Replacing windows and torn between aluminium and uPVC? Here is how they compare on heat, noise, climate, repair and cost.
📍 We serve KL, Selangor & Putrajaya.

Aluminium is the default window frame in Malaysia: strong, rust-free, slim and available in almost any powder-coated colour. uPVC insulates better against heat and noise and does not corrode, but costs more and is less common locally. For most homes aluminium is enough; uPVC earns its price where traffic noise or a hot west-facing room is the real problem. ClickBina's doors and windows guide lists an aluminium casement window at RM250 – RM600 per panel and a uPVC casement at RM500 – RM1,200 per panel (indicative 2026, Klang Valley).
Aluminium windows are made from extruded aluminium sections, usually powder-coated, with the glass held in by rubber gaskets. They are what most Malaysian terraces and condos already have. uPVC windows are made from hollow, multi-chamber plastic profiles, usually white or with a foil finish, and often reinforced with steel inside for stiffness. They are common in Europe and increasingly offered here for premium homes and high-rise units where noise matters.
ClickBina's doors and windows guide sums up the trade-off: aluminium does not rust, is strong and low-maintenance, comes in a wide colour range and has slim sightlines, but conducts heat, though thermally broken versions exist; uPVC has excellent thermal and acoustic insulation and does not corrode or warp, but costs more, comes in limited colours and is less common locally.
| Aluminium | uPVC | |
|---|---|---|
| Strength and size | Strong; suits large sliding doors and wide panes | Stiffer with steel reinforcement; very large panes need care |
| Frame thickness | Slim frames, more glass | Chunkier frames, slightly less glass |
| Heat through the frame | Conducts heat unless thermally broken | Insulates well |
| Noise | Depends on seals and glass | Better seal; hollow chambers absorb vibration |
| Colours | Almost any powder-coat colour | Mostly white or foil finishes |
| Corrosion | Does not rust; coating can chalk or pit near the sea | Does not corrode |
| Local availability and repair | Everywhere; parts and fabricators easy to find | Fewer suppliers; parts tied to the system |
| Price | Lower | Higher |
In a hot room, most of the heat comes through the glass, not the frame. A west-facing bedroom with plain single glass will stay hot whether the frame is aluminium or uPVC. The frame matters more once the glass has been upgraded: with laminated or double glazing, an aluminium frame that is not thermally broken becomes the weak line around the pane, and a uPVC frame helps.
Noise is where the difference is clearest. ClickBina's soundproof windows guide explains that sound leaks through gaps first, so a casement that closes onto compressed seals beats a sliding window almost regardless of material. The doors and windows guide lists a uPVC frame over aluminium as an acoustic upgrade — a better seal, with a hollow-chamber frame that absorbs vibration — at a cost premium of about +50–100% over aluminium.
For a bedroom facing a highway or a busy road, a well-sealed uPVC casement with laminated glass is one of the strongest upgrades available. For a quiet street, a good aluminium casement with fresh seals may be all you need.
Heavy rain tests the seals and drainage, not the frame material. Both types need proper drainage slots, sloped sills and a sealed joint between frame and wall. Sun is a different matter: uPVC must be a profile stabilised for strong UV, or white frames can yellow and become brittle over time. Ask the supplier which profile system is used and where it has been installed in Malaysia. Aluminium's powder coating can chalk and fade in strong sun and pit near the sea, which is why the coating quality matters; our aluminium powder coating guide explains what to check.
The opening type often matters as much as the material. Sliding windows are compact and cheap, but their brush seals leak air, sound and wind-driven rain more than a casement. Casements close onto compressed gaskets and seal better, but need room to open and strong hinges and stays. Fixed panes seal best of all. Both aluminium and uPVC come in all three types; uPVC suppliers mostly push casement and tilt-and-turn styles, which is part of why uPVC windows test well for noise.
These figures are quoted from ClickBina's doors and windows guide (indicative 2026, Klang Valley). Sizes, glass, hardware and access change the final price.
| Item | Indicative price | Notes |
|---|---|---|
| Aluminium sliding window, per panel | RM200 – RM500 | The most common, lowest-cost option |
| Aluminium casement window, per panel (standard size) | RM250 – RM600 | Seals better than a slider |
| uPVC casement window, per panel | RM500 – RM1,200 | Better seals and insulation |
| uPVC frame instead of aluminium (acoustic upgrade) | About +50–100% over aluminium | Cost premium quoted as a percentage |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteWhen comparing quotes, check that each names the frame system, the glass type and thickness, the hardware, whether old frames are removed and how the gap to the wall is sealed and finished.
Aluminium windows are easy to repair in Malaysia: rollers, stays, handles, locks and rubber seals are stocked widely, and any fabricator can make a matching panel. Our window repair guide covers the common fixes. uPVC hardware is often specific to the profile system, so check that the supplier holds spares and will still be around. If you only replace a few windows, think about how they will look next to the rest; white uPVC beside bronze or black aluminium can look odd on a facade.
In condos, the management usually controls the facade. Check the house rules on window colour, material and opening type before ordering, and get approval in writing.
Window replacement is measured and quoted per opening. WhatsApp us your job details for a quote: the number of windows, their approximate sizes, the rooms and whether noise, heat or leaks are the main problem. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We reply within the hour, the price we agree is a flat price with no hidden charges, and a renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
How we estimated prices: every RM figure and the percentage premium on this page are quoted unchanged from ClickBina's doors and windows guide; they are indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.