Paint peeling off a sealant line, or a joint cracking again? The answer is usually the wrong tube in the wrong joint.
📍 We serve KL, Selangor & Putrajaya.

Use acrylic sealant for dry interior joints that will be painted: gaps along cornices, skirting, door and window frames and fine plaster cracks. Use silicone for joints that get wet or must stay flexible: around showers, baths, basins, sinks and worktops, and on glass. Acrylic can be painted over and cleans up with water, but it moves little and is not made for joints that sit in water. Silicone stays flexible and resists water, but paint will not stick to it and almost nothing bonds to its residue. Get the choice wrong and you either have peeling paint or a joint that cracks within months.
Both come in the same cartridge, both go in the same gun, and both are sold as sealant or caulk at the hardware shop. They are built for different jobs.
ClickBina's polyurethane vs silicone guide covers the outdoor side: facade, window and roof joints. This page is about joints inside the house.
| Property | Acrylic sealant | Silicone sealant |
|---|---|---|
| Can it be painted? | Yes, once a skin has formed (check the label) | No: paint beads and peels off it |
| Water resistance once cured | Fine for splashes; not for joints that sit wet | Made for wet joints |
| Movement | Low: for cracks and joints that hardly move | High: stays flexible |
| Clean-up while wet | Water | Solvent or wipes; it smears |
| Sanding and smoothing | Some products can be sanded once cured | Cannot be sanded |
| Mould resistance | Not its job | Sanitary grades carry a fungicide |
| Removing it later | Cuts and scrapes out; can be painted over | Must be cut out completely; residue blocks new sealant and paint |
| Typical places | Cornice, skirting, door frames, plaster gaps | Shower, bath, basin, sink, worktop, glass |
The manufacturer data sheets are clear about the job. Sika describes its Sikacryl-150 as a professional acrylic sealant for painters, for indoor connection joints with low movement in plaster, concrete, brick, board and wood, and for interior crack filling, as long as the cracks are not under permanent water immersion. In practice that means:
These are the gaps that show as thin shadows after a repaint. Sealing them before the last coat is a normal part of painting preparation.
Silicone is the choice wherever water sits on or runs over the joint, or where two different materials move against each other: the junction of a shower tray or kerb with the wall, the edge of a bath, the line between a basin or sink and the worktop, the back edge of a kitchen worktop against tiles, and glass in frames.
For bathrooms the right product is a sanitary-grade silicone, which contains a fungicide so the bead resists mould. ClickBina's silicone resealing guide explains the difference between acetoxy-cure silicone, which smells of vinegar, and neutral-cure types, and why the cheap general-purpose tube is a false economy in a shower.
If the joint will be painted, it is not a silicone joint. Ordinary paint does not stick to ordinary silicone: it beads while wet and flakes once dry, leaving a permanent shiny line in a matt wall. Once silicone has been used, the old bead and its thin residue film must be cut and cleaned off before anything else will hold.
Acrylic is the opposite. SikaSeal Acrylic, for example, is stated as able to be painted over using water-based paints. Always check the label for when paint can go on, and test a small area if you are using an unusual paint.
Acrylic moves very little. The Sikacryl-150 data sheet gives a movement capability of ± 10% and limits it to cracks and non-movement joints, and SikaSeal Acrylic declares ± 5%. That is enough for a settled hairline crack or a cornice gap. It is not enough for a joint that opens and closes every day.
A crack that returns along the same line after every repaint is usually a joint between two materials, for example where brick meets a concrete column. ClickBina's guide to cracks between brick and columns explains why those are cut out and filled with a flexible sealant or bridged with mesh, and the gypsum partition crack guide covers board joints. A wide, growing or stepped crack is a different matter and should be looked at before anything is filled.
Most failed joints fail at step one. A fresh line run over an old, mouldy or cracked bead looks right for a fortnight and then lifts in one piece.
Sealant is rarely priced on its own: it is part of painting preparation or of resealing a wet area. These figures are published on ClickBina's guides (indicative 2026, Klang Valley):
| Item | Indicative price | Source guide |
|---|---|---|
| Re-siliconing, rental handover context | RM150 – RM300 | Silicone resealing guide |
| Re-grouting, rental handover context | RM200 – RM600 | Silicone resealing guide |
| Extra prep before painting: crack filling, skim and sanding | RM0.50 – RM2 per sq ft | Ceiling hole patching guide |
| Walls and ceiling repaint, minor crack filling | RM3.00 – RM4.50 per sq ft | Ceiling hole patching guide |
WhatsApp us your job details for a quote — we reply within the hour. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteWhen comparing quotes for painting, check whether sealing gaps at cornices, skirting and frames is included in the preparation, and for a reseal, whether the old silicone is cut out completely rather than covered.
Painting is one of ClickBina's own trades. See ClickBina painting services for what a repaint covers. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so a reseal around the shower and a repaint can be planned together.
WhatsApp us your job details for a quote: where the joints are, roughly how many metres, and whether the area will be painted. We reply within the hour, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guide named in the table; they are indicative Klang Valley ranges for 2026, not fixed rates. Product properties are taken from the manufacturer data sheets named above; other brands differ, so read the label.
WhatsApp us your job details for a quote — we reply within the hour. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.