Renovation Warranty Period: Defects to Check After Moving In
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🔍 Renovation Inspection

Renovation Warranty Period
Defects to Check After You Move In

The real test of a renovation is living in it. When to check, what to look for and how to notify your contractor while the warranty period is still open.

📍 We serve KL, Selangor & Putrajaya.

Renovated bathroom in morning light with a towel hanging on white wall tiles above dark skirting

Your renovation warranty period is the window, set by your own contract, in which the contractor has agreed to come back and put right defects in their work, so the time to check the house is while that window is still open, not after it closes. Many renovation faults only show once you live in the house: a shower that leaks after weeks of use, a door that drops, a crack after the first dry spell. Plan two checks, one after you have settled in and one well before the period ends. To book a check in the Klang Valley, see renovation inspection.

What a renovation warranty period actually is

A renovation warranty, sometimes written as a defects period or defects liability period in the contract, is a promise by your contractor to return and rectify faults in their own work for a set time after handover. There is no single standard length for home renovations in Malaysia. The period, what it covers and how you must notify the contractor are whatever your quotation, contract or warranty letter says, which is why the first step is to read those papers again.

Two things surprise owners. First, different trades often carry different periods on the same job; waterproofing, carpentry hardware and general workmanship may each have their own terms. Second, the clock usually starts at handover, not on the day you move in, so a family that waits a few weeks for furniture has already used part of it.

Your contractor's period is not the developer's DLP

Owners who bought a new home sometimes assume the developer's defect liability period covers the renovation too. It does not. The developer answers for the house as delivered; your contractor answers for what they changed. Mixing the two is how claims fall between them:

Developer's defect liability periodYour renovation contractor's period
Where it comes fromYour sale and purchase agreement for a new homeYour renovation quotation, contract or warranty letter
What it coversThe house as the developer handed it overThe work your contractor did, and only that
When it startsAs your sale and purchase agreement statesUsually from handover of the renovation
Who you notifyThe developerThe contractor, or the ID firm that signed with you
What breaks itRenovation may complicate claims on altered areasOther trades later working on the same area

If you renovated a new home, both periods may be running at once. The final defect inspection before the DLP ends guide covers the developer's side; this page covers your contractor's.

Find your dates and write them down

Spend half an hour with your paperwork before anything else. Look for these, and note each date in your phone calendar with a reminder well ahead of it:

  • The handover date, from the handover form or the message in which the contractor declared the job finished.
  • The length of the general workmanship warranty, and whether it is stated per trade.
  • Any separate warranty letter for waterproofing, roofing or specialist work, with its own start date.
  • Manufacturers' product warranties for fittings, appliances and boards, which run separately from workmanship.
  • The notification clause: whether defects must be reported in writing, to whom, and how quickly.
  • Any retention sum you are holding and the condition for releasing it.

If nothing is written down, the period is unclear rather than absent; ask the contractor to confirm in a message what they will cover and until when. The handover documents checklist lists the papers worth collecting at the end of any job.

Defects that only show after you move in

Handover day shows a clean, dry, unused house. Daily life is the real test. These are the faults that most often surface in the months after you move in, and what tends to bring them out:

AreaWhat appearsWhat usually brings it out
BathroomsDamp skirting outside the door, stains on the ceiling below, loose groutWeeks of daily showers rather than a quick test
Wet kitchenSwelling at the base of cabinets, a damp smell under the sinkRegular washing up and mopping
FloorsHollow-sounding or lifting tiles, gaps opening in vinyl or laminateHeat, aircon cycles and furniture load
Walls and ceilingsHairline cracks at new wall joints and board edgesThe first dry spell after wet weather
CarpentryDoors that drop or rub, drawers that stick, hinges working looseOpening and closing every day
Roof and windowsStains at frames, drips at the roof edgeThe first heavy storm
AirconWater dripping from the indoor unit, a damp patch along the pipe runLong hours of running

Some of these are minor and expected, such as a hairline crack in fresh plaster; others are a sign that something underneath was done badly. The guides to cracks after renovation and to a ceiling leak after renovation help you tell which is which.

Keep a defects log from the day you move in

The owners who get defects fixed are the ones with a tidy record. Start a simple log on the first night: the date, the room, what you noticed and what you were doing when you noticed it. Add your own pictures to your phone album with the date in the file name. Do not wait for a long list before telling the contractor about a leak; water damage spreads, and a late report invites the argument that you let it get worse.

For smaller items, a running list is fine. When the time comes to notify, turn it into one numbered list per room. The guide on how to write a renovation defect list shows a layout contractors find easy to act on.

The first check: after the house has been lived in

Book or do the first structured check once the house has had real use: a few weeks of showers and cooking, and ideally one heavy rainstorm. Walk every room in the same order. Run every tap and shower for several minutes and look at the floor outside and the ceiling below. Open and close every door, drawer and window. Tap floor tiles across each room. Look along walls with a torch held flat to catch new cracks.

Electrical items deserve a look too, as reader checks only: lights that flicker, a trip switch that keeps tripping, a switch plate that feels warm. Note them and tell the contractor; do not open anything up yourself. Any repair or change to the electrical installation must be done by an electrical contractor registered with Suruhanjaya Tenaga.

The final check, well before the period ends

This is the check that matters most, and the most common mistake is leaving it until the last week. The contractor needs time to inspect, order materials and send a crew, and the clause in many contracts is about when you notified, not when they repaired. Aim to finish your final walk with enough time left for at least one round of repairs and a re-check before the end date.

Treat it as a full home warranty inspection of the renovated areas: every wet area, every built-in, every new floor and ceiling, the roof and windows if they were part of the job. Compare what you find with your log from the first check, so you can see which items are new, which are worse and which were never fixed.

Re-check the contractor's earlier repairs

A repair carried out during the period is itself new work. A re-grouted shower can leak again, a re-hung door can drop again, and patched plaster can crack along the patch. On the final walk, go back to every item from earlier notifications and look at it as if it were new. Ask the contractor whether repairs carry their own fresh period or end with the original one; the answer depends on your contract, so get it in writing.

Notify the contractor in writing, and keep proof

However friendly the relationship, put every defect notice in writing, by message or letter, with the date, the numbered list and a request for a repair date. Keep the contractor's reply. If they do not answer, send a polite reminder that states the period end date and the items outstanding. What counts is that the notice was given in time, and a dated message is the simplest proof.

If the contractor stops responding or refuses, the guide on what to do when a contractor won't fix renovation defects sets out the escalation steps.

Tie the retention money to the final check

If your contract holds back a retention sum until the end of the defects period, that money is your leverage. Release it only after the final check is done and the items on it are rectified and re-checked. If there was no retention, any balance still unpaid plays the same role. The retention release guide explains how to agree the release fairly.

Your first tool is the contract itself. Beyond it, the Consumer Protection Act 1999 applies to services supplied to consumers in trade (section 2), and section 53 implies a guarantee that services are carried out with reasonable care and skill and that materials supplied with them are fit for their purpose. The Contracts Act 1950, section 74, entitles a party who suffers by a breach of contract to compensation for loss or damage that naturally arose from it.

Neither law sets a renovation warranty length, and how they apply to a defect found after your contract period depends on the facts. A well-kept log and a timely written notice help whichever route you take. Check with the Tribunal for Consumer Claims or a lawyer before relying on any of it.

How ClickBina fits in

For owners in KL, Selangor and Putrajaya, what we offer is a third-party inspection of your contractor's work; if you want, we can also quote the repairs. We walk the renovated areas against your quotation, drawings and defects log, room by room, and we go through what we found with you in time for you to notify your contractor before the period ends.

Sources & references

This page is general guidance, not legal advice. Your rights depend on your contract and the facts of the job.

Want a second pair of eyes on your renovation?

WhatsApp us to book a renovation inspection — we reply within the hour. Third-party inspection of your contractor's work; if you want, we can also quote the repairs. Any visit fee is confirmed with you on WhatsApp before we come. We cover KL, Selangor & Putrajaya.

💬 Book a renovation inspection
Reply within the hourVisit fee confirmed before we comeKL, Selangor & Putrajaya

Common Questions

How long is a renovation warranty in Malaysia?
There is no single legal length for home renovations. It is whatever your quotation, contract or warranty letter states, and different trades on the same job can carry different periods.
When does the warranty period start?
Usually from handover of the renovation, not the day you move in. Check the wording in your contract and note the handover date from your handover form or the contractor's message.
When should I check the house for defects?
Twice: once after the house has had real use, including a heavy rainstorm, and again early enough before the period ends to leave time for repairs and a re-check.
Does the developer's DLP cover my renovation?
No. The developer answers for the house as delivered. Defects in work your own contractor did are for that contractor, under your agreement with them.
What if a defect appears after the period ends?
It may still be worth raising with the contractor, and the law may still help depending on the facts. Ask the Tribunal for Consumer Claims or a lawyer whether your situation fits.
Should I tell the contractor about a leak straight away?
Yes. Notify any leak in writing as soon as you see it rather than saving it for a list. Water damage spreads, and a late notice invites the argument that the delay made it worse.
Do repaired items get a new warranty?
It depends on your contract. Ask the contractor in writing whether repairs carry their own period or end with the original one.