawings. Ask for the contractor's company details and look them up on the CIDB contractor search before you sign. Registration does not prove the work will be good, but it tells you who you are dealing with.
An extension is built against a house that already has cracks, damp patches and tired paint. Before the old rear wall is opened, walk the rooms next to it and the neighbours' side if they allow it, and keep your own dated photo log of every existing crack, stain and uneven tile. Without that record, a crack that appears in the kitchen during piling becomes an argument about whether it was already there.
Note the drains, gully traps and manholes at the back too. They are often relocated or covered during an extension, and a blocked or broken drain is far easier to raise while the trench is still open.
Every extension follows roughly the same sequence. The column on the right is the reason a check at that point is worth the trouble:
| Stage | What to look at before moving on | Why it cannot wait |
|---|---|---|
| Setting out | Position against the boundary, the drain and the approved footprint | Moving a wall later means demolition |
| Excavation and footings or pile caps | Depth and size against the drawing, clean bases, no standing water | Covered by concrete within days |
| Ground beams and slab | Reinforcement as drawn, damp-proof sheet, levels and the link to the old slab | Hidden under screed and tiles |
| Columns, beams and walls | Line, plumb, wall ties into the old wall, lintels over openings | Plaster hides the joint to the old house |
| Roof framing | Truss or rafter layout as drawn, fixings, the junction with the old roof | Ceiling boards close it off |
| Services rough-in | Pipe routes, falls, sleeves through walls, conduit positions | Buried in walls, slab and ceiling |
| Waterproofing in wet areas | Membrane coverage and a water test before tiling | Tiles go on top |
| Finishes and handover | Tiles, paint, doors, windows, roof drainage, clean-up | Last chance before final payment |
The structural rows are not a list for an owner to sign off. They are moments to ask the contractor whether the professional responsible for the structure has seen the work, and to hold the next payment until the answer is yes.
What goes into the ground decides whether the extension settles away from the house. The piling guide explains why the foundation design belongs to the engineer and not the contractor. Your role at this stage is practical: be on site, or have someone there, when the excavation is open and before concrete arrives.
A crack, sagging beam or removed wall that may affect the structure needs a professional engineer's assessment. If the contractor proposes a change to the foundation on site, ask for it in writing from whoever designed it, not as a verbal instruction from the foreman.
Most extension complaints in the Klang Valley start where the new structure meets the old one. The two parts sit on different foundations and were built years apart, so they move differently. A long crack down the junction, a step in the floor tiles or a leak where the new roof meets the old wall are the usual results when the joint is treated as an afterthought.
While the walls are still bare, look at how the new walls are tied or separated from the old ones, and how the floor slabs meet. Ask the contractor what the drawing says about this joint, and whether it will be a movement joint, a tied joint or a flashing detail at roof level. The answer should come from the design, not from habit.
Once the walls are up and the roof is on, the extension starts to look finished, and that is when owners stop visiting. It is the wrong time to stop. Before the ceiling boards go up, check the roof framing against the drawing, look at how the new roof covering laps under or over the old one, and make sure the gutter and downpipes are on the plan rather than improvised at the end. If the existing roof is being stripped and re-laid at the same time, the guide to inspecting roof replacement works covers that part.
Lintels over new doors and windows, and the beam that replaces the old rear wall, are structural. Note anything that looks bowed or cracked and raise it with the contractor in writing, so the professional responsible can look at it.
Extensions often add a wet kitchen, a toilet or a laundry area, so pipes and drains run through new slabs and walls. Before anything is covered, follow each pipe from fitting to outlet and ask where it ends: into the existing drain, a new inspection chamber or the back lane drain. Water pipes should be tested under pressure before the walls are closed; ask to see it done.
For electrical work, you can check that the conduit runs and point positions match the layout you agreed, and ask for the test results and certificate when the installation is finished. Any repair or change to the electrical installation must be done by an electrical contractor registered with Suruhanjaya Tenaga. The electrical rough-in check lists what an owner can look at without touching the installation.
Wet areas need a water test on the waterproofing before tiles go on; the flood test guide explains how to watch one.
The council is not a passive stamp. Section 70D of Act 133 allows the local authority, or a person it authorises, to inspect a building under construction at any stage, give written notice of any deviation from the approved plan, and order it rectified. Under the Uniform Building By-Laws, a notice of commencement is given in Form B before building operations begin, and a certificate of completion and compliance is issued by the principal submitting person once the council's technical conditions are met and the stage certifications have been received.
Which of these steps apply to your extension depends on your council and on the approval you were given. Ask your submitting person at the start which inspections and certificates your approval needs, and ask to be told before each one. Their sign-offs cover compliance and design; they do not replace your own check of finishes and quantities.
Extension contracts are usually paid in progress claims, and each claim lines up neatly with a stage in the table above. Write that link into the contract: each payment is released after the stage is checked and any items raised are put right. The progress claim check guide explains how to read a claim against the work actually done.
The Consumer Protection Act 1999, section 53, implies a guarantee that services are carried out with reasonable care and skill. How that applies to your contract and your contractor is a legal question; check with a lawyer or the Tribunal for Consumer Claims before relying on it.
For extensions in KL, Selangor and Putrajaya, we offer a third-party inspection of your contractor's work; if you want, we can also quote the repairs. We come at the stages you choose, compare the works with your approved plan, quotation and materials list, and go through what we found with you before the next payment. Design and compliance stay with the people who signed for them.
This page is general guidance, not legal or structural advice. Your approval conditions and your contract decide what applies to your extension.