A new window can look perfect and still leak in the first storm. What to look at while the frame is still open, and what to test before you sign off.
📍 We serve KL, Selangor & Putrajaya.

A window installation is checked at two moments: when the frame is fixed in the opening but before the gap around it is filled and plastered, and again at handover, when every sash, roller and lock can be operated and the sill can be tested with water. The frame must sit plumb and square, the perimeter must be packed and sealed all round, and the sill must shed water outwards. Sliding door installation adds the threshold and track. For an outside check of your contractor's work in the Klang Valley, see renovation inspection.
A window or sliding door is made in a workshop to a measured size, then fitted into an opening that another trade built. Most problems on a renovation come from that hand-over between trades: an opening that is out of square, a frame packed on one side only, a perimeter gap stuffed with mortar and painted over, or a sill laid flat because the tiler finished before the fabricator arrived.
None of these is obvious on the day. A new window opens and closes, the glass is clean and the frame looks straight from the room. The first heavy afternoon storm is what tests it, and by then the plasterer and painter have closed the edges. The aim of the check is to see the joint between the frame and the wall while it is still open.
This is different from inspecting a developer's windows. The window defects checklist for vacant possession is written for windows you never saw installed; in a renovation you can be there while it happens.
Two things decide most of the result before a frame arrives: the opening and the paperwork.
Enlarging an opening in a wall is a structural question as well as a joinery one; the guide to lintels above doors and windows explains why. A crack, sagging beam or removed wall that may affect the structure needs a professional engineer's assessment.
Ask the installer to tell you when the frames are fixed and before the gaps are filled. This is the visit that matters most. Look at each frame and ask about anything that differs from the list below.
| Look at | Sign of good work | Sign to raise before the gap is closed |
|---|---|---|
| Plumb and level | Frame sides vertical and head level against a spirit level | A frame that follows a crooked opening |
| Square | Both diagonals of the frame measure the same | Diagonals that differ, sashes that rub on one corner |
| Fixings | Frame screwed or anchored into the wall at intervals along each side | Frame held only by foam, mortar or packing |
| Packing | Packers at the fixing points so the frame is not bowed | A frame pulled in where a screw was overtightened |
| Perimeter gap | An even gap all round, ready to be filled and sealed | Wide on one side, tight on the other |
| Drainage slots | Weep slots in the bottom track left open | Slots blocked by mortar, foam or the protective film |
Keep your own photo log of each frame from inside and out before the gap is filled; once plaster and sealant cover it, nobody can see how the frame was fixed. The stage checks before work is covered follow the same idea for other trades.
Water rarely comes through a new window's glass. It comes round the frame. Once the gap has been filled and finished, check the outside of each window where you can reach it safely:
If an older window in the house already leaks, that is a repair rather than an installation check, and the window leak repair guide covers the entry paths.
A sliding door to a balcony, yard or garden is the opening most likely to take water, because it sits at floor level with rain falling straight onto it. The checks are the same as a window plus three more:
| Check | What you want to see | Why it matters |
|---|---|---|
| Floor outside | Falls away from the door towards a floor trap or outlet | A flat or back-falling floor pools water against the track |
| Threshold | Bottom track set on a raised or recessed step, as agreed | A track flush with a wet floor overflows in a storm |
| Track drainage | Weep slots open and draining to the outside | Water collects in the track and spills inwards |
| Waterproofing | Balcony membrane taken under the threshold before tiling | The joint under the track is a common hidden leak |
| Interlock | Panels meet with the brushes or seals touching along their height | Gaps let wind-driven rain through |
| Rollers and stops | Panels slide smoothly and stop without hitting the frame | Rollers that drag wear out and drop the panel |
If the door already overflows on an older installation, the problem is one of drainage and level, and it is worth reading about how sliding door rollers wear and are replaced before blaming the frame.
At handover, open and close every sash and panel yourself, all the way, several times.
Grilles and awnings are often fitted by a different crew on the same frames; the grille and awning installation check covers their fixing and sealing.
Glass is the part of the order owners rarely check, because it all looks the same. Compare each panel with the quotation. Toughened glass usually carries a small permanent mark in one corner; laminated glass has an interlayer you can sometimes see at the edge. Ask the installer to point out the mark on each panel that is meant to be safety glass, especially in doors, low windows and bathroom panels.
Look along each pane for scratches, chips at the edges and haze under the protective film. Peel back a corner of the film if you need to. Scratches made during installation are hard to prove later, so list them before you sign off. The aluminium versus uPVC comparison explains what else to expect from each frame type.
Once the seals have cured, a simple water test on a dry day shows more than any visual check. With someone inside watching the frame corners and sill, run a garden hose gently over the head of the window, then the sides, then the sill, working upwards rather than spraying everywhere at once. Water inside the room, a damp patch on the plaster below the sill or water standing in the track all point to a fault to raise. In a condo, do this only where you can reach safely from inside, and never lean out.
A damp patch that appears below a window weeks later may be the window or the wall around it; the guide to a damp wall after renovation helps you tell which.
On a renovation the opening, the window, the tiling and the waterproofing are often by different people, and when a leak appears each one points at the next. Under the Consumer Protection Act 1999, section 57 gives a consumer a right of redress against a supplier of services that fails the implied guarantees. Section 58 then says there is no right of redress for some of those guarantees where the failure is due to an act, default or omission of a person other than the supplier.
In practice, that is a reason to keep the paperwork clear: who measured the opening, who supplied the units, who installed them and who sealed them. If you bought the windows yourself and paid only for fitting, the answer may be different again. How this applies to your job depends on your contracts; check with the Tribunal for Consumer Claims or a lawyer before relying on it.
In KL, Selangor and Putrajaya, we offer homeowners a third-party inspection of your contractor's work; if you want, we can also quote the repairs. We walk the new windows and doors against your quotation, drawings and order list, opening by opening, and we go through what we found with you. For windows in a house just handed over by a developer, see the new-home defect inspection page.
This page is general guidance, not legal advice. Your rights depend on your contract and the facts of the job.
WhatsApp us to book a renovation inspection — we reply within the hour. Third-party inspection of your contractor's work; if you want, we can also quote the repairs. Any visit fee is confirmed with you on WhatsApp before we come. We cover KL, Selangor & Putrajaya.
💬 Book a renovation inspectionTell us what you need — we reply within the hour.