A new unit cools on its first day however it was fitted. Here is how to check the drain, the insulation, the wall hole and the bracket before the installer is paid.
📍 We serve KL, Selangor & Putrajaya.

An aircon installation check is a walk-round of the finished job before the installer is paid and gone: the indoor unit level and firmly fixed, the condensate drain falling all the way to a proper outlet, insulation unbroken along the copper lines, the wall hole sealed, the outdoor unit on a solid bracket with room to breathe, and the steps the installer took before switching on. Most leaks, drips and noisy units trace back to one of these. For an outside check of the aircon work inside a larger renovation, see renovation inspection.
A new split unit cools on the first day almost no matter how it was installed. That is the trouble: the faults of a rushed installation show up later, as water running down the wall on a humid night, a rattle from the ledge, a stained facade or a unit that slowly loses its cooling. By then the installer has been paid, the trunking is painted and the question becomes whose fault it is.
The checks below are about workmanship: how the unit, pipes, drain and bracket were put in. They do not cover choosing a unit or what the job should cost, which are separate questions to settle before the installer is booked. They also assume the piping is new. If you are connecting units to copper a developer pre-installed in a new condo, the pre-installed piping check comes first.
Do the main walk-round while the installer is still on site, after the unit has been switched on and has run long enough to produce water at the drain. That way any question gets an answer from the person who did the work, and small fixes take minutes rather than a second visit.
Then look again after the unit has run through a long, humid evening, which is when the condensate drain and the insulation are tested hardest. A drip that only appears after hours of running is a drain fall or an insulation gap, not bad luck. Note the date and tell the installer in writing as soon as you see it.
| Part | Good workmanship looks like | Warning sign |
|---|---|---|
| Indoor unit | Level along its length, tight to the wall, clear space above for air and the filters | One end lower than the other, a gap behind the unit, the top jammed against the ceiling |
| Condensate drain | Falls all the way from the unit to its outlet, with no dips or upward loops | Water dripping from the unit's tray, or a drain hose sagging in the trunking |
| Copper lines | Each line sleeved in insulation from the unit to the outdoor unit, joints taped | Bare copper at the bends, foam split or slid back at the wall |
| Wall hole | Sleeved, sealed around the bundle, sloping slightly to the outside | An open gap around the pipes, or stains on the inside wall below |
| Trunking | Straight, fixed at regular points, lids clipped shut, ends neatly finished | Trunking bowing off the wall or lids that spring open |
| Outdoor unit and bracket | A bracket bolted firmly to sound wall, the unit level and fixed to the bracket, open air in front of the fan | A bracket that flexes, a unit that rocks, the fan facing a wall close by |
| Drain outlet | Into a floor drain, gutter or the outlet the building allows | Water running down the facade, onto a neighbour's ledge or across a walkway |
Stand back and look at the indoor unit against a straight line in the room, such as the ceiling or a window frame. It should sit level along its length, or with the very slight tilt towards the drain side that many manufacturers ask for in their installation manual. A unit that leans the wrong way pools water at the far end of its tray, and that water eventually comes out of the front.
Press gently on the bottom edge. The unit should not move on its mounting plate or lift away from the wall. There should be enough room above it to slide the filters out and for air to enter the top grille, and it should not blow straight onto a bed head or a desk chair. If a plaster ceiling was built after the unit was planned, check that the ceiling did not end up pressing on the top of the unit.
Every split unit makes water, and all of it has to leave by gravity unless a pump was fitted. The drain hose should fall continuously from the unit to its outlet. Any section that runs uphill, or sags into a dip inside the trunking, will hold water, grow slime and eventually overflow at the unit. On a long or flat run, ask the installer to show you the route before the trunking lids go on.
Follow the drain to where it ends. On a condo ledge it should go into the drain point the building provides, not onto the ledge floor or down the facade. On a landed house it should end at a floor drain or gutter, not on a walkway or against the neighbour's wall. If the unit sits below its outlet, it needs a pump, and the condensate pump guide explains when that is the right answer. For water that shows up indoors, the guide to a leaking aircon sets out the usual causes.
Good aircon piping installation is mostly about what you cannot see once the trunking is closed, so look before it is. Each copper line should be sleeved in insulation for its whole length, including the bends and the short exposed section at the back of the indoor unit. Joints in the foam should be butted and taped, not left gaping. Where the bundle passes through the wall, the insulation should carry on through the hole rather than stop at the wall face.
Bends should be smooth curves, not kinks. A flattened bend restricts the gas and makes the unit work harder for the rest of its life. Any spare length should be laid neatly, not coiled in a tight loop in the ceiling. The pipe insulation guide explains why a short bare section is enough to cause a steady drip in a humid climate.
The hole through the wall is a small detail that causes a lot of damp walls. It should be no bigger than the bundle needs, lined with a sleeve, sealed around the pipes with a sealant that stays flexible, and angled slightly downward to the outside so rain cannot run in. Look at the outside face as well: an unsealed hole on an exposed wall lets wind-driven rain track along the pipes into the room. The guide to leaks at the trunking and wall hole shows what that damage looks like.
Trunking should run straight and level, fixed to the wall at regular points so it does not bow, with the lids clipped firmly shut. Neat ends and corners are a reasonable sign of a careful installer. Trunking that is painted to match the wall is fine, but ask for it to be painted only after the drain has been seen to work.
The aircon bracket carries a heavy, vibrating unit for many years, often over a drop. Look at how it is fixed: anchors set into sound brick or concrete, not into crumbling render or the edge of a ledge, with every fixing hole used. The unit should be bolted to the bracket, ideally on rubber pads, and should not rock when you press on its top. Rust on a new bracket, bent arms or missing bolts are reasons to ask questions before you pay.
Then check the space around it. The fan needs open air in front, and the unit needs space at the back and sides to draw air through the coil. A unit boxed into a narrow ledge recirculates its own hot air and cools badly. Ask how a technician will reach it for servicing. The outdoor unit placement guide covers what condo ledges and landed houses each allow.
Most split units need their own supply from the distribution board, and larger units may need more than an ordinary point. You can check what is visible: the isolator near the outdoor unit is fixed and closed, cables to the outdoor unit are protected rather than hanging loose, and nothing trips or feels warm after an hour of running. Ask the installer which supply the unit is on and whether it was added for this installation.
Do not open the isolator or the board yourself. Any repair or change to the electrical installation must be done by an electrical contractor registered with Suruhanjaya Tenaga. If the supply was added during a renovation, the electrical rough-in check shows what to look at before the ceiling hides it.
A careful installer does a few things between connecting the pipes and handing the remote over. You may not see all of them, so ask:
| Step | Why it matters | What to ask |
|---|---|---|
| Pressure and leak check on the joints | A leaking flare loses gas slowly and the unit stops cooling | How were the joints checked, and what was the result? |
| Vacuum before releasing the gas | Moisture and air left in the lines shorten the life of the system | Was the system vacuumed, and for how long? |
| Water poured into the indoor tray | Proves the drain falls all the way to the outlet | Can you show me the water reaching the outlet? |
| Test run in cooling mode | Confirms cold air, a quiet fan and no vibration | Can we run it together for a while before you leave? |
| Clean-up | Dust, offcuts and foam scraps left in the trunking or ceiling | Have the work area and the ledge been cleared? |
Ask for the answers in writing, with the unit and room named, and keep the installer's warranty card or letter with the unit's manual. If you told the installer what the unit had to do, such as the room it had to cool, the Consumer Protection Act 1999 implies in section 54 that the service should be reasonably fit for that purpose, alongside the section 53 duty of reasonable care and skill. Whether that helps in your case depends on the facts, so check with the Tribunal or a lawyer before relying on it.
When the aircon goes in during a renovation, the order of work matters as much as the installation. Concealed pipes and drains must be tested before the wall is plastered or the ceiling closed, which the concealed aircon piping guide explains. Indoor units should be hung after the dusty trades are finished, or wrapped while they work, and the outdoor bracket should go up before the facade is repainted. If several trades share a ceiling, check that the drain route and any access panel survived the ceiling contractor's work.
When the aircon is one trade among many in a renovation, owners sometimes want the whole job looked at before the last payment. What we offer is a third-party inspection of your contractor's work; if you want, we can also quote the repairs. We walk the works against your quotation, drawings and materials list, room by room, and we go through what we found with you.
This page is general guidance for homeowners, not technical or legal advice.