Window Installation Check
New Windows and Sliding Door Installation in a Renovation

A new window can look perfect and still leak in the first storm. What to look at while the frame is still open, and what to test before you sign off.

📍 We serve KL, Selangor & Putrajaya.

New aluminium sliding door frame in a brick opening with a spirit level on the track

A window installation is checked at two moments: when the frame is fixed in the opening but before the gap around it is filled and plastered, and again at handover, when every sash, roller and lock can be operated and the sill can be tested with water. The frame must sit plumb and square, the perimeter must be packed and sealed all round, and the sill must shed water outwards. Sliding door installation adds the threshold and track. For an outside check of your contractor's work in the Klang Valley, see renovation inspection.

Why newly installed windows go wrong

A window or sliding door is made in a workshop to a measured size, then fitted into an opening that another trade built. Most problems on a renovation come from that hand-over between trades: an opening that is out of square, a frame packed on one side only, a perimeter gap stuffed with mortar and painted over, or a sill laid flat because the tiler finished before the fabricator arrived.

None of these is obvious on the day. A new window opens and closes, the glass is clean and the frame looks straight from the room. The first heavy afternoon storm is what tests it, and by then the plasterer and painter have closed the edges. The aim of the check is to see the joint between the frame and the wall while it is still open.

This is different from inspecting a developer's windows. The window defects checklist for vacant possession is written for windows you never saw installed; in a renovation you can be there while it happens.

Before installation: the opening and the order

Two things decide most of the result before a frame arrives: the opening and the paperwork.

  • The order. The quotation should name the frame system and finish, the glass type for each panel, the opening type, the hardware and locks, the colour, and whether old frames are removed and made good.
  • Who measures. The fabricator should measure the finished opening, not a drawing. If the opening is still being built, agree who is responsible if it ends up a different size.
  • The opening itself. A new or enlarged opening needs a lintel above it, and the sides should be straight and the base level enough to take a sill.
  • Condo approval. In a strata building the facade is usually controlled by the management. Check your by-laws on colour, material and opening type, and get the management office's approval in writing before ordering.

Enlarging an opening in a wall is a structural question as well as a joinery one; the guide to lintels above doors and windows explains why. A crack, sagging beam or removed wall that may affect the structure needs a professional engineer's assessment.

Frame stage: how the frame is fixed and packed

Ask the installer to tell you when the frames are fixed and before the gaps are filled. This is the visit that matters most. Look at each frame and ask about anything that differs from the list below.

Look atSign of good workSign to raise before the gap is closed
Plumb and levelFrame sides vertical and head level against a spirit levelA frame that follows a crooked opening
SquareBoth diagonals of the frame measure the sameDiagonals that differ, sashes that rub on one corner
FixingsFrame screwed or anchored into the wall at intervals along each sideFrame held only by foam, mortar or packing
PackingPackers at the fixing points so the frame is not bowedA frame pulled in where a screw was overtightened
Perimeter gapAn even gap all round, ready to be filled and sealedWide on one side, tight on the other
Drainage slotsWeep slots in the bottom track left openSlots blocked by mortar, foam or the protective film

Keep your own photo log of each frame from inside and out before the gap is filled; once plaster and sealant cover it, nobody can see how the frame was fixed. The stage checks before work is covered follow the same idea for other trades.

The perimeter seal and the sill

Water rarely comes through a new window's glass. It comes round the frame. Once the gap has been filled and finished, check the outside of each window where you can reach it safely:

  1. The perimeter seal runs continuously around the frame, with no gaps at the corners and no cracks where it meets the plaster.
  2. The seal is a flexible sealant, not plaster or paint bridging the gap.
  3. The external sill slopes away from the frame, and the frame sits on top of the sill rather than below it.
  4. The weep slots at the bottom of the frame are open and point outwards.
  5. Inside, the plaster return around the frame is straight and the seal between frame and plaster is neat.

If an older window in the house already leaks, that is a repair rather than an installation check, and the window leak repair guide covers the entry paths.

Sliding door installation: threshold, track and fall

A sliding door to a balcony, yard or garden is the opening most likely to take water, because it sits at floor level with rain falling straight onto it. The checks are the same as a window plus three more:

CheckWhat you want to seeWhy it matters
Floor outsideFalls away from the door towards a floor trap or outletA flat or back-falling floor pools water against the track
ThresholdBottom track set on a raised or recessed step, as agreedA track flush with a wet floor overflows in a storm
Track drainageWeep slots open and draining to the outsideWater collects in the track and spills inwards
WaterproofingBalcony membrane taken under the threshold before tilingThe joint under the track is a common hidden leak
InterlockPanels meet with the brushes or seals touching along their heightGaps let wind-driven rain through
Rollers and stopsPanels slide smoothly and stop without hitting the frameRollers that drag wear out and drop the panel

If the door already overflows on an older installation, the problem is one of drainage and level, and it is worth reading about how sliding door rollers wear and are replaced before blaming the frame.

Operation, locks and hardware

At handover, open and close every sash and panel yourself, all the way, several times.

  • Casement windows open without catching, stay where the friction stay holds them and close with even pressure.
  • Sliding windows run the whole length without sticking, and the panels do not rattle in a breeze.
  • Every lock and latch engages without forcing, and the keys are handed over and labelled.
  • Handles are tight and in the position on the drawings.
  • Window grilles, if fitted, do not stop any sash from opening fully or block an escape window.
  • Insect screens, if quoted, are fitted and slide freely.

Grilles and awnings are often fitted by a different crew on the same frames; the grille and awning installation check covers their fixing and sealing.

Glass: type, marking and damage

Glass is the part of the order owners rarely check, because it all looks the same. Compare each panel with the quotation. Toughened glass usually carries a small permanent mark in one corner; laminated glass has an interlayer you can sometimes see at the edge. Ask the installer to point out the mark on each panel that is meant to be safety glass, especially in doors, low windows and bathroom panels.

Look along each pane for scratches, chips at the edges and haze under the protective film. Peel back a corner of the film if you need to. Scratches made during installation are hard to prove later, so list them before you sign off. The aluminium versus uPVC comparison explains what else to expect from each frame type.

Testing with water before handover

Once the seals have cured, a simple water test on a dry day shows more than any visual check. With someone inside watching the frame corners and sill, run a garden hose gently over the head of the window, then the sides, then the sill, working upwards rather than spraying everywhere at once. Water inside the room, a damp patch on the plaster below the sill or water standing in the track all point to a fault to raise. In a condo, do this only where you can reach safely from inside, and never lean out.

A damp patch that appears below a window weeks later may be the window or the wall around it; the guide to a damp wall after renovation helps you tell which.

When the opening and the window are by different people

On a renovation the opening, the window, the tiling and the waterproofing are often by different people, and when a leak appears each one points at the next. Under the Consumer Protection Act 1999, section 57 gives a consumer a right of redress against a supplier of services that fails the implied guarantees. Section 58 then says there is no right of redress for some of those guarantees where the failure is due to an act, default or omission of a person other than the supplier.

In practice, that is a reason to keep the paperwork clear: who measured the opening, who supplied the units, who installed them and who sealed them. If you bought the windows yourself and paid only for fitting, the answer may be different again. How this applies to your job depends on your contracts; check with the Tribunal for Consumer Claims or a lawyer before relying on it.

How ClickBina fits in

In KL, Selangor and Putrajaya, we offer homeowners a third-party inspection of your contractor's work; if you want, we can also quote the repairs. We walk the new windows and doors against your quotation, drawings and order list, opening by opening, and we go through what we found with you. For windows in a house just handed over by a developer, see the new-home defect inspection page.

Sources & references

This page is general guidance, not legal advice. Your rights depend on your contract and the facts of the job.

Want a second pair of eyes on your renovation?

WhatsApp us to book a renovation inspection — we reply within the hour. Third-party inspection of your contractor's work; if you want, we can also quote the repairs. Any visit fee is confirmed with you on WhatsApp before we come. We cover KL, Selangor & Putrajaya.

💬 Book a renovation inspection
Reply within the hourVisit fee confirmed before we comeKL, Selangor & Putrajaya

Common Questions

When should I check a new window installation?
When the frame is fixed but before the gap around it is filled and plastered, and again at handover. The first visit is the only time you can see how the frame is fixed and packed.
My window is leaking after installation. Whose problem is it?
Usually the installer's first, if the leak is round the frame or through the sill. If the opening, the tiling or the balcony waterproofing were done by someone else, it can be shared. Keep a dated record of when it leaked and in what rain.
Should the gap around a new frame be filled with mortar?
The gap is filled and then sealed with a flexible sealant on the outside. Plaster or paint bridging the gap without a sealant tends to crack and let water in.
How do I know the glass is toughened?
Toughened glass usually has a small permanent mark etched in one corner. Ask the installer to show you the mark on each panel the quotation lists as safety glass.
What makes a sliding door overflow in heavy rain?
Most often a floor outside that does not fall away from the door, a track set flush with a wet floor, or weep slots blocked during installation. All three are worth checking before handover.
Do I need approval to change windows in a condo?
Usually yes, because the facade is common property or controlled by the by-laws. Check your by-laws and get the management office's written approval before ordering.
What should I collect at handover?
The keys for every lock, the order and glass details, care instructions for the frames and seals, and the installer's warranty letter if one was offered.